 "analysis": [
  "In the central scenario the model values CleanSpark, Inc. at $6.12 a share; the share price was $6.21 on 18 November 2026. Per share the value adds up as follows: signed leases $5.45, the chance of new leases on capacity that has none yet $2.46, mining sites at the cost to rebuild them $1.17, mining machines $1.37; less company overhead $1.17, and debt and other claims net of cash and bitcoin $3.15.",
  "Across the three scenarios the value runs from $0.00 (cautious) to $19.06 (optimistic). Weighting them 20%, 60% and 20% gives $7.49, 21% above the share price; the price is within the range. The optimistic scenario supplies 51% of the weighted average.",
  "The share price is consistent with valuing the signed leases at a 6.5% cap rate (a year's operating income divided by the property value), against 6.5% for investment-grade tenants and 8.5% for other tenants in the central scenario. A higher cap rate means a lower value.",
  "The share price is consistent with leasing 42% of the capacity that has no lease yet; the central scenario assumes 40% when weighted by value.",
  "Leasing all convertible capacity would need about $12.91bn of building work, 8.1 times the company's stock-market value, and would give $9.78 a share in the central scenario. In the cautious scenario new building does not pay for itself, so the value with all capacity leased is $0.00.",
  "665 MW of mining sites are counted at $0.45m per MW, the cost to rebuild them without the machines: $299m in total. At $0.5m per MW, the level at which operating sites sold in 2026, the central value would be $6.21 a share."
 ],
 "balance": {
  "bs_date": "2026-06-30",
  "btc": 13530,
  "btc_value": 852.2177,
  "cash": 2425.439,
  "d1": 808.0,
  "d2": 1800.0,
  "d3": 1800.0,
  "debt": 4087.559,
  "deferred_revenue": 0.0,
  "funded_capex": {
   "base": 0.0,
   "bear": 0.0,
   "bull": 0.0
  },
  "nci": 0.0,
  "notes": "Balance sheet at 30 June 2026 (the annual report for fiscal 2026 is still to come); debt and cash include the $2,276m Sandersville notes of 25 September 2026; bitcoin count 13,530 at 30 September 2026 (operational update of 9 October 2026), of which 3,475 posted as collateral for derivatives.",
  "other_fin": 0.0,
  "penny_warrants_m": 0.0,
  "price_date": "2026-11-18",
  "shares_m": 256.8171
 },
 "blocks": [
  {
   "code": "B1",
   "counted": "1 lease, 175 MW of server load",
   "findings": [
    {
     "level": "note",
     "text": "Sandersville, Georgia — Anviran, LLC (a Meta subsidiary; Meta guarantees rent and operating expenses), 175 MW, 20 years: construction cost not disclosed; the standard $11.9m per megawatt of server load is used."
    }
   ],
   "name": "Signed leases",
   "per_share": 5.4542,
   "rule": "A year of operating income ÷ cap rate by tenant credit, discounted to the year the lease is fully running, less construction still to pay.",
   "status": "note",
   "value_m": 1400.7225
  },
  {
   "code": "B2",
   "counted": "none",
   "findings": [],
   "name": "GPU cloud contracts",
   "per_share": 0.0,
   "rule": "Cash margin over the contract, plus what the GPUs are worth at the end, less the GPUs not yet delivered.",
   "status": "ok",
   "value_m": 0
  },
  {
   "code": "B3",
   "counted": "1,800 MW of grid power in 7 statuses",
   "findings": [
    {
     "level": "open",
     "text": "Other mining sites (Georgia, Tennessee, Wyoming, Mississippi): 665.0 MW is our estimate (company total less the sites it lists)."
    }
   ],
   "name": "Capacity breakdown",
   "per_share": null,
   "rule": "Every megawatt the company reports in one status; the statuses add up to the company's total within 0.5%.",
   "status": "open",
   "value_m": null
  },
  {
   "code": "B4",
   "counted": "1,550 MW that could be leased",
   "findings": [
    {
     "level": "note",
     "text": "Chances of a lease for powered sites (30% central, calibrated on observed leasing, rule B4.5) and the pipeline (5% central, our assumption) are one chance per status, reviewed for version 1.0."
