# Mining Cost Standard — validation log (2026-11-25 09:00 UTC, interim update CLSK + FUFU)

Workbook: `Mining_Cost_Standard_v1.0_2026Q3.xlsx` (rebuilt from `mining_cost_v1.0_inputs_2026Q3_2026-11-25.json`)
Inputs fingerprint (SHA-256 normalized.json): `94c41c6105466ad7b3a006b7da6a38704c5a8721471c454f3b11b70a9b2cb0aa`
Base: `mining_cost_v1.0_inputs_2026Q3.json` (SHA-256 `1fcfd65b9fa8847040848b09f5d638765993aec1544be967305ee6d043098c6b`, release of 15 Nov 2026) — unchanged and kept.

## Scope
| Item | Value |
|---|---|
| Documents | CLSK 10-K FY2026 `0001193125-26-476040` + 8-K 2.02 `0001193125-26-475677` (filed 2026-11-24); FUFU 6-K Q3 2026 `0001213900-26-122400` (2026-11-20), October operating update `0001213900-26-116602` (comparative September column) |
| Added | `Q3_2026` records for CLSK (fiscal Q4 FY2026 = 12M − 9M) and FUFU (Tier 3); overlay entries CLSK Q3_2026 (miner D&A 80,403k; non-recurring cash SG&A 3,682k) |
| Not touched | the other 13 companies and all prior quarters (inputs identical to the base); CLSK EV/MW rows; CLSK fair-value repricing |

## Checks
- **LibreOffice recalc**: success — 5502 formulas, 0 errors
- **Engine compare** (independent Python recompute, no spreadsheet formulas): 1986 derived values, 1986 match, 0 mismatch (the 15 Nov release: 1932 of 1932; the 54 new values are CLSK/FUFU Q3 2026)
- **Checks sheet**: 142 PASS / 2 WARN / 0 ERROR — the two WARN rows are the unchanged ones of 15 Nov (MARA Q1 2026 realized price; CORZ Q3 2025 L0 vs reported)
- **CLSK 12M − 9M identity**: revenue 576,534 − 455,594 = 120,940; cost of revenues 342,307 − 262,792 = 79,515; D&A 428,173 − 333,229 = 94,944; SBC 52,893 − 38,735 = 14,158; interest expense 11,942 − 7,790 = 4,152; interest income 10,159 − 7,400 = 2,759; net income (987,092) − (996,896) = 9,804 — each equals the three-month column of the 8-K EX-99.1 (differences 0)
- **CLSK operating tables**: energy 341,830 − 262,493 = 79,337; non-energy utilities 478 − 300 = 178 (sum 79,515); kWh 6,231,213,623 − 4,878,563,000 = 1,352,650,623; miner D&A 379,706 − 299,303 = 80,403; BTC mined net 7,236 − 5,532 = 1,704 (gross 7,253 − 5,545 = 1,708); operating 36.02 EH/s and 1,015 MW from the Item 2 table (sum of states)
- **FUFU**: 9M revenue 153,151 = 6M 115,420 + Q3 37,731; 9M cost lines 65,681 + 81,464 + 8,589 = 155,734; Q3 cost lines 25,586 + 11,474 + 2,669 = 39,729; segments 13.8 + 18.4 + 2.0 + 3.5 = 37.7
- **Blind verification**: new inputs DERIVED-2x: 5, TEXT-1x/2x as extracted; **no blind second pass was run for the 54 new values** (one extraction pass plus the arithmetic reconciliations above); the 15 Nov flags of all other inputs are unchanged
- **Verdict**: READY
- **Post-stamp recalc**: success (0 errors)

## Result
Headline cohort 5 owner-operators (BTDR, HIVE, RIOT, CLSK, MARA): production-weighted L1 $62,225 per BTC, realized price $71,480, margin +12.9%, median $57,461, 10,483 BTC. CLSK Q3 2026: L0-E $46,559, L0 $46,664, L1 $71,228, L3 $120,850, realized price $70,974 (1,704 BTC). Before the update: four miners, $60,477 per BTC, +15.5%. Like-for-like with Q2 2026 (same five): $63,898 → $62,225 (−2.6%).

## Conventions
- CLSK per-BTC metrics divide by the net-of-pool-fee BTC count (as in all earlier CLSK quarters); the company's gross count is 1,708.
- CLSK `power_mw_operating` for Q3 2026 is the operational subset (1,015 MW); earlier quarters carried total contracted capacity — not comparable (flagged in the record).
- Per-BTC cost-to-mine table exists in the 10-K for the fiscal year only: quarterly `reported_*` fields are null; the Checks rows against reported metrics skip them.
- FUFU: no balance-sheet notes, cash flow or XBRL in the release; cash interest null; Tier 3 (self-mining cost not separable).

## Files and fingerprints (SHA-256)
- `mining_cost_v1.0_inputs_2026Q3_2026-11-25.json` — `94c41c6105466ad7b3a006b7da6a38704c5a8721471c454f3b11b70a9b2cb0aa`
- `overlay_std.py` — see the file in this folder (CLSK Q3_2026 entries added)
- Reproduce: copy the inputs file to `normalized.json`, then `python3 -I build_std.py`, `soffice --headless --convert-to xlsx --outdir recalc Mining_Cost_Standard_v1.0_2026Q3.xlsx`, `python3 -I mining_cost_engine.py --xlsx recalc/Mining_Cost_Standard_v1.0_2026Q3.xlsx`.
