{
 "standard": "HASHFLOPS Contracted & Conversion Value Standard (CVS)",
 "version": "0.9.6",
 "valuation_date": "2026-11-20",
 "data_cut": "2026-11-18",
 "btc_spot": 62987.265625,
 "site_commit": "c888e4bda53864f63640bc511fb746beeb1337ad",
 "site_file": "src/data/mining/capacity_daily.json",
 "weights": {
  "bear": 0.2,
  "base": 0.6,
  "bull": 0.2
 },
 "params": {
  "cap_ig": {
   "bear": 0.075,
   "base": 0.065,
   "bull": 0.06
  },
  "cap_nig": {
   "bear": 0.095,
   "base": 0.085,
   "bull": 0.07
  },
  "r_contract": {
   "bear": 0.105,
   "base": 0.08,
   "bull": 0.07
  },
  "delay_years": {
   "bear": 1.0,
   "base": 0.0,
   "bull": 0.0
  },
  "margin_default": {
   "bear": 0.85,
   "base": 0.9,
   "bull": 0.95
  },
  "capex_mw_default": {
   "bear": 13.09,
   "base": 11.9,
   "bull": 11.305
  },
  "gpu_margin": {
   "bear": 0.8,
   "base": 0.85,
   "bull": 0.88
  },
  "gpu_r": {
   "bear": 0.18,
   "base": 0.14,
   "bull": 0.12
  },
  "gpu_residual": {
   "bear": 0.0,
   "base": 0.1,
   "bull": 0.15
  },
  "gpu_capex_to_tcv": {
   "bear": 0.598,
   "base": 0.598,
   "bull": 0.598
  },
  "p_T2": {
   "bear": 0.05,
   "base": 0.45,
   "bull": 0.6
  },
  "p_T3": {
   "bear": 0.1,
   "base": 0.3,
   "bull": 0.5
  },
  "p_T4": {
   "bear": 0.0,
   "base": 0.05,
   "bull": 0.15
  },
  "pipe_rent_ref": {
   "bear": 1.39494,
   "base": 1.39494,
   "bull": 1.39494
  },
  "pipe_rel_econ": {
   "bear": 0.7,
   "base": 0.8,
   "bull": 0.9
  },
  "pipe_it_gross": {
   "bear": 0.6,
   "base": 0.7,
   "bull": 0.75
  },
  "pipe_cap": {
   "bear": 0.075,
   "base": 0.07,
   "bull": 0.065
  },
  "pipe_r_dev": {
   "bear": 0.12,
   "base": 0.12,
   "bull": 0.1
  },
  "pipe_stab_T23": {
   "bear": "2031-01-01",
   "base": "2030-01-01",
   "bull": "2030-01-01"
  },
  "pipe_stab_T4": {
   "bear": "2032-01-01",
   "base": "2031-01-01",
   "bull": "2031-01-01"
  },
  "asic_factor": {
   "bear": 0.75,
   "base": 1.0,
   "bull": 1.7433
  },
  "asic_per_th": {
   "bear": 7.05,
   "base": 7.05,
   "bull": 7.05
  },
  "ga": {
   "bear": 45.0,
   "base": 30.0,
   "bull": 25.0
  },
  "ga_multiple": {
   "bear": 10.0,
   "base": 10.0,
   "bull": 10.0
  },
  "other_fin_incl": {
   "bear": 0.0,
   "base": 0.0,
   "bull": 1.0
  },
  "p_T0": {
   "bear": 0.0,
   "base": 0.0,
   "bull": 0.0
  },
  "p_T5": {
   "bear": 0.0,
   "base": 0.0,
   "bull": 0.0
  },
  "mining_rc_mw": {
   "bear": 0.3,
   "base": 0.45,
   "bull": 0.9
  }
 },
 "companies": {
  "BTDR": {
   "class": "L",
   "asic_base": 756.85,
   "asic_basis": "NAV v1.2 primary",
   "deferred_revenue": 0.0,
   "other_fin": 343.785,
   "penny_warrants_m": 0.0,
   "funded_capex": {
    "bear": 0.0,
    "base": 0.0,
    "bull": 0.0
   },
   "notes": "other_fin = collateral receivable at BIT Group (6-K Q3 2026, site v1.1 note); Bull only",
   "ledger_total": 3121,
   "ledger_basis": "G",
   "ledger_source": "6-K Q3 2026: Total Global Electrical Capacity 3,121.0 MW (site interim d3)",
   "market": {
    "price": 3.890000104904175,
    "price_date": "2026-11-18",
    "shares_m": 276.194816,
    "debt": 1980.629,
    "cash": 213.698,
    "nci": 0.0,
    "btc": 47.0,
    "bs_date": "2026-09-30",
    "d1": 1747.7,
    "d2": 2251.0,
    "d3": 3121.0
   }
  },
  "CIFR": {
   "class": "L",
   "asic_base": 0.0,
   "asic_basis": "no hashrate in site data (Odessa) - flag",
   "deferred_revenue": 0.0,
   "other_fin": 0.0,
   "penny_warrants_m": 24.178576,
   "funded_capex": {
    "bear": 2555.9,
    "base": 2196.585,
    "bull": 2196.585
   },
   "notes": "funded capex = restricted cash 30.09.2026 (project-note proceeds); Bear adds the $359.3m overrun cap",
   "ledger_total": 4300,
   "ledger_basis": "G",
   "ledger_source": "10-Q Q3 2026: ~4.3 GW grid capacity across 11 sites (site interim d3)",
   "market": {
    "price": 6.570000171661377,
    "price_date": "2026-11-18",
    "shares_m": 456.365113,
    "debt": 6700.412,
    "cash": 3597.994,
    "nci": 25.67,
    "btc": 310,
    "bs_date": "2026-09-30",
    "d1": 507.0,
    "d2": 907.0,
    "d3": 4300.0
   }
  },
  "CLSK": {
   "class": "L",
   "asic_base": 350.59,
   "asic_basis": "NAV v1.2 primary",
   "deferred_revenue": 0.0,
   "other_fin": 0.0,
   "penny_warrants_m": 0.0,
   "funded_capex": {
    "bear": 0.0,
    "base": 0.0,
    "bull": 0.0
   },
   "notes": "Balance sheet 30.06.2026 (10-K FY2026 pending) - stale flag; BTC 13,530 at 30.09.2026; Sandersville notes $2,276m (8-K 25.09.2026) in debt, net proceeds in cash (estimate)",
   "ledger_total": 1800,
   "ledger_basis": "G",
   "ledger_source": "site capacity v1.1: 1.8 GW contracted power = D2 = D3 (10-Q, operational update)",
   "btc_date": "2026-09-30",
   "btc_source": "September 2026 operational update (9 Oct 2026): 13,530 BTC, of which 3,475 posted as collateral for derivative transactions; monthly updates discontinued",
   "open_points": [
    "Rent before the Sandersville lease is fully running is not counted: the company's schedule has $5m in 2027 and $220m in 2028 (about $0.78 a share in the central scenario, discounted at the contract rate); the rule is reviewed for version 1.0.",
    "Part of the Sandersville build was paid before 30 June 2026 (construction in progress at all sites was $81.8m at that date, of which the Sandersville share is not disclosed); the full build cost is deducted while that cash is already gone from the balance sheet, so the value may be up to about $0.30 a share too low until the annual report shows what is left to spend.",
    "Cash includes the net proceeds of the $2,276m Sandersville notes issued at 98.5% on 25 September 2026 ($2,219m after fees, our estimate); part of them reimburses earlier spending and part funds a debt-service reserve."
