{
 "standard": "HASHFLOPS Mining Capacity Standard",
 "version": "1.1",
 "data_cut": "2026-11-13",
 "release": "2026-11-15",
 "params": {
  "btc_spot_usd": 68249.27,
  "btc_spot_source": "BTC-USD daily close 2026-11-13 (Yahoo Finance research feed, via archive/inputs/mining_quotes_2026-11-14.csv)",
  "it_to_gross_default": 1.3,
  "committed_horizon_months": 24,
  "committed_cutoff": "2028-11-13",
  "stale_bs_days": 120,
  "stale_price_days": 5,
  "medians_min_n": 5
 },
 "companies": [
  {
   "ticker": "BTDR",
   "company": "Bitdeer Technologies Group",
   "cohort": "A",
   "price": 5.6,
   "shares_m": 276.149444,
   "pf_shares_m": 0.0,
   "debt_face": 1950.0,
   "pf_debt": 0.0,
   "cash": 174.25,
   "restricted": 39.45,
   "pf_cash": 0.0,
   "nci": 0.0,
   "btc": 4631,
   "btc_pledged": 0,
   "nonrecourse": 0.0,
   "d1": 1747.7,
   "d1_basis": "G",
   "d2": 2105.9,
   "d3": 3121.0,
   "hashrate_ehs": 73.0,
   "bs_date": "2026-09-30",
   "filing": "6-K Q3 2026 results (2026-11-10)",
   "filed": "2026-11-10",
   "conf": "C",
   "mw_note": "D1 = Online Electrical Capacity 1,747.7 MW at 2026-10-31 (Q3 release; was 1,752 at 31 Jul). D2 = D1 + the same 358.2 MW of 24-month additions as v1.0 (Massillon, Rockdale, Fox Creek, Cyberjaya, Johor Bahru) = 2,105.9. D3 = Total Global Electrical Capacity 3,121.0 MW (was 2,980.2).",
   "fin_note": "From the Q3 2026 press release (6-K): borrowings ~US$1.95bn (converts, bank loans, related-party BTC-collateralized loan at fair value), cash incl. restricted $213.7m (restricted $39.45m carried from H1 FS - split not in the release), digital assets + receivables $387.0m = ~4,631 BTC at the 30 Sep price (v1.0 counted 406 BTC held only). Shares: 276.15m = 271.78m + 4.37m (v1.0 pro forma); no Q3 cover count in the 6-K. Full Q3 balance sheet (6-K H1-style FS) not yet filed -> confidence C."
  },
  {
   "ticker": "MARA",
   "company": "MARA Holdings, Inc.",
   "cohort": "A",
   "price": 6.99,
   "shares_m": 387.406403,
   "pf_shares_m": 0.0,
   "debt_face": 3047.201,
   "pf_debt": 0.0,
   "cash": 946.545,
   "restricted": 12.0,
   "pf_cash": 0.0,
   "nci": 96.227,
   "btc": 34012,
   "btc_pledged": 19260,
   "nonrecourse": 0.0,
   "d1": 1900.0,
   "d1_basis": "G",
   "d2": 2405.0,
   "d3": 4800.0,
   "hashrate_ehs": 70.3,
   "bs_date": "2026-09-30",
   "filing": "10-Q Q3 2026",
   "filed": "2026-11-09",
   "conf": "B",
   "mw_note": "D1 = 'Total energy capacity' 1.9 GW at 2026-06-30 (10-Q MD&A) — includes third-party-hosted capacity; owned/hosted split not disclosed. D2 = D1 + Long Ridge 505 MW nameplate (485 MW CCGT; equity purchase agreement 2026-04-29, pending FERC, management guides close by year-end 2026). D3 = company 'potential power portfolio ~4.8 GW' (Long Ridge campus >1 GW + Matagorda County TX 2,000 MW site, ERCOT approval pending).",
   "fin_note": "Face debt $3,047.2m at 2026-09-30 (carrying $3,019.3m + $27.9m unamortized OID/costs); the Aug-2026 $600m BTC-backed term loans are now on the balance sheet (no pro forma). Cash $946.5m + restricted $12.0m. NCI = permanent $15.8m + redeemable (Exaion put) $80.4m. Bitcoin 34,012 incl. 19,260 BTC held as loan receivables (cost $2.70bn, fair value $2.84bn). Shares: 10-Q cover 2026-10-29."
