Bitcoin mining

HashpriceUSD per PH/s per day

Revenue a unit of mining capacity earns per day, quoted in US dollars per petahash per second.

Hashprice converts the Bitcoin price, block subsidy, transaction fees and network difficulty into a single revenue figure per unit of hashrate, so a miner can set it directly against its cost per unit. It is quoted in USD per PH/s (or TH/s) per day. The site's mining model uses $50/PH/day as its illustrative default; at that level and the default costs, the operating break-even is $34.90/PH/day and the investment break-even is $62.7/PH/day. Because hashprice tends to fall as the network grows, the model defaults to a drift of −12% per year.

See also: Hashrate · Hashcost · Difficulty

HashrateTH/s, PH/s or EH/s

Computational throughput of a miner or of the whole network, measured in hashes per second (TH/s, PH/s, EH/s).

Hashrate counts how many SHA-256 hashes a machine, a fleet or the entire Bitcoin network computes each second; 1 PH/s equals 1,000 TH/s and 1 EH/s equals 1,000 PH/s. A miner's share of network hashrate is, on average, its share of block rewards, which is why revenue scales with it. The site's mining calculator models a 1 PH/s installation as its reference unit, while a large operator such as Bitdeer reported 86.1 EH/s under management in Q2 2026. Hashrate alone says nothing about profitability until it is paired with efficiency and power cost.

Joules per terahash (J/TH)J/TH

Energy efficiency of mining hardware: the joules of electricity consumed per terahash computed.

J/TH expresses how much energy an ASIC needs for each terahash of work; lower numbers mean a cheaper hash. Multiplying J/TH by PUE and by the power tariff gives the electricity cost per unit of hashrate: with the model defaults of 19 J/TH, PUE 1.10 and $0.06/kWh, electricity at full uptime costs $30.10 per PH/s per day. Efficiency is the main lever a miner controls after the power contract, and each hardware generation resets the competitive floor.

Uptime% of hours

Share of calendar time that mining hardware is actually hashing and earning.

Uptime captures curtailment, maintenance, failures and firmware restarts; a fleet that is offline earns nothing but may still carry fixed costs. The mining model's default of 80% is deliberately conservative: year-1 revenue is 50 × 365 × 0.80 × 0.98 = $14,308 per PH/s after the pool fee, and annual energy at that uptime is $8,788. Sites that sell curtailment to the grid trade lower uptime for demand-response income, which the model does not capture.

Pool fee% of gross revenue

Percentage of block rewards retained by a mining pool for aggregating hashrate and smoothing payouts.

Solo mining produces lumpy, probabilistic income, so most miners route hashrate through a pool that pays out pro rata and keeps a fee. The site's model deducts 2% of gross revenue as a pool fee before any other cost, which is why default revenue is 98% of the raw hashprice. Payout schemes such as FPPS and PPLNS differ in how they allocate transaction fees and variance, but for a cash-flow model a flat percentage is the standard simplification.

See also: Hashprice · Uptime · Hashcost

Difficulty

Network parameter that adjusts roughly every two weeks so that blocks keep arriving about every ten minutes.

Difficulty rises when hashrate joins the network and falls when it leaves, keeping block production near its target rate. For a miner, higher difficulty means a smaller share of a fixed reward per unit of hashrate, which is why hashprice tends to erode even when the Bitcoin price is flat. The site's model does not simulate difficulty directly; it folds the effect into an assumed hashprice change of −12% per year that users can override.

See also: Hashrate · Hashprice

HashcostUSD per PH/s per day

All-in cash cost of producing a unit of hashrate, expressed in the same units as hashprice.

Hashcost is the mirror image of hashprice: the dollars a miner spends per PH/s per day on electricity, pool fees and site overhead, before capital recovery. In the site's model electricity alone is $30.10/PH/day at the 19 J/TH, PUE 1.10 and $0.06/kWh defaults; adding the 2% pool fee and $1,200 per year of other opex lifts the cash break-even to a hashprice of $34.90/PH/day at 80% uptime. The spread between hashprice and hashcost is the operating margin that must then fund the hardware.