   ],
   "market": {
    "price": 6.210000038146973,
    "price_date": "2026-11-18",
    "shares_m": 256.817073,
    "debt": 4087.559,
    "cash": 2425.439,
    "nci": 0.0,
    "btc": 13530,
    "bs_date": "2026-06-30",
    "d1": 808.0,
    "d2": 1800.0,
    "d3": 1800.0
   }
  },
  "CORZ": {
   "class": "L",
   "asic_base": 0.0,
   "asic_basis": "mining fleet held for sale, no hashrate disclosed",
   "deferred_revenue": 654.443,
   "other_fin": 0.0,
   "penny_warrants_m": 0.0,
   "funded_capex": {
    "bear": 0.0,
    "base": 0.0,
    "bull": 0.0
   },
   "notes": "deferred revenue = CoreWeave prepayments at 30.06.2026 (10-Q Q2, site contracts); AMD warrants 30m @ $23.47 out of the money - ignored",
   "ledger_total": 3215,
   "ledger_basis": "IT",
   "ledger_source": "10-Q Q3 2026: leasable 1,675 IT MW + AMD reservation capacity outside it ~1,540 IT (load study 600 + BTM 940; 8-K Ex.99.2) (site interim d3)",
   "mining_note": "mining in run-off, fleet held for sale; residual mining load not quantified by the company -> 0",
   "market": {
    "price": 14.050000190734863,
    "price_date": "2026-11-18",
    "shares_m": 322.2362,
    "debt": 4385.0,
    "cash": 1641.544,
    "nci": 0.0,
    "btc": 32,
    "bs_date": "2026-09-30",
    "d1": 630.5,
    "d2": 1456.0,
    "d3": 4552.0
   }
  },
  "HIVE": {
   "class": "M",
   "asic_base": 184.59,
   "asic_basis": "NAV v1.2 primary, results of 16 Nov 2026 (the figure on the miner NAV page)",
   "deferred_revenue": 0.0,
   "other_fin": 0.0,
   "penny_warrants_m": 0.0,
   "funded_capex": {
    "bear": 0.0,
    "base": 0.0,
    "bull": 0.0
   },
   "notes": "mining ~91% of revenue; two GPU cloud contracts with Bell AI Fabric (B200 since May 2026; GB200 for Cohere from early 2027, r7)",
   "ledger_total": 860,
   "ledger_basis": "G",
   "ledger_source": "fiscal Q2 2027 release: 440 energized + 100 Yguazu + 320 GTA (site interim d3)",
   "market": {
    "price": 1.409999966621399,
    "price_date": "2026-11-18",
    "shares_m": 276.878228,
    "debt": 275.378,
    "cash": 140.59,
    "nci": 0.0,
    "btc": 269.0,
    "bs_date": "2026-09-30",
    "d1": 440.0,
    "d2": 540.0,
    "d3": 860.0
   }
  },
  "HUT": {
   "class": "L",
   "asic_base": 229.61,
   "asic_basis": "NAV v1.2 primary (American Bitcoin, consolidated)",
   "deferred_revenue": 0.0,
   "other_fin": 0.0,
   "penny_warrants_m": 0.0,
   "funded_capex": {
    "bear": 6394.491,
    "base": 6394.491,
    "bull": 6394.491
   },
   "notes": "funded capex = restricted cash + restricted ST investments 30.09.2026 (River Bend, Beacon Point ph.1 notes)",
   "ledger_total": 8569,
   "ledger_basis": "G",
   "ledger_source": "10-Q Q3 2026 KPI: Total Energy Capacity Pipeline 8,569 MW (excl. River Bend ROFO)",
   "mining_note": "King Mountain JV 280 MW is managed for the JV, not owned infrastructure -> 0",
   "market": {
    "price": 57.189998626708984,
    "price_date": "2026-11-18",
    "shares_m": 121.554923,
    "debt": 7700.0,
    "cash": 6524.956,
    "nci": 369.843,
    "btc": 14639.0,
    "bs_date": "2026-09-30",
    "d1": 710.0,
    "d2": 2040.0,
    "d3": 8569.0
   }
  },
  "IREN": {
   "class": "G",
   "asic_base": 55.7,
   "asic_basis": "7.9 EH/s installed at 30 Sep 2026 (10-Q, as in the miner NAV inputs of 16 Nov 2026) x $7.05/TH",
   "deferred_revenue": 1842.546,
   "other_fin": 0.0,
   "penny_warrants_m": 0.0,
   "funded_capex": {
    "bear": 0.0,
    "base": 0.0,
    "bull": 0.0
   },
   "notes": "GPU cloud; data-hall capex for Horizon 1-4 assumed spent (flag)",
   "ledger_total": 5000,
   "ledger_basis": "G",
   "ledger_source": "10-K FY2026: ~5 GW total power capacity (site capacity v1.1 d3)",
   "open_points": [
    "Mining sites: the 380 MW rest on the 23.2 EH/s fleet of the June quarter, while the quarterly report of 30 September 2026 shows 7.9 EH/s installed; if the idle sites are not counted, the value falls by up to about $0.48 a share in the central scenario.",
    "A multi-year GPU cloud contract with a frontier AI lab, signed in August 2026, is not counted: its value is not disclosed (annual report for fiscal 2026). The first-quarter results of fiscal 2027 give contracted revenue of $20.3bn against $15.9bn for the three contracts counted, so the GPU cloud value shown is lower than the company's own total."