    }
   ],
   "name": "Capacity without a lease",
   "per_share": 2.4601,
   "rule": "Chance of a lease × (data-centre value after its full build cost − the mining site it replaces), never below zero.",
   "status": "note",
   "value_m": 631.7934
  },
  {
   "code": "B5",
   "counted": "665 MW",
   "findings": [
    {
     "level": "note",
     "text": "665 MW at $0.45m per MW, the cost to rebuild from filed build costs (rule B5.4); operating sites sold for about $0.4–0.7m per MW including machines in 2026."
    }
   ],
   "name": "Mining sites",
   "per_share": 1.1652,
   "rule": "Operating mining megawatts × the cost to rebuild one megawatt, without machines; leased megawatts carry no mining value.",
   "status": "note",
   "value_m": 299.25
  },
  {
   "code": "B6",
   "counted": "$351m",
   "findings": [],
   "name": "Mining machines",
   "per_share": 1.3651,
   "rule": "Fleet value from the site's miner net asset value standard, or installed hashrate × $7.05 per terahash per second.",
   "status": "ok",
   "value_m": 350.59
  },
  {
   "code": "B7",
   "counted": "$300m",
   "findings": [
    {
     "level": "note",
     "text": "$30m a year × 10 in the central scenario for every company; the company's own overhead and share-based pay are used from version 1.0."
    }
   ],
   "name": "Company overhead",
   "per_share": -1.1681,
   "rule": "A landlord's yearly overhead × 10, the same for every company.",
   "status": "note",
   "value_m": -300.0
  },
  {
   "code": "B8",
   "counted": "—",
   "findings": [
    {
     "level": "ok",
     "text": "Nothing to count."
    }
   ],
   "name": "Construction money and other assets",
   "per_share": 0.0,
   "rule": "Construction money already raised and set aside is deducted; money owed by related parties counts only in the optimistic scenario.",
   "status": "ok",
   "value_m": 0.0
  },
  {
   "code": "B9",
   "counted": "balance sheet of 30 June 2026",
   "findings": [
    {
     "level": "open",
     "text": "Balance sheet of 30 June 2026, more than 120 days old; the next report replaces it."
    },
    {
     "level": "open",
     "text": "Bitcoin count of 30 September 2026, more than 45 days old."
    },
    {
     "level": "note",
     "text": "Values are before tax, as for a real-estate investment trust; a tax deduction comes with version 1.0."
    }
   ],
   "name": "Debt, cash and bitcoin",
   "per_share": -3.1536,
   "rule": "Debt at face value, outside shareholders and customer prepayments are subtracted; cash and bitcoin at market are added.",
   "status": "open",
   "value_m": -809.9023
  },
  {
   "code": "B10",
   "counted": "256.8 million",
   "findings": [
    {
     "level": "ok",
     "text": "256.8 million shares."
    }
   ],
   "name": "Shares",
   "per_share": null,
   "rule": "Shares outstanding plus warrants that cost almost nothing to exercise.",
   "status": "ok",
   "value_m": null
  }
 ],
 "bridge": {
  "base": {
   "equity": 1572.4536,
   "equity_full": 2512.4785,
   "items": [
    {
     "key": "contracts",
     "label": "Signed leases",
     "per_share": 5.4542,
     "value": 1400.7225
    },
    {
     "key": "gpu",
     "label": "GPU cloud contracts",
     "per_share": 0.0,
     "value": 0
    },
    {
     "key": "conversion",
     "label": "Chance of new leases on capacity without a lease",
     "per_share": 2.4601,
     "value": 631.7934
    },
    {
     "key": "mining_infra",
     "label": "Mining sites at the cost to rebuild them",
     "per_share": 1.1652,
     "value": 299.25
    },
    {
     "key": "asic",
     "label": "Mining machines at market value",
     "per_share": 1.3651,
     "value": 350.59
    },
    {
     "key": "overhead",
     "label": "Company overhead",
     "per_share": -1.1681,
     "value": -300.0
    },
    {
     "key": "funded",
     "label": "Construction money already raised and set aside",
     "per_share": -0.0,
     "value": -0.0
    },
    {
     "key": "other_fin",