ASIC cost per THUSD per TH/s

Purchase price of mining hardware per terahash of capacity, the main capital-cost metric for ASICs.

Quoting ASIC prices per TH/s makes machines of different sizes and generations comparable and ties capex directly to revenue capacity. The site's model defaults to $14.11/TH, or $14,110 per PH/s, with a 4-year holding period and a 10% residual value. Holding the other defaults constant, the price at which the default scenario reaches NPV = 0 is $5.61/TH, which shows how sensitive mining returns are to the hardware entry point. Prices move with hashprice expectations and with each efficiency generation.

Data centers & colocation

PUE (power usage effectiveness)ratio (dimensionless)

Total facility energy divided by the energy delivered to IT equipment; 1.0 would mean zero overhead.

PUE measures how much a facility adds on top of the IT load for cooling, power conversion and lighting. The site's calculators assume 1.10 for a mining site and 1.25 for a GPU cloud facility, and both figures scale the electricity bill directly. For an investor PUE links the IT capacity a tenant pays for to the utility capacity the operator must procure, and a persistent gap between the two is a cost the operator, not the tenant, usually carries.

IT MW (critical load)MW

Megawatts available to servers, GPUs or ASICs, excluding cooling and electrical losses.

IT MW, also called critical load, is the capacity data center tenants lease and pay for, so most industry pricing, build costs and EV/MW multiples are quoted against it. The site's data center model assumes 10 MW of IT capacity built at $10m per IT MW; Galaxy Digital's Helios phase I was delivered to CoreWeave with 133 MW of critical IT load. Multiplying IT MW by PUE gives the utility capacity the site must secure.

Utility MWMW

Gross power capacity contracted from the grid or a generator, including cooling and conversion overhead.

Utility MW is what the interconnection agreement, substation and transformers are sized for; it exceeds IT MW by the facility's PUE and any safety margin. At the GPU model's default PUE of 1.25, each 1 MW of IT load implies about 1.25 MW at the meter. Investors should check which figure a company quotes, since announcements of megawatts 'secured' often refer to utility capacity that has yet to be converted into leasable IT load.

Colocation

Leasing powered, cooled rack or hall space to tenants who bring their own IT equipment.

In colocation the operator owns the building, power and cooling and charges rent per kW or per rack; the tenant owns and operates the hardware. Revenue is contractual and recurring, which is why markets value it more like real estate than like mining. Core Scientific reported colocation revenue of $136.7m out of $164.2m in Q2 2026 (83%), and WhiteFiber booked $4.7m of colocation alongside $23.8m of cloud services, illustrating how former miners are shifting their mix.

Rent per kWUSD per kW per month

Colocation lease price quoted per kilowatt of IT capacity per month, usually with power passed through at cost.

Pricing per kW ties rent to the scarce input, power, rather than to floor space. The site's data center model uses $150/kW/month with 2% annual growth and electricity billed to tenants at cost, so at 85% occupancy a 10 MW IT facility earns 10,000 kW × $150 × 12 × 0.85 = $15.3m of base rent per year. Whether a quoted rate is gross or net of power changes its meaning materially, so compare like with like.

Occupancy% of IT capacity

Share of leasable IT capacity that is contracted and generating rent.

Occupancy drives data center revenue almost linearly, because fixed costs change little between an empty and a full hall. The site's model assumes 50% occupancy in year 1 rising to a stabilized 85% by year 3; the operating break-even, where rent covers cash operating costs before maintenance, is only 11.1%, which illustrates the operating leverage of the asset class. Capacity that is contracted but not yet billing is usually reported separately as backlog.

Lease-up

The period between a facility's completion and its reaching stabilized occupancy.