   ],
   "market": {
    "price": 15.239999771118164,
    "price_date": "2026-11-18",
    "shares_m": 424.357381,
    "debt": 10429.0,
    "cash": 6796.0,
    "nci": 0.0,
    "btc": 0,
    "bs_date": "2026-09-30",
    "d1": 2310.0,
    "d2": 2910.0,
    "d3": 5000.0
   }
  },
  "MARA": {
   "class": "M",
   "asic_base": 501.96,
   "asic_basis": "71.2 EH/s installed at 30 Sep 2026 (10-Q, as in the miner NAV inputs of 16 Nov 2026) x $7.05/TH",
   "deferred_revenue": 0.0,
   "other_fin": 0.0,
   "penny_warrants_m": 0.0,
   "funded_capex": {
    "bear": 0.0,
    "base": 0.0,
    "bull": 0.0
   },
   "notes": "no lease; Long Ridge (~$1.5bn) not closed at the data cut -> pipeline until closing (r6); hosted capacity excluded",
   "ledger_total": 4800,
   "ledger_basis": "G",
   "ledger_source": "10-Q: potential power portfolio ~4.8 GW (site capacity v1.1 d3)",
   "mining_note": "third-party hosted 551 MW is not MARA infrastructure -> 0",
   "open_points": [
    "Long Ridge (505 MW, about $1.5bn): the purchase had not closed at the data cut, so the site sits in the pipeline and its price is not deducted; at closing (expected 27 November 2026) the next edition counts it as powered capacity without a tenant and enters the price paid."
   ],
   "market": {
    "price": 6.559999942779541,
    "price_date": "2026-11-18",
    "shares_m": 387.406403,
    "debt": 2297.201,
    "cash": 1310.432,
    "nci": 96.227,
    "btc": 20415.0,
    "bs_date": "2026-09-30",
    "d1": 1900.0,
    "d2": 2405.0,
    "d3": 4800.0
   }
  },
  "RIOT": {
   "class": "L",
   "asic_base": 228.42,
   "asic_basis": "NAV v1.2 primary, results of 16 Nov 2026 (the figure on the miner NAV page)",
   "deferred_revenue": 0.0,
   "other_fin": 0.0,
   "penny_warrants_m": 0.0,
   "funded_capex": {
    "bear": 0.0,
    "base": 0.0,
    "bull": 0.0
   },
   "notes": "$573m interim facility excluded from debt (drawn amount undisclosed)",
   "ledger_total": 2000,
   "ledger_basis": "G",
   "ledger_source": "Q3 2026 deck: 2.0 GW = Texas 1,700 (Rockdale 700 + Corsicana 1,000) + Kentucky 300 (site interim d3)",
   "market": {
    "price": 18.239999771118164,
    "price_date": "2026-11-18",
    "shares_m": 375.183965,
    "debt": 674.512,
    "cash": 748.222,
    "nci": 0.0,
    "btc": 2418,
    "bs_date": "2026-09-30",
    "d1": 1332.0,
    "d2": 1932.0,
    "d3": 2000.0
   }
  },
  "WULF": {
   "class": "L",
   "asic_base": 69.09,
   "asic_basis": "9.8 EH/s installed at 30 Sep 2026 (10-Q, as in the miner NAV inputs of 16 Nov 2026) x $7.05/TH",
   "deferred_revenue": 0.0,
   "other_fin": 0.0,
   "penny_warrants_m": 73.58,
   "funded_capex": {
    "bear": 753.193,
    "base": 753.193,
    "bull": 753.193
   },
   "notes": "funded capex = restricted cash 30.09.2026 (Lake Mariner)",
   "ledger_total": 3632,
   "ledger_basis": "G",
   "ledger_source": "Lake Mariner 750 + Justified 482 + Muskie 1,000 + Cayuga 400 + Chesapeake 1,000 (10-Q, deck; site interim d3)",
   "market": {
    "price": 12.0,
    "price_date": "2026-11-18",
    "shares_m": 501.521605,
    "debt": 5725.0,
    "cash": 2355.32,
    "nci": 0.0,
    "btc": 18,
    "bs_date": "2026-09-30",
    "d1": 277.6,
    "d2": 982.0,
    "d3": 3632.0
   }
  }
 },
 "leases": [
  {
   "id": "L-CLSK-1",
   "ticker": "CLSK",
   "name": "Sandersville GA - Anviran LLC (Meta subsidiary, Meta guarantee), 175 MW IT, 20-yr NNN",
   "it_mw": 175,
   "tcv": 6560,
   "years": 20,
   "esc": 0.03,
   "margin": 1.0,
   "noi1": 254.0,
   "credit": "IG",
   "stab": "2029-01-01",
   "delivered": false,
   "capex": null,
   "evidence": "A",
   "source": "Investor presentation furnished with the current report on form 8-K of 17 September 2026, pages 3-4: rent schedule, 3.0% yearly increases, about 100% operating margin, about $11.9m per megawatt of server load, Meta guarantee https://www.sec.gov/Archives/edgar/data/827876/000119312526393758/clsk-ex99_1.htm ; Press release furnished with the current report on form 8-K of 14 July 2026: 175 MW of server load, 20 years, triple net, $6.6bn https://www.sec.gov/Archives/edgar/data/827876/000119312526302448/clsk-ex99_1.htm",
   "basis": "NOI1 = disclosed operating income of the first full year (2029) from the company's rent schedule; NOI margin ~100%",
   "ledger_mw": 250
  },
  {
   "id": "L-BTDR-1",
   "ticker": "BTDR",
   "name": "Tydal, Norway - Volta Tydal AS, 16-yr modified gross",
   "it_mw": 121,
   "tcv": 4700,
   "years": 16,
   "esc": 0.03,
   "margin": 0.9,
   "noi1": null,
   "credit": "NIG",
   "stab": "2027-04-01",
   "delivered": false,
   "capex": {
    "bear": 500,
    "base": 500,
    "bull": 500
   },
   "evidence": "A",
   "source": "Report on form 6-K of 4 August 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1899123/000121390026085655/ea030075201ex99-1.htm",
   "basis": "3% escalator, ~90% NOI margin and ~$500m remaining capex disclosed; tenant not rated, 10-yr no-fee exit",
   "ledger_mw": 133
  },
  {
   "id": "L-RIOT-1",
   "ticker": "RIOT",
   "name": "Rockdale - AMD 25 MW, 10-yr",
   "it_mw": 25,
   "tcv": 311,
   "years": 10,
   "esc": 0.03,
   "margin": null,
   "noi1": 25.0,
   "credit": "IG",
   "stab": "2026-06-01",
   "delivered": true,