     "label": "Money owed by related parties",
     "per_share": 0.0,
     "value": 0.0
    },
    {
     "key": "net_claims",
     "label": "Cash and bitcoin, less debt and other claims",
     "per_share": -3.1536,
     "value": -809.9023
    }
   ],
   "per_share": 6.1229,
   "per_share_full": 9.7831
  },
  "bear": {
   "equity": -277.0855,
   "equity_full": -277.0855,
   "items": [
    {
     "key": "contracts",
     "label": "Signed leases",
     "per_share": 2.0262,
     "value": 520.3743
    },
    {
     "key": "gpu",
     "label": "GPU cloud contracts",
     "per_share": 0.0,
     "value": 0
    },
    {
     "key": "conversion",
     "label": "Chance of new leases on capacity without a lease",
     "per_share": 0.0,
     "value": 0.0
    },
    {
     "key": "mining_infra",
     "label": "Mining sites at the cost to rebuild them",
     "per_share": 0.7768,
     "value": 199.5
    },
    {
     "key": "asic",
     "label": "Mining machines at market value",
     "per_share": 1.0239,
     "value": 262.9425
    },
    {
     "key": "overhead",
     "label": "Company overhead",
     "per_share": -1.7522,
     "value": -450.0
    },
    {
     "key": "funded",
     "label": "Construction money already raised and set aside",
     "per_share": -0.0,
     "value": -0.0
    },
    {
     "key": "other_fin",
     "label": "Money owed by related parties",
     "per_share": 0.0,
     "value": 0.0
    },
    {
     "key": "net_claims",
     "label": "Cash and bitcoin, less debt and other claims",
     "per_share": -3.1536,
     "value": -809.9023
    }
   ],
   "per_share": 0.0,
   "per_share_full": 0.0
  },
  "bull": {
   "equity": 4894.9035,
   "equity_full": 7153.6273,
   "items": [
    {
     "key": "contracts",
     "label": "Signed leases",
     "per_share": 7.1135,
     "value": 1826.8771
    },
    {
     "key": "gpu",
     "label": "GPU cloud contracts",
     "per_share": 0.0,
     "value": 0
    },
    {
     "key": "conversion",
     "label": "Chance of new leases on capacity without a lease",
     "per_share": 11.3631,
     "value": 2918.2451
    },
    {
     "key": "mining_infra",
     "label": "Mining sites at the cost to rebuild them",
     "per_share": 2.3305,
     "value": 598.5
    },
    {
     "key": "asic",
     "label": "Mining machines at market value",
     "per_share": 2.3798,
     "value": 611.1835
    },
    {
     "key": "overhead",
     "label": "Company overhead",
     "per_share": -0.9735,
     "value": -250.0
    },
    {
     "key": "funded",
     "label": "Construction money already raised and set aside",
     "per_share": -0.0,
     "value": -0.0
    },
    {
     "key": "other_fin",
     "label": "Money owed by related parties",
     "per_share": 0.0,
     "value": 0.0
    },
    {
     "key": "net_claims",
     "label": "Cash and bitcoin, less debt and other claims",
     "per_share": -3.1536,
     "value": -809.9023
    }
   ],
   "per_share": 19.0599,
   "per_share_full": 27.855
  }
 },
 "btc_spot": 62987.2656,
 "checks": {
  "engine": {
   "base": 6.1229,
   "bear": 0.0,
   "bull": 19.0599,
   "weighted": 7.4857
  },
  "independent": {
   "base": 6.1229,
   "bear": 0.0,
   "bull": 19.0599,
   "weighted": 7.4857
  },
  "independent_max_abs_diff": 0.0,
  "workbook_mismatches": 0,
  "workbook_values": 840
 },
 "class": "L",
 "class_help": "Has at least one signed data-centre lease: valued in full and compared with the share price.",
 "class_label": "Landlord",
 "conversion": {
  "capex_base": 12911.5,
  "capex_to_mcap": 8.0958,
  "full": {
   "base": 9.7831,
   "bear": 0.0,
   "bull": 27.855
  },
  "grid": [
   {
    "p": 0.0,
    "per_share": 3.6628
   },
   {
    "p": 0.1,
    "per_share": 4.2748
   },
   {
    "p": 0.2,
    "per_share": 4.8868
   },
   {
    "p": 0.3,
    "per_share": 5.4989
   },
   {
    "p": 0.4,
    "per_share": 6.1109
   },
   {
    "p": 0.5,
    "per_share": 6.723
   },
   {
    "p": 0.6,
    "per_share": 7.335
   },
   {