Lease-up is when a developer carries the full cost of a building while rent ramps; its length is one of the largest risks in a development model. The site's default path moves from 50% occupancy in year 1 to 85% by year 3. Pre-leased AI campuses can compress lease-up to near zero, as with Galaxy Digital's 526 MW contracted under 15-year leases or WhiteFiber's 40 MW NC-1 campus under a 10-year agreement with Nscale.

AI infrastructure & GPU cloud

GPU-hourGPU-hour

Unit of GPU cloud output: one accelerator rented for one hour.

GPU cloud providers price and report capacity in GPU-hours, so revenue per GPU per year equals hours sold multiplied by the realized hourly rate. A single GPU has 8,760 hours in a year; at the site's default rate of $2.50 the theoretical revenue capacity is $21,900 per GPU-year before utilization. The default investment break-even is $3.13 per GPU-hour, which shows how tightly the economics depend on achieved pricing.

Billable utilization% of available GPU-hours

Share of available GPU-hours that are actually sold to customers at a price.

Billable utilization excludes idle capacity, internal use and time lost to failures or re-imaging, so it is the figure that converts installed GPUs into revenue. The site's GPU model defaults to 65%. The operating break-even is only 9.7%, since cash opex per GPU-year, including power charged for all 8,760 hours regardless of use, is $2,120 against a revenue capacity of $21,900; the investment break-even, where NPV reaches zero at the 18% discount rate, is 81.4%. That gap between cash break-even and capital break-even is the central tension of the neocloud model.

Realized rateUSD per GPU-hour

Average price actually received per GPU-hour after discounts, commitments and mix, as opposed to the list price.

List rates for accelerators overstate what providers collect because long-term contracts, reserved capacity and spot markets all clear at different levels. The site's model uses a realized $2.50 per GPU-hour declining 10% per year as newer hardware arrives. For an investor the realized rate multiplied by billable utilization is the revenue line; a filing that discloses only list prices or contracted capacity leaves it unknown.

GPU depreciationyears, or USD per GPU per year

Loss of an accelerator's economic value over its service life, the largest non-cash cost in GPU cloud.

Because each hardware generation lowers the price per unit of compute, a GPU's earning power falls faster than its physical wear. The site's model assumes $35,000 installed per GPU, a 4-year life and a 10% residual value; the installed cost at which the default scenario breaks even on NPV is $26,848. Companies that depreciate over longer periods report higher earnings for the same cash flows, so useful-life assumptions deserve attention in any comparison.

Neocloud

A GPU-focused cloud provider that rents accelerators for AI workloads rather than offering a general-purpose platform.

Neoclouds buy GPUs, place them in owned or leased data centers and sell compute by the GPU-hour, often under multi-year contracts. Several listed miners have added such a line: IREN reported $128.8m of AI Cloud Services revenue out of $707.0m in FY2026 (18.2%), Bitdeer $14.0m out of $228.8m in Q2 2026 (6.1%), and WhiteFiber $23.8m of cloud services out of $28.8m. The model is capital-intensive and depends on realized rates and utilization holding up through hardware cycles.

HPC colocation

Leasing high-density, liquid-cooled data center capacity to AI or HPC tenants who supply their own GPUs.

HPC colocation is the landlord version of the AI build-out: the operator delivers power, cooling and shell under long leases and the tenant deploys the accelerators. TeraWulf reported $31.9m of HPC lease revenue out of $44.8m in Q2 2026 (71%), and Applied Digital $203.0m of HPC hosting out of $258.7m (78%), of which $152.4m was one-off tenant fit-out. Galaxy Digital has 526 MW contracted under 15-year leases. Investors should separate recurring base rent from fit-out pass-throughs.

Valuation & returns

Cap rate% per year

Capitalization rate: a property's stabilized net operating income divided by its value or price.