   "capex": {
    "bear": 0,
    "base": 0,
    "bull": 0
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 16 January 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1167419/000110465926004551/riot-20260116xex99d1.htm",
   "basis": "NOI ~$25m/yr disclosed",
   "ledger_mw": 36
  },
  {
   "id": "L-RIOT-2",
   "ticker": "RIOT",
   "name": "Rockdale - AMD amendment +25 MW",
   "it_mw": 25,
   "tcv": 311,
   "years": 10,
   "esc": 0.03,
   "margin": null,
   "noi1": 25.0,
   "credit": "IG",
   "stab": "2027-05-01",
   "delivered": false,
   "capex": {
    "bear": 90,
    "base": 90,
    "bull": 90
   },
   "evidence": "D",
   "source": "Quarterly report on form 10-Q for the second quarter of 2026 (April 2026 amendment; value not disclosed) https://www.sec.gov/Archives/edgar/data/1167419/000110465926093448/riot-20260630x10q.htm",
   "basis": "April 2026 amendment +25 MW: 10 MW in Nov 2026, 15 MW in May 2027 (10-Q Q2 2026); value not disclosed -> same economics as L-RIOT-1 (D); retrofit $3.6m/MW disclosed for the initial phase",
   "ledger_mw": 36
  },
  {
   "id": "L-RIOT-3",
   "ticker": "RIOT",
   "name": "Rockdale - frontier AI lab 191 MW, 20-yr",
   "it_mw": 191,
   "tcv": 9100,
   "years": 20,
   "esc": 0.03,
   "margin": 0.85,
   "noi1": null,
   "credit": "NIG",
   "stab": "2028-07-01",
   "delivered": false,
   "capex": null,
   "evidence": "A",
   "source": "Current report on form 8-K of 10 August 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1167419/000110465926093406/riot-20260810xex99d1.htm",
   "basis": "20-yr to June 2048; NOI margin 80-90% disclosed -> 0.85; tenant not rated -> NIG",
   "ledger_mw": 273
  },
  {
   "id": "L-CORZ-1",
   "ticker": "CORZ",
   "name": "CoreWeave ~590 MW, 12-yr licences",
   "it_mw": 590,
   "tcv": 10200,
   "years": 12,
   "esc": 0.03,
   "margin": 0.877,
   "noi1": null,
   "credit": "NIG",
   "stab": "2027-03-01",
   "delivered": false,
   "capex": {
    "bear": 420,
    "base": 420,
    "bull": 420
   },
   "evidence": "B",
   "source": "https://www.businesswire.com/news/home/20250226866161/en ; margin: 10-Q Q3 2026 segment data via site (licence revenue ex pass-through power, cash cost ex power and depreciation)",
   "basis": "485 of 590 MW billing at 30.09.2026; remaining 105 MW x $4m (CoreWeave funds conversion capex) - D",
   "ledger_mw": 590
  },
  {
   "id": "L-CORZ-2",
   "ticker": "CORZ",
   "name": "AMD direct 377 MW, 15-yr",
   "it_mw": 377,
   "tcv": 9977.3,
   "years": 15,
   "esc": 0.03,
   "margin": null,
   "noi1": null,
   "credit": "IG",
   "stab": "2028-01-01",
   "delivered": false,
   "capex": null,
   "evidence": "A",
   "source": "Current report on form 8-K of 27 July 2026, item 7.01 https://www.sec.gov/Archives/edgar/data/1839341/000183934126000012/core-20260727.htm ; Second-quarter 2026 results release https://www.sec.gov/Archives/edgar/data/1839341/000183934126000013/q22026corescientificinc-ea.htm ; Quarterly report on form 10-Q for the third quarter of 2026 https://www.sec.gov/Archives/edgar/data/1839341/000183934126000030/core-20260930.htm",
   "basis": "$14bn for 529 MW split pro rata by MW",
   "ledger_mw": 377
  },
  {
   "id": "L-CORZ-3",
   "ticker": "CORZ",
   "name": "Neocloud 152 MW, AMD credit-support agreement, 15-yr",
   "it_mw": 152,
   "tcv": 4022.7,
   "years": 15,
   "esc": 0.03,
   "margin": null,
   "noi1": null,
   "credit": "NIG",
   "stab": "2028-01-01",
   "delivered": false,
   "capex": null,
   "evidence": "A",
   "source": "Current report on form 8-K of 27 July 2026, item 7.01 (credit-support agreements) https://www.sec.gov/Archives/edgar/data/1839341/000183934126000012/core-20260727.htm ; Second-quarter 2026 results release https://www.sec.gov/Archives/edgar/data/1839341/000183934126000013/q22026corescientificinc-ea.htm",
   "basis": "pro rata share of $14bn; NIG: under the credit-support agreements AMD has the right, not the obligation, to cure tenant defaults (8-K 27.07.2026) - not a guarantee",
   "ledger_mw": 152
  },
  {
   "id": "L-CIFR-1",
   "ticker": "CIFR",
   "name": "Barber Lake - Fluidstack 10-yr (Google backstop) + AI lab 10-yr",
   "it_mw": 210,
   "tcv": 9000,
   "years": 20,
   "esc": 0.03,
   "margin": 0.896,
   "noi1": null,
   "credit": "IG",
   "stab": "2027-04-01",
   "delivered": false,
   "capex": {
    "bear": 0,
    "base": 0,
    "bull": 0
   },
   "evidence": "B",
   "source": "https://finviz.com/news/395540/cipher-digital-expands-barber-lake-lease-term-to-20-years-increasing-revenue-to-over-9-billion ; margin: $669m avg NOI on $9.3bn (Q4 2025 call, https://quartr.com/events/cipher-digital-inc-cifr-q4-2025_ofjNlFYP)",
   "basis": "IT MW = 300 gross x 0.7 (D); capex funded at company level",
   "ledger_mw": 300
  },
  {
   "id": "L-CIFR-2",
   "ticker": "CIFR",
   "name": "Black Pearl - AWS 300 MW gross, 15-yr",
   "it_mw": 216,
   "tcv": 5500,
   "years": 15,
   "esc": 0.03,
   "margin": 0.896,
   "noi1": null,
   "credit": "IG",
   "stab": "2027-07-01",
   "delivered": false,
   "capex": {
    "bear": 0,
    "base": 0,
    "bull": 0
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 3 November 2025, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1819989/000181998925000110/nov3_earningspressreleasex.htm",
