# HASHFLOPS Mining Capacity Standard v1.0 — condensed edition (release 2026-10-17, cut 2026-10-15)

English edition of the project note (the site and its standards are published in English only). The third standard of the series (after the Mining NAV Standard v1.1 and the Mining Cost Standard v1.0), under the same publication protocol (Equity Valuation & Publication Standard v1.0). The only published output is the Public Summary (English). Internal history: the workbook Miners_Analytics_AllCompanies v1–v11 (May–September 2026) and the note "Asset structure of the comparable sample" (May 2026); this standard replaces them.

## What is calculated
- **Enterprise value (EV)** = Market value (closing price × basic shares, pro forma for disclosed post-balance-sheet issues and exchanges) + Debt at face value (pro forma for disclosed issues and repayments) + minority interests (NCI) at book − **Cash, including restricted cash**.
- **Infrastructure value ("iron")** = EV − bitcoin on the balance sheet × spot (including pledged and lent coins).
- **Three denominators**: D1 Energized (grid capacity in service, as the company defines it); D2 Committed (D1 + construction and contracts energising within 24 months, to 2028-10-15); D3 Portfolio (the company's whole prospective portfolio). The invariant D1 ≤ D2 ≤ D3 is an ERROR check.
- **Nine multiples** {Market value, EV, Iron} × {D1, D2, D3}, $ million per MW. Headline: Iron / Committed MW.
- **Cohorts**: A — BTC-mining weighted (MARA, HIVE, CLSK, BTDR, RIOT), B — HPC/AI pivot (IREN, HUT, CORZ, CIFR, WULF). Medians for all and for each cohort.

## Key method decisions of v1.0
1. **Restricted cash is deducted.** In Q2 2026 the sample raised about $14bn of project debt held in escrow (HUT $6.8bn, CIFR $3.7bn, IREN $1.7bn, CORZ $0.8bn, WULF $0.4bn). That is financing, not infrastructure; without the deduction HUT would show an EV of ~$17.6bn instead of $10.4bn.
2. **Debt at face value** (as in the NAV Standard), not at carrying amount: the 0% convertibles of CIFR/CLSK/MARA would otherwise understate debt by hundreds of millions.
3. **One cut with the NAV and Cost standards**: closes of 15 Oct, BTC $82,308.83, balance sheets of 30 Jun from the shared set `mining_nav_v1.1_inputs_2026-10-15.json`.
4. **MW basis codes**: G — gross as disclosed; U — utilised (CLSK: the company discloses only 808 MW utilised and 1.8 GW under contract); IT→G — critical IT converted at 1.30 (CORZ: discloses IT MW only). The conversion is an Assumption, blue on yellow, WARN.
5. **NCI at book** (HUT/ABTC $311m — WARN: the market value of the stake in listed ABTC is not used; the consolidated 17,316 BTC are deducted consistently).

## Results (cut 2026-10-15)
| | Market value $bn | EV $bn | BTC $bn | Iron $bn | D1 MW | D2 MW | D3 MW | Iron/D2 $m per MW |
|---|---:|---:|---:|---:|---:|---:|---:|---:|
| Σ 10 companies | 51.4 | 65.9 | 6.6 | 59.3 | 10,787 | 16,886 | 35,429 | median **3.50** |
| Cohort A | | | | | | | | **1.58** (1.00–2.74) |
| Cohort B | | | | | | | | **4.48** (4.26–9.16) |

The lowest iron value per committed MW: MARA ($1.00m — 55% of EV is bitcoin), HIVE ($1.05m), CLSK ($1.58m, already with $2.3bn of Sandersville in debt and restricted cash). The highest: WULF ($9.16m), CIFR ($6.44m). The gap from Energized to Committed (WULF 18.0 → 9.2, HUT 14.7 → 5.1) is the price of funded construction for investment-grade tenants; the gap from Committed to Portfolio (HUT 9.4 GW → $0.96m, CIFR 5.3 GW → $1.10m, MARA 4.8 GW → $0.50m) is optionality without a tenant.

Change against the cut of 27 Sep (v11): miner shares fell 25–40% (MARA 4.78 → 3.22, RIOT 8.70 → 5.82, CLSK 3.58 → 2.29, HUT 10.90 → 9.38), BTC 84.0k → 82.3k; the median iron per portfolio MW (24 months) went from $5.28m to $3.50m — partly price, partly method (debt at face, restricted cash, NCI, D1 restated to a gross basis for IREN 1,000 → 2,310 and WULF 102 → 500).

## Release validation
LibreOffice recalculation: 778 formulas, 0 errors · engine `capacity_engine.py`: 247/247 matches (tolerance 0.005) · Checks: 86 PASS / 15 WARN / 0 ERROR · verdict READY · fingerprint `d1f6b9c5a26eb00afc4261885e3decd017a09900e951e09fa3a2d15ca2d42d45`.
WARN (in the release note): basis of CLSK (U) and CORZ (IT→G, confidence C); pro forma events of BTDR/MARA/CLSK/RIOT/CIFR/HIVE; restricted cash to debt above 50% at HUT (88%) and CIFR (56%); NCI at book for HUT/MARA/CIFR; HIVE share count from an aggregator (10-Q cover not captured).

## Update triggers
10-Q/10-K/6-K (10 business days; Q3 2026 10-Qs expected 4–14 November) · disclosure of capacity or financing ≥ 10% of EV (5 days) · BTC ±20% or share price ±20% (5 days) · error (immediately, errata) · quarterly review. Minor = data, major = rules or structure (the engine is updated).

## Open items for v1.1
- Capture the HIVE cover share count from the 10-Q and replace the aggregator.
- CORZ: obtain gross utility capacity by site (10-K FY2025 Item 2) and drop the 1.30 conversion.
- HUT NCI at the market value of ABTC (needs the ABTC price at the cut).
- Add a column "contracted rent, $bn" (HUT 26.6, CIFR 16.6, WULF ~19+, CORZ 24, RIOT 9.1, CLSK 6.6, BTDR 4.7, IREN 9.7 + 3.4) for an EV / contracted revenue multiple, the answer to the main caveat (HPC MW ≠ mining MW).
- Charts for the page and a document version of the Standard sheet.

Files: `Mining_Capacity_Standard_v1.0_2026-10-15.xlsx`, `Mining_Capacity_v1.0_reproducibility_package.zip`, `mining-capacity-standard-v1.0-2026-10-15-public-summary-EN.md`, `mining-capacity-v1.0-validation-log-2026-10-17.md`, `data/inputs/mining_capacity_v1.0_inputs_2026-10-15.json`, `scripts/capacity_common.py`, `scripts/capacity_engine.py`, `scripts/validate_capacity.py`, `scripts/build_capacity_workbook.py`.