Cap rates are how real estate markets express the yield at which income-producing assets trade; a lower cap rate means a higher price per dollar of income. The site's data center model values the facility at exit by capitalizing year-10 net operating income at 8% and deducting 2% selling costs. Because the exit value is a large share of a 10-year NPV, the assumed cap rate is often the single most influential input in the model.

EV per MWUSD per MW

Enterprise value divided by megawatts of capacity, a cross-company comparison metric for miners and data center operators.

EV/MW asks how much the market pays for each megawatt of energized or contracted capacity, bypassing differences in accounting and hardware vintage. The denominator matters: IT MW, utility MW, operating and under-construction capacity all give different answers, and announcements often mix them. As a reference point, the site's data center model assumes a build cost of $10m per IT MW, so an EV/MW well above replacement cost implies the market is paying for contracts, power rights or growth rather than for the physical asset.

Development yield% per year

Stabilized net operating income divided by total development cost: the return on building rather than buying.

Development yield, or yield on cost, is compared with the exit cap rate: the spread between them is the developer's reward for construction, lease-up and financing risk. In the site's model the stabilized base rent is $15.3m on a $100m build before the operating and maintenance allowances, and the exit is capitalized at 8%. When development yields compress toward cap rates, new supply becomes less attractive, which is one way to read where a cycle stands.

See also: Cap rate · Lease-up · Rent per kW

Adjusted NAVUSD per share

Net asset value recomputed with assets marked to market and claims against them deducted, usually per share.

Adjusted NAV is used where book value misstates economics: Bitcoin holdings are marked to spot, hardware and power assets to replacement or transaction value, and debt, preferred stock and in-the-money convertibles are subtracted. Dividing by fully diluted shares gives a per-share figure to set against the stock price, producing a premium or discount. The method is only as good as the marks, and for treasury companies the choice of which instruments to treat as dilutive drives the result.

FCFF (free cash flow to the firm)USD per year

Operating cash flow after tax and capital expenditure, before any financing flows.

FCFF is the cash a project or company generates for all capital providers combined, so it can be discounted at a blended rate without modeling debt schedules. The site's three calculators work on this unlevered basis with annual cash flows: in the mining model, year-1 operating cash profit is $4,320 per PH/s before maintenance, tax at 25% on positive EBIT and the initial outlay. Equity returns would differ once financing is layered on.

Enterprise value bridge

The reconciliation from equity market value to enterprise value: add debt and other claims, subtract cash.

The bridge starts with market capitalization, adds debt, leases, preferred stock and minority interests, and subtracts cash and liquid assets, so that EV reflects the price of the operating business. For miners and treasury companies the bridge is unusually important because Bitcoin holdings can be treated as cash-like, which shrinks EV and changes every EV multiple, including EV/MW. The choice should be stated explicitly in any comparison.

Bitcoin per shareBTC (or sats) per share

Bitcoin held by a company divided by its diluted share count, the core metric for Bitcoin treasury companies.

Bitcoin per share tracks whether capital raising and purchases are accretive to existing holders: issuing stock above the Bitcoin-backed value per share increases it, issuing below decreases it. It is often quoted in satoshis per share for readability. The metric ignores operating businesses, debt and the price at which future issuance will happen, so it is a starting point for a treasury analysis rather than a valuation.

Dilution% change in share count

Reduction in each existing share's claim on a company when new shares, options or convertibles are issued.

Miners and AI infrastructure builders are capital hungry and fund much of their growth through at-the-market equity programs and convertible notes, so per-share metrics can fall even while the company grows. Measuring dilution requires point-in-time share counts from filings rather than a single current figure. Any per-share analysis, from Bitcoin per share to adjusted NAV, should state whether it uses basic or fully diluted shares.

Operating break-even

The input level at which revenue just covers cash operating costs, ignoring capital recovery, maintenance and tax.