    "p": 0.7,
    "per_share": 7.947
   },
   {
    "p": 0.8,
    "per_share": 8.5591
   },
   {
    "p": 0.9,
    "per_share": 9.1711
   },
   {
    "p": 1.0,
    "per_share": 9.7831
   }
  ],
  "uplift_full": {
   "base": 6.1204,
   "bear": 0.0,
   "bull": 20.1582
  },
  "uplift_prob": {
   "base": 2.4601,
   "bear": 0.0,
   "bull": 11.3631
  },
  "weighted_full": 11.4409
 },
 "data_cut": "2026-11-18",
 "fingerprint": "b40059cbfd5980d94d9590bd49d20b176a680e9f969aca8e51c409f4e8acd084",
 "gpu": [],
 "leases": [
  {
   "basis": "NOI1 = disclosed operating income of the first full year (2029) from the company's rent schedule; NOI margin ~100%",
   "by_scenario": {
    "base": {
     "cap": 0.065,
     "capex": 2082.5,
     "noi1": 254.0,
     "value": 1400.7225,
     "years_to_stab": 2.1164
    },
    "bear": {
     "cap": 0.075,
     "capex": 2290.75,
     "noi1": 254.0,
     "value": 520.3743,
     "years_to_stab": 3.1164
    },
    "bull": {
     "cap": 0.06,
     "capex": 1978.375,
     "noi1": 254.0,
     "value": 1826.8771,
     "years_to_stab": 2.1164
    }
   },
   "credit": "IG",
   "credit_label": "investment grade",
   "delivered": false,
   "esc": 0.03,
   "evidence": "A",
   "evidence_help": "A report filed with the U.S. Securities and Exchange Commission (10-Q, 10-K, 8-K or 6-K).",
   "evidence_label": "Company filing",
   "id": "L-CLSK-1",
   "it_mw": 175,
   "ledger_mw": 250,
   "margin": 1.0,
   "name": "Sandersville GA - Anviran LLC (Meta subsidiary, Meta guarantee), 175 MW IT, 20-yr NNN",
   "noi1_disclosed": 254.0,
   "note": "Operating income of $254m in 2029, the first full year, from the company's rent schedule: rent starts on 30 November 2027, rises 3% a year and totals $6.56bn over the base term; the operating margin is about 100% because the tenant pays the property costs (a triple-net lease). Build cost $11.9m per megawatt of server load, as the company discloses. Rent of 2027–2028, before the lease is fully running, is not counted.",
   "sources": [
    {
     "site": "sec.gov",
     "text": "Investor presentation furnished with the current report on form 8-K of 17 September 2026, pages 3-4: rent schedule, 3.0% yearly increases, about 100% operating margin, about $11.9m per megawatt of server load, Meta guarantee",
     "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526393758/clsk-ex99_1.htm"
    },
    {
     "site": "sec.gov",
     "text": "Press release furnished with the current report on form 8-K of 14 July 2026: 175 MW of server load, 20 years, triple net, $6.6bn",
     "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526302448/clsk-ex99_1.htm"
    }
   ],
   "stab": "2029-01-01",
   "tcv": 6560,
   "title": "Sandersville, Georgia — Anviran, LLC (a Meta subsidiary; Meta guarantees rent and operating expenses), 175 MW, 20 years",
   "years": 20
  }
 ],
 "ledger": {
  "basis": "MW of grid power",
  "gap": 0.0,
  "source": "1.8 GW of contracted power (quarterly report and operating update), the figure used on the site's capacity pages.",
  "sum": 1800.0,
  "tiers": [
   {
    "capex_full_base": 0.0,
    "help": "A signed lease or colocation contract for an AI or high-performance computing data centre.",
    "it_mw_base": 175.0,
    "label": "Signed lease",
    "mining_mw": 0.0,
    "mining_value_base": 0.0,
    "mw": 250.0,
    "tier": "T1",
    "value_full_base": 1400.7225,
    "value_prob_base": 1400.7225
   },
   {
    "capex_full_base": 7372.05,
    "help": "A tenant has signed a letter of intent, an exclusivity, a reservation right or a right of first offer, but no lease yet.",
    "it_mw_base": 619.5,
    "label": "Letter of intent or exclusivity",
    "mining_mw": 0.0,
    "mining_value_base": 0.0,
    "mw": 885.0,
    "tier": "T2",
    "value_full_base": 1068.3196,
    "value_prob_base": 480.7438
   },
   {
    "capex_full_base": 5539.45,
    "help": "Power is connected or contracted, but there is no tenant.",
    "it_mw_base": 465.5,