  },
  {
   "ticker": "CLSK",
   "company": "CleanSpark, Inc.",
   "cohort": "A",
   "price": 6.65,
   "shares_m": 256.817073,
   "pf_shares_m": 0.0,
   "debt_face": 1811.559,
   "pf_debt": 2276.0,
   "cash": 202.601,
   "restricted": 3.738,
   "pf_cash": 2219.1,
   "nci": 0.0,
   "btc": 13530,
   "btc_pledged": 3475,
   "nonrecourse": 2276.0,
   "d1": 808.0,
   "d1_basis": "U",
   "d2": 1800.0,
   "d3": 1800.0,
   "hashrate_ehs": 50.0,
   "bs_date": "2026-06-30",
   "filing": "10-Q fiscal Q3 2026 + 8-K 2026-09-25 + Sept-2026 operational update",
   "filed": "2026-10-09",
   "conf": "B",
   "mw_note": "D1 = 'Utilized MW' 808 (maximum concurrent MW used by the fleet, September 2026 operational update, 2026-10-09). Basis U: utilized load, not energized nameplate — the last nameplate disclosure was 1,027 MW operational capacity at 2025-09-30 (FY2025 10-K); the company now reports only utilized MW and GW under contract. D2 = 1.8 GW under contract (all contracted power for owned/leased sites incl. Texas 585 MW ERCOT batch-zero baseload + 300 MW studied-load designations received Sept 2026; energization guided 2027, subject to the Texas data-center audit). D3 = D2: no development pipeline disclosed beyond contracted power (the 885 MW Texas exclusivity granted to the Sandersville tenant is inside the 1.8 GW).",
   "fin_note": "UNCHANGED from v1.0 (fiscal year ends 30 Sep; the FY2026 10-K is not filed yet - due late Nov/Dec 2026). Face debt $1,811.6m at 2026-06-30 + Sandersville $2,276.0m notes (pro forma, issued 2026-09-25). Only the price and BTC spot are refreshed; balance sheet is 137 days old at the data cut (stale flag). Refresh on 10-K filing."
  },
  {
   "ticker": "IREN",
   "company": "IREN Limited",
   "cohort": "B",
   "price": 18.17,
   "shares_m": 406.929463,
   "pf_shares_m": 17.37499,
   "debt_face": 10041.0,
   "pf_debt": 0.0,
   "cash": 3522.0,
   "restricted": 2256.0,
   "pf_cash": 630.0,
   "nci": 0.0,
   "btc": 0,
   "btc_pledged": 0,
   "nonrecourse": 1980.0,
   "d1": 2310.0,
   "d1_basis": "G",
   "d2": 2910.0,
   "d3": 5000.0,
   "hashrate_ehs": 23.2,
   "bs_date": "2026-09-30",
   "filing": "10-Q fiscal Q1 2027",
   "filed": "2026-11-05",
   "conf": "B",
   "mw_note": "D1 = grid-connected, energized site capacity per the 10-K Item 1 site table: Childress TX 750 + Sweetwater 1 1,400 (substation energized April 2026) + Canal Flats 30 + Prince George 50 + Mackenzie 80 = 2,310 MW. Load in service is far lower (~380 MW mining being decommissioned + AI Cloud; company targets 480 MW gross AI Cloud capacity in 2026 and 1.2 GW gross in 2027) — flagged as utilization gap. D2 = D1 + Sweetwater 2 600 MW (2028; the 2 GW Sweetwater hub was included as base load in ERCOT Batch Zero on 2026-09-08). D3 = company '~5 GW of total power capacity' under grid connection agreements/letters of agreement (adds Kiowa OK, Bundey AU, Badajoz ES).",
   "fin_note": "Principal of debt $10,041m at 2026-09-30 (converts $6,746m + recourse/other + non-recourse GPU financing $1,980m, of which USPP senior notes $1,571m). Cash $3,522m + restricted $2,256m. Pro forma: 17.375m shares issued under the ATM after quarter-end for ~$630m gross (10-Q Note 25); cover count 424.36m at 2026-10-30."