   "basis": "216 IT MW per site capacity note",
   "ledger_mw": 300
  },
  {
   "id": "L-CIFR-3",
   "ticker": "CIFR",
   "name": "Stingray - AWS 70 IT MW, 15-yr",
   "it_mw": 70,
   "tcv": 2000,
   "years": 15,
   "esc": 0.03,
   "margin": 0.99,
   "noi1": null,
   "credit": "IG",
   "stab": "2027-05-01",
   "delivered": false,
   "capex": {
    "bear": 0,
    "base": 0,
    "bull": 0
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 8 June 2026, exhibit 99.1 (Stingray presentation) https://www.sec.gov/Archives/edgar/data/1819989/000095010326008635/dp248110_ex9901.htm",
   "basis": "70 IT MW, ~$2.0bn, 15 yr + 3x5, NNN, ~100% NOI margin -> 0.99, 3% escalator; rent from 1 Apr 2027 (10 MW) and 1 May 2027 (60 MW); Amazon.com guarantees base rent; build funded by the Stingray notes (restricted cash, block B8)",
   "ledger_mw": 100
  },
  {
   "id": "L-WULF-1",
   "ticker": "WULF",
   "name": "Lake Mariner - Fluidstack 378 MW (Google backstop), 10-yr",
   "it_mw": 378,
   "tcv": 7035,
   "years": 10,
   "esc": 0.03,
   "margin": 0.85,
   "noi1": null,
   "credit": "IG",
   "stab": "2027-04-01",
   "delivered": false,
   "capex": {
    "bear": 0,
    "base": 0,
    "bull": 0
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 14 August 2025, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1083301/000110465925078084/tm2523008d2_ex99-1.htm ; Current report on form 8-K of 18 August 2025, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1083301/000110465925079463/tm2523651d3_ex99-1.htm ; Presentation for the fourth quarter of 2025 (378 MW) https://www.sec.gov/Archives/edgar/data/1083301/000108330126000026/terawulfq42025investorpr.htm",
   "basis": "$6.7bn for 360 MW scaled to 378 MW (July 2026 amendment); escalator rate not disclosed (3%); capex funded at company level",
   "ledger_mw": 472.5
  },
  {
   "id": "L-WULF-2",
   "ticker": "WULF",
   "name": "Lake Mariner - Core42 60 MW, 10-yr",
   "it_mw": 60,
   "tcv": 1031.7,
   "years": 10,
   "esc": 0.03,
   "margin": 0.85,
   "noi1": null,
   "credit": "NIG",
   "stab": "2026-07-01",
   "delivered": true,
   "capex": {
    "bear": 0,
    "base": 0,
    "bull": 0
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 26 December 2024, exhibit 99.1 (call transcript) https://www.sec.gov/Archives/edgar/data/1083301/000095014224002999/eh240572111_ex9901.htm",
   "basis": "$125/kW-month x 60 IT MW = $90m in year 1, 3% escalator, 10 yr + 2x5: TCV = 90 x (1.03^10 - 1)/0.03 = $1,031.7m; G42 corporate guarantee (call of 26.12.2024); all Core42 leases commenced (10-Q Q3 2026)",
   "ledger_mw": 75
  },
  {
   "id": "L-WULF-3",
   "ticker": "WULF",
   "name": "Justified KY - Anthropic 401 MW, 20-yr",
   "it_mw": 401,
   "tcv": 19000,
   "years": 20,
   "esc": 0.03,
   "margin": null,
   "noi1": null,
   "credit": "NIG",
   "stab": "2028-04-01",
   "delivered": false,
   "capex": {
    "bear": 4000,
    "base": 3500,
    "bull": 3000
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 6 July 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1083301/000110465926080583/tm2619468d1_ex99-1.htm ; Current report on form 8-K of 4 November 2026 https://www.sec.gov/Archives/edgar/data/1083301/000162828026069810/wulf-20261104.htm",
   "basis": "tenant not rated -> NIG; escalator 3% assumed",
   "ledger_mw": 482
  },
  {
   "id": "L-HUT-1",
   "ticker": "HUT",
   "name": "River Bend LA - Fluidstack 245 MW (Google AA+ backstop), 15-yr NNN",
   "it_mw": 245,
   "tcv": 7000,
   "years": 15,
   "esc": 0.03,
   "margin": 0.9729,
   "noi1": null,
   "credit": "IG",
   "stab": "2027-10-01",
   "delivered": false,
   "capex": {
    "bear": 0,
    "base": 0,
    "bull": 0
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 17 December 2025, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1964789/000110465925122052/hut-20251217xex99d1.htm",
   "basis": "margin = 454 / (7000/15); capex funded at company level",
   "ledger_mw": 330
  },
  {
   "id": "L-HUT-2",
   "ticker": "HUT",
   "name": "Beacon Point TX ph.1 - high-IG tenant 352 MW, 15-yr NNN",
   "it_mw": 352,
   "tcv": 9800,
   "years": 15,
   "esc": 0.03,
   "margin": 0.99,
   "noi1": null,
   "credit": "IG",
   "stab": "2028-01-01",
   "delivered": false,
   "capex": {
    "bear": 0,
    "base": 0,
    "bull": 0
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 6 May 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1964789/000110465926055894/hut-20260506xex99d1.htm ; Current report on form 8-K of 20 July 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm",
   "basis": "NNN take-or-pay; escalator 3% assumed; capex funded at company level",
   "ledger_mw": 500
  },
  {
   "id": "L-HUT-3",
   "ticker": "HUT",
   "name": "Beacon Point TX ph.2 - same tenant 352 MW, 15-yr NNN",
   "it_mw": 352,
   "tcv": 9800,
   "years": 15,
   "esc": 0.03,
   "margin": 0.99,
   "noi1": null,
   "credit": "IG",
   "stab": "2029-01-01",
   "delivered": false,
   "capex": {
    "bear": 4607.7,
    "base": 4250.0,
    "bull": 3979.4
   },
   "evidence": "A",
   "source": "Current report on form 8-K of 20 July 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1964789/000110465926084862/tm2620835d1_ex99-1.htm",