Operating break-even answers whether an asset should keep running, not whether it should have been built. In the site's model defaults it is a hashprice of $34.90/PH/day for mining (electricity, pool fee and other opex), 9.7% billable utilization for GPU cloud, and 11.1% occupancy for a data center. The low operating break-evens in the GPU and data center models reflect high fixed costs, which cut both ways: resilient once built, punishing if demand disappoints.

Investment break-even

The input level at which a project's NPV reaches zero at the chosen discount rate, holding other inputs constant.

Investment break-even includes the capital outlay, maintenance, tax and the time value of money, so it is far more demanding than operating break-even. With the site's defaults the mining model breaks even at a hashprice of $62.7/PH/day, or power at $0.039/kWh, or an ASIC cost of $5.61/TH; the GPU model at $3.13 per GPU-hour, 81.4% utilization or $26,848 per GPU. Each figure is solved one input at a time, so they are alternatives, not a combination.

NPV (net present value)USD

The sum of future cash flows discounted to today, minus the initial investment.

A positive NPV means the project earns more than the discount rate demands; a negative one means it earns less, even if it is cash-positive. At their illustrative defaults the site's mining model returns −$7,571 per PH/s and the GPU model −$822,326, while the data center model returns +$18.4m on a $100m build. NPV depends heavily on the discount rate and on the terminal or residual value, so both should be reported alongside it.

IRR (internal rate of return)% per year

The discount rate at which a project's NPV equals zero.

IRR expresses a cash-flow stream as an annualized yield that can be compared with a hurdle rate. The site's defaults produce −22.4% for mining, 8.2% for GPU cloud against an 18% hurdle, and 14.5% for the data center against 12%. IRR is undefined when cash flows never change sign and ambiguous when they change sign more than once, and it says nothing about scale, which is why the calculators show NPV alongside it.

Discount rate% per year

The annual return required by capital providers, used to convert future cash flows into present value.

The discount rate bundles the time value of money with a risk premium for the asset; a higher rate lowers NPV and raises the break-even inputs. The site's calculators use 15% for mining, 18% for GPU cloud and 12% for data centers, reflecting the different durability of the three cash-flow streams, and users can override each. In an unlevered model it corresponds to a weighted average cost of capital rather than an equity return.

Index construction

Total return% per year

Performance including reinvested dividends and distributions, not just price change.

Total return is the correct basis for comparing an index with a fund or an alternative investment, because dividends are part of what an investor receives. The Data Center Full Cycle Index research calculation is a net total return series: 28.7% CAGR from 30 Jun 2015 to 9 Oct 2026 after model costs, versus 26.9% for its price-return variant, so dividends contributed about 1.8 percentage points per year. Benchmarks such as QQQ and SPY are compared on the same basis.

Price return% per year

Performance measured from price changes alone, excluding dividends.

Price-return indices are easier to compute and are what most headline equity benchmarks quote, but they understate what holders earn. The Data Center Full Cycle Index price-return variant compounds at 26.9% per year over the research history against 28.7% for the net total-return version. For a thematic index concentrated in growth-oriented hardware and infrastructure names the gap is modest; for utilities or REITs it would be much wider.

Drawdown% from peak

Decline from a prior peak to a subsequent trough, usually quoted as the maximum over a period.

Maximum drawdown describes the worst loss an investor who bought at the top would have suffered before the series recovered, and how long recovery took. Over 2015–2026 the Data Center Full Cycle Index research series fell 39.4% between January and October 2022 and regained its peak in June 2023; QQQ's maximum drawdown in the same period was −35.1%, SPY's −33.7% and ACWI's −33.5%. The index's deeper drawdown is consistent with its higher volatility of 23.7%.

Sharpe ratioratio

Excess return per unit of volatility, the standard risk-adjusted performance measure.

The Sharpe ratio divides return above a risk-free rate by the standard deviation of returns, so that two series with different risk can be compared. The Data Center Full Cycle Index research series has a Sharpe of 1.10 over 2015–2026 against 0.83 for QQQ, 0.73 for SPY and 0.60 for ACWI. Because many rule variants were tested, the site also reports a deflated Sharpe probability of 97.6% across 16 pre-registered variants, which adjusts for the selection among them.