  },
  {
   "ticker": "RIOT",
   "company": "Riot Platforms, Inc.",
   "cohort": "A",
   "price": 17.52,
   "shares_m": 375.183965,
   "pf_shares_m": 0.0,
   "debt_face": 674.512,
   "pf_debt": 0.0,
   "cash": 669.052,
   "restricted": 79.17,
   "pf_cash": 0.0,
   "nci": 0.0,
   "btc": 2418,
   "btc_pledged": 0,
   "nonrecourse": 0.0,
   "d1": 1292.0,
   "d1_basis": "G",
   "d2": 1892.0,
   "d3": 1892.0,
   "hashrate_ehs": 44.4,
   "bs_date": "2026-09-30",
   "filing": "10-Q Q3 2026",
   "filed": "2026-11-04",
   "conf": "A",
   "mw_note": "D1 = 'Developed power capacity' at 2026-06-30: Rockdale 700 + Corsicana 400 + Kentucky 192 = 1,292 MW (10-Q MD&A), all owned sites; part of Rockdale serves the AMD and frontier-AI-lab data-center leases (241 IT MW contracted). D2 = D1 + Corsicana expansion to ~1 GW developed (+600 MW; substation interconnect in place, build 2027-2028; whole campus under non-binding LOI to a single tenant). D3 = D2: no further pipeline disclosed.",
   "fin_note": "Outstanding principal $674.5m at 2026-09-30 (0.75% converts 2030 $594.4m, revolvers/other); the Coinbase BTC-backed facility was repaid in September (no pro forma). Cash $669.1m + restricted $79.2m. Bitcoin 2,418 (v1.0: 11,380 at 30 Jun) - the company sold most of its holdings in Q3. The $573m Morgan Stanley interim project facility is still excluded (drawn amount not disclosed)."
  },
  {
   "ticker": "CORZ",
   "company": "Core Scientific, Inc.",
   "cohort": "B",
   "price": 14.52,
   "shares_m": 322.2362,
   "pf_shares_m": 0.0,
   "debt_face": 4385.0,
   "pf_debt": 0.0,
   "cash": 803.941,
   "restricted": 837.603,
   "pf_cash": 0.0,
   "nci": 0.0,
   "btc": 32,
   "btc_pledged": 0,
   "nonrecourse": 3300.0,
   "d1": 568.1,
   "d1_basis": "IT->G",
   "d2": 1430.0,
   "d3": 4504.5,
   "hashrate_ehs": null,
   "bs_date": "2026-09-30",
   "filing": "10-Q Q3 2026",
   "filed": "2026-11-05",
   "conf": "C",
   "mw_note": "Core Scientific discloses colocation capacity in critical-IT MW only (Billable 437 MW mid-July 2026; Leased ~1,100 MW; Total Leasable ~1,540 MW; AMD reservation right up to 1,925 MW more) and no gross utility figure in the Q2 10-Q. All three denominators are converted IT->gross at the Standard default 1.30 (Assumption): D1 = 437 x 1.30 = 568 (energized-but-unbilled HPC capacity and residual self-mining load are not quantified by the company and are excluded); D2 = 1,100 x 1.30 = 1,430 (CoreWeave ~590 MW by early 2027; AMD/Neocloud ~530 MW 2027-2028); D3 = (1,540 + 1,925) x 1.30 = 4,505. Hunt County (~430 MW gross) and Polaris/Muskogee (up to 440 MW gross) acquisitions sit inside the leasable/reservation figures.",
   "fin_note": "Notes payable $4,385.0m at 2026-09-30 (carrying $4,302.2m + $82.8m discounts): 7.75% senior secured notes 2031 $3,300m (non-recourse SPV) + converts. Cash $803.9m + restricted $837.6m (current $201.7m + non-current $635.9m). Digital assets $2.69m (~32 BTC). Warrant liabilities excluded. The Polaris acquisition (Aug 2026) is now in the balance sheet. Capacity (D1-D3) carried from v1.0 - Q3 update pending."