   "basis": "capex Base = ph.1 notes $4.25bn / 352 MW; Bear/Bull = 352 x 13.09 / 11.305",
   "ledger_mw": 500
  },
  {
   "id": "L-RIOT-4",
   "ticker": "RIOT",
   "name": "Corsicana TX - frontier AI lab 910 IT MW, 15-yr NNN powered land lease (binding 04.11.2026)",
   "it_mw": 910,
   "tcv": 28000,
   "years": 15,
   "esc": 0.03,
   "margin": 0.99,
   "noi1": 1405.4,
   "credit": "NIG",
   "stab": "2028-01-01",
   "delivered": false,
   "capex": {
    "bear": 6006.0,
    "base": 5460.0,
    "bull": 5460.0
   },
   "ledger_mw": 1000,
   "evidence": "A",
   "source": "Current report on form 8-K of 4 November 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1167419/000110465926122368/riot-ex99d1.htm",
   "basis": "NOI1 = $130/kW-month x 910 MW x 12 x 0.99 NOI margin = $1,405.4m (base rent disclosed; the $28bn TCV is not used - it implies a higher year-1 rent); rent starts by phase: 400 MW Sep-27, 200 MW Jan-28, 310 MW Jul-28 -> MW-weighted start ~2028-01-01; capex $6m/IT MW = $2m Riot build + $4m tenant module reimbursement ($5.5bn disclosed), Bear +10%; tenant not disclosed by the company, no investment-grade credit support -> NIG (rule P8); 1.0 GW utility load = ledger 1,000 MW"
  }
 ],
 "gpu_contracts": [
  {
   "id": "G-IREN-1",
   "ticker": "IREN",
   "name": "Microsoft GB300, 5-yr (Childress Horizon 1-4)",
   "tcv": 9700,
   "years": 5,
   "start": "2026-12-01",
   "capex": 5800,
   "undelivered": 0.75,
   "evidence": "B",
   "source": "https://irisenergy.gcs-web.com/news-releases/news-release-details/iren-secures-97bn-ai-cloud-contract-microsoft",
   "basis": "Dell GPUs $5.8bn disclosed; 3 of 4 Horizons undelivered at 30.09.2026 (D)",
   "ledger_mw": 286
  },
  {
   "id": "G-IREN-2",
   "ticker": "IREN",
   "name": "NVIDIA cloud services, 5-yr",
   "tcv": 3400,
   "years": 5,
   "start": "2027-01-01",
   "capex": null,
   "undelivered": 1.0,
   "evidence": "A",
   "source": "Annual report on form 10-K for fiscal 2026 https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm",
   "basis": "capex = 0.598 x TCV (D)",
   "ledger_mw": 100
  },
  {
   "id": "G-IREN-3",
   "ticker": "IREN",
   "name": "Prometheus, Perplexity, Together AI",
   "tcv": 2800,
   "years": 4,
   "start": "2027-01-01",
   "capex": null,
   "undelivered": 1.0,
   "evidence": "A",
   "source": "Annual report on form 10-K for fiscal 2026 https://www.sec.gov/Archives/edgar/data/1878848/000187884826000052/iren-20260630.htm ; Current report on form 8-K of 20 July 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1878848/000114036126028871/ef20078253_ex99-1.htm",
   "basis": "'multi-year' -> 4 years (D); capex = 0.598 x TCV (D)",
   "ledger_mw": 83
  },
  {
   "id": "G-BTDR-1",
   "ticker": "BTDR",
   "name": "AI Cloud backlog",
   "tcv": 2900,
   "years": 5,
   "start": "2027-01-01",
   "capex": null,
   "undelivered": 0.85,
   "evidence": "A",
   "source": "Report on form 6-K of 10 November 2026 (third-quarter results), exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1899123/000121390026117797/ea031140301ex99-1.htm",
   "basis": "5-yr GB300 contracts; undelivered = 1 - ARR $86m / ($2.9bn / 5) (D); capex = 0.598 x TCV (D)",
   "ledger_mw": 33.2
  },
  {
   "id": "G-HIVE-1",
   "ticker": "HIVE",
   "name": "Bell AI Fabric B200, 2-yr",
   "tcv": 30,
   "years": 2,
   "start": "2026-05-01",
   "capex": null,
   "undelivered": 0.0,
   "evidence": "A",
   "source": "Quarterly report on form 10-Q for the quarter to 30 September 2026 https://www.sec.gov/Archives/edgar/data/1720424/000106299326005842/form10q.htm",
   "basis": "operational May 2026",
   "ledger_mw": 0
  },
  {
   "id": "G-HIVE-2",
   "ticker": "HIVE",
   "name": "Bell AI Fabric for Cohere, GB200, 3-yr",
   "tcv": 220,
   "years": 3,
   "start": "2027-01-01",
   "capex": null,
   "undelivered": 1.0,
   "evidence": "A",
   "source": "Current report on form 8-K of 22 June 2026, exhibit 99.1 https://www.sec.gov/Archives/edgar/data/1720424/000106299326003293/exhibit99-1.htm ; Quarterly report on form 10-Q for the quarter to 30 September 2026 (GPU loan of $128.9m) https://www.sec.gov/Archives/edgar/data/1720424/000106299326005842/form10q.htm",
   "basis": "3-yr contract ~$220m, 2,304 GB200 GPUs, live late 2026 to early 2027 -> start 1 Jan 2027; GPU cost not disclosed -> standard ratio to TCV; whole cost still to spend (deposits paid by 30.09.2026 not attributed)",
   "ledger_mw": 0
  }
 ],
 "pipeline": [
  {
   "id": "P-CLSK-1",
   "ticker": "CLSK",
   "name": "Texas (Sealy, Brazoria) - LOI/exclusivity of the Sandersville tenant",
   "mw": 885,
   "basis": "G",
   "tier": "T2",
   "share": 1.0,
   "ledger_mw": 885,
   "source": "Current report on form 8-K of 14 July 2026, item 8.01: letter of intent and exclusivity over 718 acres with up to 885 MW https://www.sec.gov/Archives/edgar/data/827876/000119312526302448/clsk-20260710.htm",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-CLSK-2",
   "ticker": "CLSK",
   "name": "Other energized mining sites (GA, TN, WY, MS) = 1,800 - 250 - 885",
   "mw": 665,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 665,
   "source": "derived from ledger (D)",
