# CLSK Fair Value Model — audit of v3.1 and release of v4.0 (2026-10-16)

English edition of the audit note (the site and its standards are published in English only). The model was withdrawn on 20 Nov 2026 and replaced by the site's valuation of miners and AI data-centre landlords; this note is kept as part of the archive.

Data cut 13 Oct 2026 (CLSK $10.31, close of 12 Oct; BTC $83,661; hashprice $39.80 per PH per day, IonGrid; holdings 13,530 BTC at 30 Sep; balance sheet 30 Jun 2026; Sandersville notes of 25 Sep 2026).

## Verdict on v3.1
- The arithmetic is right: LibreOffice recalculation of 4,459 cells — 0 differences / 0 errors; an independent Python recalculation of 23 figures — 0 differences.
- The conclusion "reduce, weighted fair value $4.91" was driven entirely by a notional 25% tax with no NOL, bonus depreciation or interest deduction (without tax v3.1 gave $9.20). Per the FY2025 10-K the federal NOL is $471.6m (indefinite $465.0m): the assumption contradicts the disclosure.
- Corporate costs with a present value of $250m were half the reported run-rate ($125–146m a year).
- Discounting was inconsistent: mining from 31 Dec 2026 (end of year), HPC from the valuation date (end of year).
- Texas was scaled from the Sandersville NPV per MW net of Sandersville-specific capex → each $1 of Sandersville input gave $2.3 in the SOTP.
- The 2028 halving was applied to the whole year; credit for funded capex was 0 with construction in progress of $81.8m and an 8-K condition on reimbursement of equity contributions.
- Mining Base implied hashprice growth from $39.8 to $57.8 by 2032 (BTC growth 20% a year, decline 8%, halving shock 20%) while the forward curve was in backwardation; Bear = mining shut down (fair value 0); 59% of the weighted fair value came from Bull.

## What was done in v4.0
- Adjustments sheet: consolidated cash tax under three regimes (1 — notional 25%; 2 — statutory + NOL + 60% bonus depreciation on HPC capex + §163(j); 3 — no tax), the present value of the saving against regime 1 discounted at the segment rates in proportion to each segment's share of the tax; a tie-check with the segment DCFs.
- One mid-year convention from the valuation date (Assumptions!D110) in every DCF and in the hashprice sensitivity; the halving pro rata by date (D111).
- Corporate costs: an explicit forecast for 2027–2032 ($95m, −5% a year in Base) + an annuity of $30m a year to 2047 at the HPC rate → present value $466m.
- Texas: NPV per MW on a full-capex basis (HPC Project!34). Capex credit D83 = construction in progress $81.8m. Stub period 13 Oct – 31 Dec 2026 (+$12.4m). Treasury-stock dilution of 3.5m options and warrants × 50% → 258.6m shares for the valuation (D119).
- Public Summary (English, the only published output), Version Log (validation statuses, SHA-256 of the inputs, release checklist), 13 new Checks (39–51), Sources S24–S28; the signal was replaced by the position of the price against fair value; the Options Strategy sheet was marked PRIVATE and is removed by the release script.

## Results of v4.0 ($ per share; price $10.31)
| | Bear | Base | Bull | Weighted 20/60/20 |
|---|---:|---:|---:|---:|
| Regime 1 (notional 25%) | 0.00 | 2.83 | 15.64 | 4.83 |
| **Regime 2 (published)** | **0.00** | **3.88** | **16.96** | **5.72** |
| Regime 3 (no tax) | 0.00 | 5.51 | 20.35 | 7.37 |

v3.1 → v4.0 Base: $3.00 → $3.88 (tax adjustment +1.05, timing and halving +0.29, Sandersville credit +0.35 including timing, Texas +0.08, corporate costs −0.84, stub +0.05, treasury-stock dilution −0.02).
Cross-checks: economic EV mNAV 3.91x (at fair value, Base, 2.16x); tangible NAV $3.34 per share (P/NAV 3.09x); the hashprice that would justify $10.31 is $84.3 per PH per day (2.1× spot); market-implied Texas probability 199%.

## Sensitivities (engine, --override)
Market-consistent Base (growth 12%, decline 10%, shock 30%): Base $1.30 / weighted $4.17. Texas 25%: $3.05 / $5.22. HPC rate 7% / 9%: Base $5.59 / $2.39. BTC $70k / $100k: weighted $3.75 / $7.97. Weights 20/70/10: weighted $4.41. No reasonable single variation brings the weighted fair value to the price.

## Proposals to the author (not applied)
1) recalibrate mining Base/Bear to the forward curve; 2) Texas 25–35% or staged with its financing; 3) HPC rate: 7% after commissioning / 10–12% during construction instead of 8% × 95%; 4) publish Base + range, the weighted value with the contribution of Bull stated; weights 25/50/25 after recalibration; 5) sources and uses for 2026–2028 against the put of the 2030 notes (15 Jun 2028); 6) peer EV per MW and ASIC prices for sustaining capex from the existing bases; 7) D108 = 1 if refinancing of the balloon is accepted.

## Data open until the FY2026 10-K
Cash bridge for Q4 FY2026; reimbursement of equity contributions from the proceeds (D83); NOL at 30 Sep 2026 and the bonus-eligible share (D104/D106); whether 25.9m restricted share awards are included in 256.8m (D118); exercise prices of options and warrants; status of Texas; impairment of the Sandersville mining assets.

## Release package
CLSK_Valuation_Model_v4.0_2026-10-13.xlsx (full), …_public.xlsx, clsk_valuation_engine.py, validate_clsk_model.py, make_public_release.py, build_v40.py, validation_log_v4.0.md, inputs_v4.0.json (SHA-256 d64ba444a81ecf4eebdc26303ac0228ba1a11933c5df7fddeb5eff1702107a72). Validation: 51 figures, 0 differences; LibreOffice 0 errors; Checks 0 ERROR / 6 WARN; Version Log = READY.

Documents: "HASHFLOPS Equity Valuation & Publication Standard v1.0" and "Audit of the CLSK v3.1 model and release of v4.0" (16 Oct 2026).