  },
  {
   "ticker": "CIFR",
   "company": "Cipher Digital Inc. (ex-Cipher Mining)",
   "cohort": "B",
   "price": 6.86,
   "shares_m": 456.365113,
   "pf_shares_m": 0.0,
   "debt_face": 6016.312,
   "pf_debt": 684.1,
   "cash": 656.009,
   "restricted": 2196.585,
   "pf_cash": 850.0,
   "nci": 25.67,
   "btc": 310,
   "btc_pledged": 0,
   "nonrecourse": 4543.0,
   "d1": 507.0,
   "d1_basis": "G",
   "d2": 907.0,
   "d3": 5300.0,
   "hashrate_ehs": null,
   "bs_date": "2026-09-30",
   "filing": "10-Q Q3 2026",
   "filed": "2026-11-02",
   "conf": "B",
   "mw_note": "D1 = Odessa 207 MW (wholly owned mining site, Luminant PPA) + Black Pearl 300 MW gross (Wink TX; energized N+1 substation, 216 IT MW AWS lease, first capacity delivered and rent commenced Aug 2026) = 507 MW. D2 = company 'operating + contracted' 907 MW at 2026-09-30 (= 207 mining + 700 MW gross contracted HPC: Black Pearl 300, Barber Lake 300 (Fluidstack/Google, 20-yr after Sept-2026 amendment, delivery Q4'26-Q1'27), Stingray (H1 2027)). D3 = 'approximately 5.3 GW of capacity across 11 sites, at various stages of interconnection' (10-Q MD&A; Oct-2026 deck: 907 MW + ~3.4 GW near-term pipeline energizing 2027-2030, plus Apollo 900 MW option and Colchis 1 GW).",
   "fin_note": "Outstanding principal $6,016.3m at 2026-09-30 (project notes Cipher Compute $1,733m + Black Pearl $2,000m + Stingray $810m, non-recourse; converts 2030 $172.5m, 2031 $1,300m). Pro forma for 2026-10-16: +$850m 0% converts 2032 (cash +$850m) and -$165.9m 2030 notes exchanged for 40.7m shares (already in the 456.37m cover count of 2026-10-30) -> net debt +$684.1m. Cash $656.0m + restricted $2,196.6m. Bitcoin ~310 = fair value $25.9m / 30-Sep price."
  },
  {
   "ticker": "HIVE",
   "company": "HIVE Digital Technologies Ltd.",
   "cohort": "A",
   "price": 1.57,
   "shares_m": 276.878228,
   "pf_shares_m": 0.0,
   "debt_face": 275.378,
   "pf_debt": 0.0,
   "cash": 138.99,
   "restricted": 0.0,
   "pf_cash": 0.0,
   "nci": 0.0,
   "btc": 268,
   "btc_pledged": 0,
   "nonrecourse": 0.0,
   "d1": 440.0,
   "d1_basis": "G",
   "d2": 610.0,
   "d3": 930.0,
   "hashrate_ehs": 25.2,
   "bs_date": "2026-09-30",
   "filing": "10-Q fiscal Q2 2027",
   "filed": "2026-11-09",
   "conf": "B",
   "mw_note": "D1 = 'approximately 440 MW of global power capacity' operated across Canada, Sweden and Paraguay (fiscal Q1 2027 release, 2026-08-15; site table at 2026-07-31 shows 457.5 MW capacity available / 389.5 MW utilized at owned + leased sites). D2 = D1 + 100 MW Yguazu PPA (energization Q4 2026) + 70 MW Tier-III builds (New Brunswick, Toronto, Little Boden; 2027) = 610. D3 = D2 + planned 320 MW GTA 'Gigafactory' (2028) = 930.",
   "fin_note": "Face debt $275.4m at 2026-09-30 ($115m + $130m 0% exchangeable notes 2031, loans payable $10.7m, term loan $1.2m, vendor mortgages $18.5m); lease liabilities and the $84.5m Swedish regulatory provision are not debt. Cash $139.0m. Bitcoin ~268 = $22.41m book value / $83.6k (30 Sep BTC price) - the 10-Q gives the amount, not the coin count (conf. flag). Shares: 10-Q cover 2026-11-06 (resolves the v1.0 WARN)."
