# Mining Cost Standard v1.0 — update to the 2026Q3 cut (reports for the third quarter of 2026)

Date: 2026-11-15 · Prepared by: Capitalizer research · Status: READY (validation 2026-11-15 13:10 UTC) · Inputs fingerprint SHA-256: `1fcfd65b9fa8847040848b09f5d638765993aec1544be967305ee6d043098c6b` · The rules of the standard did not change (standard number 1.0; only the data cut changes).

English edition of the release note (the site and its standards are published in English only).

Basis: the owner's decision of 15 Nov 2026 15:41 — cost, NAV and megawatts are re-based in full on the quarterly calendar, but new inputs from SEC reports are entered promptly; the miners' Q3 reports (2–12 Nov) are entered now, without waiting for 30 Nov. Source of the list of reports: the SEC feed of the hashflops-site repository (`src/data/filings/filings_log.csv`) plus an EDGAR check by CIK for companies outside the watcher (KEEL, CANG, FUFU).

## 1. What was done

- Quarter Q3_2026 (three months to 30 Sep 2026) added for 12 of 15 companies: 10-Q — RIOT, MARA, IREN (FQ1 FY27), CIFR, CORZ, WULF, HUT, HIVE (FQ2 FY27), KEEL, ABTC, BTBT; 6-K — BTDR (results release of 10 Nov). Not filed at the cut date and marked PENDING, with no estimates and no carry-forward of earlier values: CLSK (10-K FY2026, expected around 24 Nov), CANG and FUFU (quarterly 6-K).
- Base of the inputs: the published file `mining_cost_v1.0_inputs_2026Q2.json` (fingerprint 7922aeb6… matched the repository); earlier quarters and their confidence flags were not changed; only Q3 2026 was extracted and checked. The workbook now holds 5 quarters (Q3 2025 – Q3 2026); TTM = the latest four (Q4 2025 – Q3 2026).
- The liquidity layer is now built from the same Q3 reports (balance sheet, debt and crypto-asset notes) instead of the NAV set; BTC for valuing holdings is the close of 13 Nov 2026, $68,249.27, the same value as in the daily roll of the value-per-MW base (`capacity_daily.json`): the site's two mining bases use one spot price.
- The pipeline is synchronised with the repository: the script versions in `src/library_files` (path fix of 15 Nov) were taken as the base and extended with: parameters by the latest quarter (cut, TTM window, headers, Ranking/Checks/Public Summary), incremental normalisation (base_inputs + new quarters), PENDING rows, the liquidity layer from extracted data, the page and chart generator. Site: the page parser and the Cost section templates read the quarter, the TTM window and the balance-sheet date from the page itself, so the next cut needs no code changes.

## 2. Results for Q3 2026 (headline = Tier 1, ≥ 500 BTC)

| # | Ticker | Scope | L0-E | L0 NET | **L1** | L1 band 0–100% | L2 | L3 | Price | L1 margin | L1 TTM | BTC | L1 Q2 2026 |
|---|---|---|---:|---:|---:|---|---:|---:|---:|---:|---:|---:|---:|
| 1 | BTDR | E+S | 36,083 | 41,323 | **49,604** | 41,323 – 50,898 | 57,292 | 85,522 | 71,958 | +31.1% | 57,042 | 3,855 | 51,337 |
| 2 | HIVE | E+S | 42,617 | 47,060 | **56,016** | 47,060 – 57,058 | 57,309 | 103,240 | 71,064 | +21.2% | 63,919 | 1,070 | 58,980 |
| 3 | RIOT | E+S | 45,723 | 39,265 | **57,461** | 39,265 – 67,726 | 58,534 | 98,075 | 70,855 | +18.9% | 69,109 | 1,637 | 69,004 |
| 4 | MARA | E+S+H | 39,674 | 63,652 | **83,763** | 63,652 – 84,430 | 89,644 | 155,501 | 71,699 | −16.8% | 88,514 | 2,217 | 78,640 |

Cohort (weighted by production, 8,779 BTC): L1 $60,477 against a realised price of $71,578 → cash margin +15.5% (of revenue); median $56,739. Like for like for the same four companies in the second quarter: L1 $64,481 at a price of $71,621, so cost −6.2% quarter on quarter with the price −0.1%. The published Q2 headline ($64,536 for six companies) is not directly comparable: CLSK has not reported yet and IREN (402 BTC) fell below the threshold.