CAGR (compound annual growth rate)% per year

The constant yearly return that would turn the starting value into the ending value over the period.

CAGR smooths a volatile path into a single annualized figure and is the usual headline for an index backtest. The Data Center Full Cycle Index research calculation shows 28.7% net of costs from 30 Jun 2015 to 9 Oct 2026, versus 19.7% for QQQ, 14.4% for SPY and 11.3% for ACWI. A single CAGR hides estimation error: the bootstrap 90% confidence interval for the index is 14%–47%, which is the range a reader should keep in mind rather than the point estimate.

Thematic purity% of weighted revenue

Weighted average share of constituents' revenue that comes from the index theme.

Thematic purity measures how much of an index is actually exposed to its stated theme rather than to conglomerates that happen to touch it. For the Data Center Full Cycle Index it is the weight-averaged data-center revenue exposure of the constituents: 63% after the 30 Sep 2026 rebalance. The figure results from the admission rules (20% exposure to enter, 15% to stay) combined with weights proportional to exposure squared, which push capital toward the most exposed names.

Exposure weighting

Index weighting that scales each constituent by its revenue exposure to the theme as well as by its size.

Pure capitalization weighting would let the largest diversified companies dominate a thematic index; pure equal weighting ignores liquidity. The Data Center Full Cycle Index rules set weights proportional to exposure² × √market cap, apply a 5% single-stock cap, and allocate nominal budgets of 20% to each of five segments (Power, Thermal & Electrical Systems, Connectivity, Compute, Capacity) with a 35% ceiling. The square root compresses size differences while the squared exposure rewards purity.

Point-in-time data

Using only the data that was available on each historical date, with no later revisions or hindsight.

A point-in-time database records what an investor could have known at the time: share counts from the filing then in force, revenue segments as originally reported, and index membership as it stood. The Data Center Full Cycle Index research calculation uses SEC point-in-time share counts and Yahoo adjusted closes for this reason. Where the retrospective universe itself was assembled with today's knowledge of which companies became data-center names, point-in-time data cannot remove the resulting bias.

Survivorship bias

Overstatement of historical performance that comes from studying only the companies that exist and succeeded today.

A backtest built on a current universe silently excludes firms that went bankrupt, were delisted or never grew into the theme, and includes winners that were not identifiable in advance. The Data Center Full Cycle Index research history from 2015 carries this selection and survivorship bias explicitly; only the period from the official start on 30 Jun 2025 at 1,000 is free of it. The bootstrap interval of 14%–47% for CAGR and the deflated Sharpe test are partial, not complete, corrections.

Rebalance

The scheduled reset of index weights and, less often, of index membership according to the rules.

Between rebalances, weights drift with prices; a rebalance restores them to their rule-based targets and realizes transaction costs. The Data Center Full Cycle Index rebalances quarterly, with constituent selection performed once a year in June; the 30 Sep 2026 rebalance left 35 constituents. The research calculation charges 15 bp per dollar traded at each rebalance, in addition to a 0.60% annual fee, so turnover is a direct drag on the reported net return.

Free float% of shares outstanding

The portion of a company's shares available for public trading, excluding insider, government and strategic holdings.

Free float determines how much of a company an index fund could realistically own, which is why most capitalization-weighted benchmarks use float-adjusted rather than total market cap. Index methodologies should state which basis they use; the Data Center Full Cycle Index weight uses the square root of market capitalization, which compresses the influence of the largest issuers before the 5% cap applies. Low-float constituents raise implementation costs, and in a research calculation those costs are only approximated by the per-dollar trading charge.

Definitions follow the conventions of the methodology. Numerical illustrations come from the calculator defaults (model v1.1) and the Data Center Full Cycle Index research calculation; neither is a market quote or a forecast.