  },
  {
   "ticker": "WULF",
   "company": "TeraWulf Inc.",
   "cohort": "B",
   "price": 12.62,
   "shares_m": 501.521605,
   "pf_shares_m": 0.0,
   "debt_face": 5725.0,
   "pf_debt": 0.0,
   "cash": 1602.127,
   "restricted": 753.193,
   "pf_cash": 0.0,
   "nci": 0.0,
   "btc": 18,
   "btc_pledged": 0,
   "nonrecourse": 3200.0,
   "d1": 500.0,
   "d1_basis": "G",
   "d2": 982.0,
   "d3": 2842.0,
   "hashrate_ehs": 10.6,
   "bs_date": "2026-09-30",
   "filing": "10-Q Q3 2026",
   "filed": "2026-11-06",
   "conf": "B",
   "mw_note": "D1 = Lake Mariner (Barker NY) energized grid capacity 500 MW (company: '500 MW of infrastructure capacity', expansion to 750 MW gross HPC leasing capacity pursued subject to interconnection approval); in-service load at 2026-07: 145 MW mining (being repurposed) + 102 IT MW HPC revenue-generating (438 IT MW contracted; 336 IT MW under construction). Company-disclosed gross/IT ratio at Lake Mariner = 750/600 = 1.25. D2 = D1 + Justified Data Campus (Hawesville KY) 482 MW utility power approved by Kentucky PSC 2026-08-24 (Anthropic 401 IT MW lease, delivery H2 2027 - early 2028) = 982. D3 = Lake Mariner 750 + Justified 482 + Muskie 1,000 (Kentucky Power ESA, 2028-2029) + Chesapeake/Morgantown MD ~210 (FERC-authorized generation site, pending close) + Cayuga/Lake Hawkeye 400 gross potential (2029) = 2,842.",
   "fin_note": "Principal maturities total $5,725.0m at 2026-09-30 (WULF Compute 2030 secured notes $3,200m + converts + revolver); unchanged principal vs 30 Jun. Cash $1,602.1m + restricted $753.2m (current $486.7m + non-current $266.5m). Bitcoin 18. Warrant liability excluded. Capacity carried from v1.0 - Q3 update pending."
  },
  {
   "ticker": "HUT",
   "company": "Hut 8 Corp. (consolidates American Bitcoin, ABTC)",
   "cohort": "B",
   "price": 57.57,
   "shares_m": 120.037556,
   "pf_shares_m": 0.0,
   "debt_face": 7726.41,
   "pf_debt": 0.0,
   "cash": 156.865,
   "restricted": 3555.96,
   "pf_cash": 0.0,
   "nci": 369.843,
   "btc": 16787,
   "btc_pledged": 3090,
   "nonrecourse": 7500.0,
   "d1": 710.0,
   "d1_basis": "G",
   "d2": 2040.0,
   "d3": 9370.0,
   "hashrate_ehs": 28.1,
   "bs_date": "2026-09-30",
   "filing": "10-Q Q3 2026",
   "filed": "2026-11-04",
   "conf": "B",
   "mw_note": "D1 = 'Energy Capacity Under Management' 710 MW at 2026-06-30 (all power-related assets incl. ASIC-compute sites Alpha NY, Medicine Hat AB, Salt Creek TX, Vega TX, Drumheller AB; 280 MW King Mountain JV managed services; ~3 MW Hut 8 Canada). D2 = D1 + 'Energy Capacity Under Construction' 1,330 MW post-quarter (River Bend LA 330 MW utility / 245 IT, first data hall Q2 2027; Beacon Point TX 1,000 MW utility / 704 IT across Phase 1 (Q3 2027) and Phase 2 (Q2 2028)) = 2,040. D3 = 'Total Energy Capacity Pipeline' 9,370 MW at 2026-06-30 (Under Diligence 5,400 + Under Exclusivity 1,880 + Under Development 550 + Under Construction 830 + Under Management 710).",
   "fin_note": "Principal debt $7,726.4m at 2026-09-30 (River Bend + Beacon Point project notes $7.5bn non-recourse, BTC-backed term loan, other). Cash $156.9m + restricted $3,556.0m (v1.0: $6,787m - project funds drawn). NCI $369.8m (American Bitcoin minority). Consolidated bitcoin 16,787 (3,090 pledged to Bitmain). Non-recourse share approximated at $7.5bn (project notes) - confirm in notes."
  }
 ],
 "fingerprint": "cdc93ae14ba3a33a57d9a4c8273c416922a003bef3401a584effd10dcbe88eab"
}