   "mining_mw": 665,
   "mining_basis": "energized mining sites GA/TN/WY/MS; utilized 808 MW (Sept 2026) incl. Sandersville before conversion; nameplate 1,027 MW at 30.09.2025 (10-K)"
  },
  {
   "id": "P-BTDR-1",
   "ticker": "BTDR",
   "name": "Rockdale 742, Knoxville 86, Wenatchee 13, Molde 84, Massillon 221, Tydal halls 47",
   "mw": 1193,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 1193,
   "source": "6-K Power Infrastructure Summary (site capacity notes)",
   "mining_mw": 931.5,
   "mining_basis": "D1 online 1,747.7 MW - Bhutan/Ethiopia 650 - Tydal lease 133 - Malaysia GPU 33.2 (derived, D); Massillon and Rockdale expansion not yet energized"
  },
  {
   "id": "P-BTDR-2",
   "ticker": "BTDR",
   "name": "Weathersfield 300 (Q4'28), Clarington 570 (litigation), Fox Creek 101",
   "mw": 971,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 971,
   "source": "6-K (site capacity notes)",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-BTDR-3",
   "ticker": "BTDR",
   "name": "Other Q3 additions to 3,121 MW (A901, A202, A103 ...)",
   "mw": 140.8,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 140.8,
   "source": "derived from ledger (D)",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-BTDR-4",
   "ticker": "BTDR",
   "name": "Bhutan (Gedu 100, Jigmeling 500), Ethiopia (Oromia 50) - no hyperscale market",
   "mw": 650,
   "basis": "G",
   "tier": "T5",
   "share": 1.0,
   "ledger_mw": 650,
   "source": "6-K (site capacity notes)",
   "mining_mw": 650,
   "mining_basis": "Bhutan Gedu 100 + Jigmeling 500, Ethiopia 50 - operating mining sites (6-K)"
  },
  {
   "id": "P-RIOT-1",
   "ticker": "RIOT",
   "name": "Rockdale remainder (700 - 345 under lease)",
   "mw": 355,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 355,
   "source": "derived (D)",
   "mining_mw": 355,
   "mining_basis": "Rockdale 700 developed - 345 under lease (10-Q developed capacity)"
  },
  {
   "id": "P-RIOT-2",
   "ticker": "RIOT",
   "name": "Kentucky developed 232 MW",
   "mw": 232,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 232,
   "source": "10-Q Q3 2026 (site interim d1)",
   "mining_mw": 232,
   "mining_basis": "Kentucky 232 MW developed (10-Q Q3 2026)"
  },
  {
   "id": "P-RIOT-3",
   "ticker": "RIOT",
   "name": "Kentucky remainder ~68 MW, no timing",
   "mw": 68,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 68,
   "source": "Q3 deck (site interim d3)",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-CORZ-1",
   "ticker": "CORZ",
   "name": "AMD reservation right - identified capacity (load study 600 + BTM 940 IT MW) to 28.12.2028",
   "mw": 1540,
   "basis": "IT",
   "tier": "T2",
   "share": 1.0,
   "ledger_mw": 1540,
   "source": "8-K Ex.99.2 via site interim d3",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-CORZ-2",
   "ticker": "CORZ",
   "name": "Leasable not leased (1,675 - 1,119 IT MW)",
   "mw": 556,
   "basis": "IT",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 556,
   "source": "10-Q Q3 2026 metrics via site interim",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-CIFR-1",
   "ticker": "CIFR",
   "name": "Odessa 207 MW owned mining site",
   "mw": 207,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 207,
   "source": "site capacity v1.1",
   "mining_mw": 207,
   "mining_basis": "Odessa 207 MW wholly owned mining site (10-Q)"
  },
  {
   "id": "P-CIFR-2",
   "ticker": "CIFR",
   "name": "Grid pipeline ~3.4 GW (4,300 - 907)",
   "mw": 3393,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 3393,
   "source": "10-Q Q3 2026 via site interim",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-WULF-1",
   "ticker": "WULF",
   "name": "Lake Mariner remainder (750 - 547.5 under lease)",
   "mw": 202.5,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 202.5,
   "source": "derived (D); Lake Mariner gross/IT 1.25 disclosed",
   "mining_mw": 145,
   "mining_basis": "Lake Mariner in-service mining load 145 MW (being repurposed) - capped by the 202.5 MW remainder"
  },
  {
   "id": "P-WULF-2",
   "ticker": "WULF",
   "name": "Muskie KY 1,000 MW (Kentucky Power ESA, service Q4 2028)",
   "mw": 1000,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 1000,
   "source": "10-Q via site contracts WULF",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-WULF-3",
   "ticker": "WULF",
   "name": "Cayuga 400, Chesapeake 1,000 (acquisition pending)",
   "mw": 1400,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 1400,
   "source": "site interim d3",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-HUT-1",
   "ticker": "HUT",
   "name": "River Bend ROFO - Fluidstack up to 1,000 IT MW (outside the 8,569 MW pipeline)",
   "mw": 1000,
   "basis": "IT",
   "tier": "T2",
   "share": 1.0,
   "ledger_mw": 0,
   "source": "https://finviz.com/news/255928/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-70-billion",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-HUT-2",
   "ticker": "HUT",
   "name": "Owned energized sites under management (710 - 280 King Mountain)",
   "mw": 430,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 430,
   "source": "10-Q KPI via site",
   "mining_mw": 430,