What moved the figures: RIOT — curtailment credits doubled ($24.7m) and SG&A fell → L1 −$11.5k; BTDR — volume 3,855 BTC (+43%) with total energy cost of $139m; MARA — the share of hosting and O&M, production 2,217 BTC (−7%), L1 above the price for the second quarter running; HIVE — electricity $45.6m for 1,070 BTC, first fleet impairment ($31.2m, excluded from the layers).

Annex (below the threshold / hosting / not separable): ABTC (T2) L1 $44,779 (891 BTC; Hut 8 tariff); WULF $77,976 (186 BTC); IREN $78,686 (402 BTC; 12% of revenue, fleet retired by 31 Dec 2026); CORZ $80,675 (174 BTC; fleet held for sale); BTBT (T2) $102,873 (28 BTC); CIFR $135,614 (297 BTC; two segments from Q3, SG&A allocated by a 78% share); KEEL, HUT (T3) — production and price only; CANG, FUFU, CLSK — PENDING.

TTM (Q4 2025 – Q3 2026, L1 weighted): ABTC (T2) 46,942 · BTDR 57,042 · IREN 61,127 · HIVE 63,919 · RIOT 69,109 · MARA 88,514 · CIFR 94,040 · WULF 127,288; CLSK, CORZ, CANG, BTBT — none (fewer than four complete quarters).

## 3. Changes in the Q3 disclosures handled in the overlay (each entry cites the report)

- MARA: denominator 2,247 − 30 BTC ADGM = 2,217; energy layer on 1,213 BTC from own sites; one-off acquisition/integration costs of 1,944k in G&A; Project Align restructuring 18,979k as a separate P&L line (not SG&A); no accelerated depreciation in Q3; O&M is now net of realised gains on commodity swaps (amount not disclosed — energy-layer flag).
- BTDR: cost = self-mining 121.0m + co-mining 38.3m = 159.3m against 3,855 BTC including co-mining; the hashrate definition changed ("Total Proprietary" without co-mining; the series keeps self-mining at 82.3 EH/s); debt in the release at carrying amount only (principal not disclosed — carrying amount in the liquidity layer, flagged).
- RIOT: DER depreciation of miners 64,728k (reconciled as (78,805 − 39,265) × 1,637); curtailment credits 24,664k; line label "Ground and facility rent, water, and property tax".
- WULF: gross energy = 9,790k net + 3,200k demand response (reconciled with "gross power costs $13.0m"); D&A per the MD&A footnote $50,790 × 186; accelerated depreciation 7.7m (miner building, miners and electrical equipment — share not disclosed, kept inside DER as in Q2).
- CIFR: two segments from Q3 (Bitcoin Mining / HPC Leasing), segment D&A 16,415k → method SEG; ~0.9m of H1 costs reclassified to HPC (earlier quarters not restated); KPIs (11.6 EH/s, 17.2 J/TH, 2.8 ¢/kWh) only from the 8-K EX-99.2 presentation, low confidence.
- CORZ: segment D&A 7,173k (miner fleet held for sale, mostly infrastructure is depreciated); advisor fees moved out of SG&A to a separate line; BTC = 9M ≈869 − 6M ≈695 = 174.
- IREN: reporting in $ million (rounding ±$0.5m — material at 402 BTC); the net electricity / demand response table disappeared; BTC share of revenue 12%; a new R&D line outside SG&A.
- HIVE: SBC as a separate line (sbc_in_sga = 0); fleet impairment of 31.2m excluded; hashrate and MW at 31 Oct 2026.
- ABTC: SEG D&A 28,579k; G&A fell to 2,758k (9M reconciles); BTC sales started (465) to fund opex. KEEL: no accelerated depreciation, BTC treasury sold in full, 26% of revenue is energy sales. HUT: BTC = ABTC.

## 4. Verification protocol

1. Arithmetic of the inputs (sums of components, segments, 9M − 6M; 6M from the published Q2 inputs) → Checks.
2. LibreOffice headless recalculation: 5,378 formulas, 0 errors.
3. Independent engine `mining_cost_engine.py`: 1,932 derived values, 0 differences (stacks of five quarters, TTM on the latest four, Q3 cohort statistics). Checks: 139 PASS / 2 WARN / 0 ERROR.
4. Blind second extraction of Q3 2026 (first-pass values hidden from the checker): 133 text and derived inputs for 12 companies — 132 matched (4 of them on an alternative definition, flagged), 1 difference on the informational field "other one-offs" (BTDR, detail only; not in the layers), 0 not found; no first-pass correction was needed. Data sheet flags: XBRL 415 / TEXT-2x 327 / TEXT-1x 370 (earlier quarters carry the flags of the 2026Q2 release).
5. Reconciliation with the issuers' own metrics: RIOT cost to mine ex/incl D&A — 0/0; WULF cost to mine — 0; MARA energy per BTC — 0. Only historical WARNs remain (MARA Q1 2026 recognition price; CORZ Q3 2025 scope).
6. `validate_cost_model.py` stamps the Version_Log; verdict READY. The inputs fingerprint is in the log and the Public Summary.