    "label": "Powered, no tenant",
    "mining_mw": 665.0,
    "mining_value_base": 299.25,
    "mw": 665.0,
    "tier": "T3",
    "value_full_base": 802.7486,
    "value_prob_base": 450.2996
   }
  ],
  "total": 1800
 },
 "lens_only": false,
 "mcap": 1594.834,
 "mining": {
  "asic": {
   "base": 350.59,
   "bear": 262.9425,
   "bull": 611.1835
  },
  "asic_base": 350.59,
  "asic_basis": "Fleet value from the site's miner net asset value standard (version 1.2).",
  "infra": {
   "base": 299.25,
   "bear": 199.5,
   "bull": 598.5
  },
  "infra_mw": 665,
  "rc_per_mw": {
   "base": 0.45,
   "bear": 0.3,
   "bull": 0.9
  }
 },
 "name": "CleanSpark, Inc.",
 "notes": [
  "The balance sheet is dated 30 June 2026, more than 120 days before the valuation date; a newer report is expected.",
  "The bitcoin count is from 30 September 2026, more than 45 days before the valuation date (the limit of the site's equity valuation standard); a newer count is expected with the next report.",
  "Rent before the Sandersville lease is fully running is not counted: the company's schedule has $5m in 2027 and $220m in 2028 (about $0.78 a share in the central scenario, discounted at the contract rate); the rule is reviewed for version 1.0.",
  "Part of the Sandersville build was paid before 30 June 2026 (construction in progress at all sites was $81.8m at that date, of which the Sandersville share is not disclosed); the full build cost is deducted while that cash is already gone from the balance sheet, so the value may be up to about $0.30 a share too low until the annual report shows what is left to spend.",
  "Cash includes the net proceeds of the $2,276m Sandersville notes issued at 98.5% on 25 September 2026 ($2,219m after fees, our estimate); part of them reimburses earlier spending and part funds a debt-service reserve.",
  "Other mining sites (Georgia, Tennessee, Wyoming, Mississippi): 665.0 MW is our estimate (the company's total less the sites it lists), not a figure the company gives."
 ],
 "price": 6.21,
 "price_date": "2026-11-18",
 "sensitivity": [
  {
   "key": "contracted_only",
   "label": "No new leases on capacity without a lease",
   "per_share": 3.6628
  },
  {
   "key": "cap_minus_50bp",
   "label": "Cap rates 0.5 percentage points lower",
   "per_share": 8.5898
  },
  {
   "key": "cap_plus_50bp",
   "label": "Cap rates 0.5 percentage points higher",
   "per_share": 3.9951
  },
  {
   "key": "pipeline_p_double",
   "label": "Chances of new leases doubled",
   "per_share": 8.5829
  },
  {
   "key": "capex_default_plus_10pct",
   "label": "Build cost 10% higher",
   "per_share": 3.8499
  },
  {
   "key": "mining_rc_0_5",
   "label": "Mining sites at $0.5m per MW (level of 2026 site sales)",
   "per_share": 6.2135
  },
  {
   "key": "mining_rc_0",
   "label": "Mining sites not counted",
   "per_share": 5.3072
  }
 ],
 "shares_m": 256.8171,
 "slug": "clsk",
 "sources": [
  {
   "site": "sec.gov",
   "text": "Investor presentation furnished with the current report on form 8-K of 17 September 2026, pages 3-4: rent schedule, 3.0% yearly increases, about 100% operating margin, about $11.9m per megawatt of server load, Meta guarantee",
   "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526393758/clsk-ex99_1.htm"
  },
  {
   "site": "sec.gov",
   "text": "Press release furnished with the current report on form 8-K of 14 July 2026: 175 MW of server load, 20 years, triple net, $6.6bn",
   "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526302448/clsk-ex99_1.htm"
  },
  {
   "site": "sec.gov",
   "text": "Current report on form 8-K of 14 July 2026, item 8.01: letter of intent and exclusivity over 718 acres with up to 885 MW",
   "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526302448/clsk-20260710.htm"
  },
  {
   "site": null,
   "text": "Our estimate from the capacity breakdown",
   "url": null
  }
 ],
 "summary": {
  "base": 6.1229,
  "bear": 0.0,
  "bull": 19.0599,