   "mining_basis": "owned ASIC-compute sites under management (Alpha NY, Medicine Hat, Salt Creek, Vega, Drumheller): 710 - 280 King Mountain JV"
  },
  {
   "id": "P-HUT-3",
   "ticker": "HUT",
   "name": "King Mountain JV managed services 280 MW",
   "mw": 280,
   "basis": "G",
   "tier": "T5",
   "share": 1.0,
   "ledger_mw": 280,
   "source": "10-Q KPI via site",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-HUT-4",
   "ticker": "HUT",
   "name": "Development 49 + exclusivity 3,180 + diligence 3,300",
   "mw": 6529,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 6529,
   "source": "10-Q Q3 2026 KPI via site interim",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-IREN-1",
   "ticker": "IREN",
   "name": "Childress remainder (750 - 469 for GPU contracts)",
   "mw": 281,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 281,
   "source": "derived (D)",
   "mining_mw": 220,
   "mining_basis": "Childress mining being decommissioned: ~380 MW mining (23.2 EH/s) - 160 MW Canada"
  },
  {
   "id": "P-IREN-2",
   "ticker": "IREN",
   "name": "Sweetwater 1 (1,400 MW energized substation)",
   "mw": 1400,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 1400,
   "source": "10-K site table via site capacity",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-IREN-3",
   "ticker": "IREN",
   "name": "Sweetwater 2 (600 MW, ERCOT batch zero, 2028)",
   "mw": 600,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 600,
   "source": "site capacity",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-IREN-4",
   "ticker": "IREN",
   "name": "Canada (Canal Flats, Prince George, Mackenzie) - own AI cloud / mining",
   "mw": 160,
   "basis": "G",
   "tier": "T0",
   "share": 1.0,
   "ledger_mw": 160,
   "source": "10-K site table",
   "mining_mw": 160,
   "mining_basis": "Canada: Canal Flats 30, Prince George 50, Mackenzie 80 (10-K site table)"
  },
  {
   "id": "P-IREN-5",
   "ticker": "IREN",
   "name": "Kiowa OK, Bundey AU, Badajoz ES (5,000 - 2,910)",
   "mw": 2090,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 2090,
   "source": "site capacity d3",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-HIVE-1",
   "ticker": "HIVE",
   "name": "Boden ~25 MW co-location LOI",
   "mw": 25,
   "basis": "G",
   "tier": "T2",
   "share": 1.0,
   "ledger_mw": 25,
   "source": "site contracts HIVE",
   "mining_mw": 25,
   "mining_basis": "Boden energized"
  },
  {
   "id": "P-HIVE-2",
   "ticker": "HIVE",
   "name": "New Brunswick 70 IT MW Tier-III conversion candidate (~100 gross)",
   "mw": 100,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 100,
   "source": "site contracts HIVE",
   "mining_mw": 100,
   "mining_basis": "New Brunswick energized mining (Tier-III conversion candidate)"
  },
  {
   "id": "P-HIVE-3",
   "ticker": "HIVE",
   "name": "Other energized Canada/Sweden (440 - 200 Paraguay - 100 - 25)",
   "mw": 115,
   "basis": "G",
   "tier": "T3",
   "share": 1.0,
   "ledger_mw": 115,
   "source": "derived (D)",
   "mining_mw": 115,
   "mining_basis": "other energized Canada/Sweden"
  },
  {
   "id": "P-HIVE-4",
   "ticker": "HIVE",
   "name": "Paraguay Yguazu 300 MW (200 + 100 in Q4 2026)",
   "mw": 300,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 300,
   "source": "site interim d2",
   "mining_mw": 200,
   "mining_basis": "Paraguay Yguazu 200 MW energized (+100 MW in Q4 2026 not counted)"
  },
  {
   "id": "P-HIVE-5",
   "ticker": "HIVE",
   "name": "GTA 'Gigafactory' ~320 MW",
   "mw": 320,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 320,
   "source": "site interim d3",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-MARA-1",
   "ticker": "MARA",
   "name": "Third-party hosted ~29% of 1.9 GW",
   "mw": 551,
   "basis": "G",
   "tier": "T5",
   "share": 1.0,
   "ledger_mw": 551,
   "source": "10-Q Q3 2026: hosted sites ~29% of capacity (site cost inputs)",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  },
  {
   "id": "P-MARA-2",
   "ticker": "MARA",
   "name": "Owned sites ~71% of 1.9 GW via Starwood JV (MARA <= 50%)",
   "mw": 1349,
   "basis": "G",
   "tier": "T3",
   "share": 0.5,
   "ledger_mw": 1349,
   "source": "10-Q Q3 2026 via site; Starwood strategic agreement",
   "mining_mw": 1349,
   "mining_basis": "owned mining sites ~71% of 1.9 GW, 100% owned today (the JV share applies to conversion only)"
  },
  {
   "id": "P-MARA-3",
   "ticker": "MARA",
   "name": "Long Ridge OH 505 MW (CCGT, IG hyperscaler indications of interest)",
   "mw": 505,
   "basis": "G",
   "tier": "T4",
   "share": 1.0,
   "ledger_mw": 505,
   "source": "10-Q via site contracts MARA",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row",
   "tier_note": "r6: acquisition not closed at the data cut (expected 27 Nov 2026) -> pipeline until closing (rule B3.4)"
  },
  {
   "id": "P-MARA-4",
   "ticker": "MARA",
   "name": "Matagorda 2,000 + other portfolio 395 via JV (<= 50%)",
   "mw": 2395,
   "basis": "G",
   "tier": "T4",
   "share": 0.5,
   "ledger_mw": 2395,
   "source": "site capacity d3",
   "mining_mw": 0,
   "mining_basis": "no built mining infrastructure in this row"
  }
 ],
 "fingerprint_sha256": "b40059cbfd5980d94d9590bd49d20b176a680e9f969aca8e51c409f4e8acd084"
}