Reproduction by a third party from the published files: `python3 -I build_std.py` → `soffice --headless --convert-to xlsx --outdir recalc Mining_Cost_Standard_v1.0_2026Q3.xlsx` → `python3 -I mining_cost_engine.py --xlsx recalc/Mining_Cost_Standard_v1.0_2026Q3.xlsx` (expected: 0 mismatches, weighted L1 $60,477). The check is part of `tools/reproduce_standards.py` in the repository (expectations are read from standards.json).

## 5. Repository synchronisation

- Repository hashflops-site, branch `mining-cost-q3-2026`, pull request into main (no deployment; published on the owner's approval): `src/content/standards/mining-cost.md` (page), `standards.json` (2026Q3 kicker, stats, files, reproduction steps), `releases.json` (mining-cost record: cut 30 Sep 2026, calculation and check dates 15 Nov, plan — interim additions of CLSK/CANG/FUFU and the re-base of 28 Feb 2027; `site_publication_date` set at merge), `library.json` (new 2026Q3 group; the 2026Q2 group kept as the previous release with its documents), `src/library_files/*` (2026Q3 inputs, log, scripts, release note), `src/analytics.py` + templates (quarter, TTM and balance-sheet date read from the page), `tools/reproduce_standards.py` (expectations from standards.json), `impact_log.csv` (PLANNED rows for the Q3 reports closed as applied).
- Note on the watcher: the MINERS list of `tools/filings_watch.py` still had the ticker BITF (now KEEL) and lacked CANG and FUFU, so their reports did not reach the feed and the impact assessment; KEEL, CANG and FUFU (CIK 1812477, 1725123, 1921158) are proposed for addition.
- The working copies of this note, the English 2026Q3 page, the validation log, the inputs and the updated scripts are kept with the project files (the same versions as in the repository).

## 6. Limitations and next steps

- Four headline companies instead of six is a consequence of the cut, not of the method; until the CLSK 10-K (around 24 Nov) and the CANG/FUFU 6-Ks are filed the cohort is incomplete; interim addition within one business day of filing, full re-base on 28 Feb 2027.
- IREN and CIFR: BTC shares of revenue of 12% and 78% make SG&A allocation and revenue-based depreciation less and less meaningful for the mining part; candidates for a tier review (HPC-dominant) in v1.1.
- The blind second pass covers only the text inputs of Q3 2026; earlier quarters carry the flags of the previous release.
- The SEC feed watcher does not cover KEEL/CANG/FUFU (see above).

## 7. Artefacts

- Delivered: `Mining_Cost_Standard_v1.0_2026Q3.xlsx`, `Mining_Cost_Standard_v1.0_2026Q3_Public_Summary_EN.md`, `cost_stack_Q3_2026.png` (+svg), `l1_ttm_2026Q3.png`, `Mining_Cost_v1.0_2026Q3_repro.zip` (Q3 specification, scripts, extract_q3/, verify/, base_inputs + normalized.json, log, charts).
- Repository: branch `mining-cost-q3-2026` → pull request. See section 5.

## Sources

- SEC EDGAR — 10-Q for the quarter to 30 Sep 2026 (RIOT 0001104659-26-122417; MARA 0001507605-26-000028; IREN 0001878848-26-000066; CIFR 0001819989-26-000050; CORZ 0001839341-26-000030; WULF 0001628280-26-071671; HUT 0001193125-26-446146; HIVE 0001062993-26-005842; KEEL 0001812477-26-000040; ABTC 0001193125-26-447413; BTBT 0001213900-26-118350), 6-K BTDR 0001213900-26-117797 (EX-99.1) and 0001213900-26-110703; 8-K EX-99.1/99.2 for operating KPIs only. The full list with URLs is in the "Filings used" table of the Public Summary and on the Sources sheet of the workbook.
- SEC feed of the hashflops-site repository (`src/data/filings/filings_log.csv`, `impact_log.csv`) — which reports were filed and their status in the impact assessment.
- BTC-USD close of 13 Nov 2026 — `src/data/mining/capacity_daily.json` in the repository (Yahoo research feed), for the liquidity layer only.