  "contracted_only": 3.6628,
  "implied_cap": 0.0646,
  "implied_p": 0.4162,
  "position": "within the range",
  "weighted": 7.4857,
  "weighted_to_price": 0.2054
 },
 "ticker": "CLSK",
 "unsigned": [
  {
   "basis": "G",
   "by_scenario": {
    "base": {
     "capex_full": 7372.05,
     "conversion_value": 1068.3196,
     "converts_when_full": true,
     "it_mw": 619.5,
     "mining_value": 0.0,
     "npv_per_it_mw": 1.7245,
     "p": 0.45,
     "uplift_full": 1068.3196,
     "uplift_prob": 480.7438
    },
    "bear": {
     "capex_full": 0.0,
     "conversion_value": 0.0,
     "converts_when_full": false,
     "it_mw": 531.0,
     "mining_value": 0.0,
     "npv_per_it_mw": -1.1113,
     "p": 0.05,
     "uplift_full": 0.0,
     "uplift_prob": 0.0
    },
    "bull": {
     "capex_full": 7503.6937,
     "conversion_value": 3297.6065,
     "converts_when_full": true,
     "it_mw": 663.75,
     "mining_value": 0.0,
     "npv_per_it_mw": 4.9681,
     "p": 0.6,
     "uplift_full": 3297.6065,
     "uplift_prob": 1978.5639
    }
   },
   "convertible": true,
   "derived": false,
   "id": "P-CLSK-1",
   "ledger_mw": 885,
   "mining_basis": "no built mining infrastructure in this row",
   "mining_mw": 0,
   "mining_note": "",
   "mw": 885,
   "name": "Texas (Sealy, Brazoria) - LOI/exclusivity of the Sandersville tenant",
   "note": "Letter of intent and exclusivity signed by the Sandersville tenant on 10 July 2026 over 718 acres with up to 885 MW (current report on form 8-K of 14 July 2026).",
   "share": 1.0,
   "sources": [
    {
     "site": "sec.gov",
     "text": "Current report on form 8-K of 14 July 2026, item 8.01: letter of intent and exclusivity over 718 acres with up to 885 MW",
     "url": "https://www.sec.gov/Archives/edgar/data/827876/000119312526302448/clsk-20260710.htm"
    }
   ],
   "status": "Letter of intent or exclusivity",
   "status_help": "A tenant has signed a letter of intent, an exclusivity, a reservation right or a right of first offer, but no lease yet.",
   "tier": "T2",
   "title": "Texas sites (Austin and Brazoria counties) — exclusivity given to the Sandersville tenant"
  },
  {
   "basis": "G",
   "by_scenario": {
    "base": {
     "capex_full": 5539.45,
     "conversion_value": 802.7486,
     "converts_when_full": true,
     "it_mw": 465.5,
     "mining_value": 299.25,
     "npv_per_it_mw": 1.7245,
     "p": 0.3,
     "uplift_full": 503.4986,
     "uplift_prob": 151.0496
    },
    "bear": {
     "capex_full": 0.0,
     "conversion_value": 0.0,
     "converts_when_full": false,
     "it_mw": 399.0,
     "mining_value": 199.5,
     "npv_per_it_mw": -1.1113,
     "p": 0.1,
     "uplift_full": 0.0,
     "uplift_prob": 0.0
    },
    "bull": {
     "capex_full": 5638.3687,
     "conversion_value": 2477.8625,
     "converts_when_full": true,
     "it_mw": 498.75,
     "mining_value": 598.5,
     "npv_per_it_mw": 4.9681,
     "p": 0.5,
     "uplift_full": 1879.3625,
     "uplift_prob": 939.6813
    }
   },
   "convertible": true,
   "derived": true,
   "id": "P-CLSK-2",
   "ledger_mw": 665,
   "mining_basis": "energized mining sites GA/TN/WY/MS; utilized 808 MW (Sept 2026) incl. Sandersville before conversion; nameplate 1,027 MW at 30.09.2025 (10-K)",
   "mining_mw": 665,
   "mining_note": "Operating mining sites; CleanSpark used 808 MW in September 2026, including Sandersville before its conversion.",
   "mw": 665,
   "name": "Other energized mining sites (GA, TN, WY, MS) = 1,800 - 250 - 885",
   "note": "Our estimate: 1,800 MW in total less Sandersville and Texas.",
   "share": 1.0,
   "sources": [
    {
     "site": null,
     "text": "Our estimate from the capacity breakdown",
     "url": null
    }
   ],
   "status": "Powered, no tenant",
   "status_help": "Power is connected or contracted, but there is no tenant.",
   "tier": "T3",
   "title": "Other mining sites (Georgia, Tennessee, Wyoming, Mississippi)"
  }
 ],
 "valuation_date": "2026-11-20",
 "version": "0.9.6"
}