WORKED CASES · PROJECT ECONOMICS

Start with a project. Build an investment case.

Three worked starting points connect operating assumptions with cash flow, each opening directly in the calculator with the inputs pre-filled. They are illustrative cases, not investment offerings — and two of the three do not clear their hurdle rate at the default assumptions, which is the point of running them.

CASE 01 / BITCOIN MINING

A 1 PH/s ASIC investment

Equipment acquisition against an explicit hashprice path, energy tariff and operating schedule.

Initial equipment investment$14,110
  • 19 J/TH fleet efficiency, PUE 1.10
  • 80% uptime and $0.06/kWh power
  • Hashprice $50/PH/day, −12% a year
  • Four-year holding period, 15% discount rate

Result: NPV −$7,571, IRR −22.4%. Operating break-even $34.90; investment break-even $62.70 hashprice or $0.039/kWh.

Open the complete scenario →
CASE 02 / COLOCATION

A 10 MW data center

A lease-up schedule from first operations to stabilized occupancy and a year-ten sale.

Initial development investment$100 million
  • 10 MW of IT capacity at $10m per MW
  • 50% initial, 85% stabilized occupancy by year 3
  • $150/kW/month starting rent, +2% a year
  • 8% exit capitalization rate, 12% discount rate

Result: NPV +$18.4m, IRR 14.5%. Rent of $130/kW/month or a build cost of $11.6m/MW would bring NPV to zero.

Open the complete scenario →
CASE 03 / GPU CLOUD

A 128-GPU deployment

Whether realized pricing and billable utilization justify the installed hardware cost.

Initial installed investment$4.48 million
  • $35,000 installed cost per GPU
  • 65% billable utilization at $2.50 per GPU-hour
  • 1.2 kW per GPU, PUE 1.25, $0.07/kWh
  • Four-year hardware life, 18% discount rate

Result: NPV −$822k, IRR 8.2%. The capital is recovered at 81% utilization, $3.13 per GPU-hour or $26,800 per GPU.

Open the complete scenario →
FROM AN EXAMPLE TO A REAL PROJECT

Three steps the calculators cannot take for you.

01 / DEFINE

Asset and rights

Document land, interconnection, permits, ownership, IT capacity and customer requirements. A megawatt in a queue is not a megawatt behind a meter.

02 / MODEL

Cash and obligations

Reconcile construction schedules, customer payments, maintenance, taxes and committed funding — monthly during construction, not annually.

03 / DECIDE

Return and downside

Test delays, lower utilization, weaker prices, refinancing and the residual asset value. The better allocation is the one that survives the downside case.