Every release, its dates and what was actually checked.
One register feeds the dates and statuses shown on the home page, the library, the research pages and the downloads. A date is taken from a validation log or a release document, never from a file name or from the time a file was uploaded. “Not recorded” means no log states it.
Six dates, kept apart.
Source data: the market or filing date the numbers describe. Calculated: when the figures were produced. Checked: when the checks below ran. Released: the owner’s release date. On site: first publication on hashflops.io. Overdue is shown only against an approved schedule.
| Release | Version | Source data | Calculated | Checked | Released | On site | Frequency |
|---|---|---|---|---|---|---|---|
| Data Center Full Cycle Index levels and constituents | v0.4 / weekly release 2026-11-23 (publication pack 2026-10-16) | 2026-11-23 | 2026-11-24 | 2026-11-24 | 2026-11-24 | 2026-11-24 | Every Monday (approved by the owner on 18 Oct 2026); delay up to 1 business day; holiday: next business day |
| Mining Cost Standard (Q3 2026) | 1.0 | 2026-09-30 | 2026-11-15 | 2026-11-15 | 2026-11-15 | 2026-11-15 | Full re-base on the approved quarterly calendar (28 Feb, 31 May, 31 Aug, 30 Nov) on one common data cut; between re-bases a company's cost per BTC is updated within one business day of its new 10-Q, 10-K or earnings release (owner decision 15 Nov 2026). The Q3 2026 re-base was run early, on 2026-11-15 (owner decision), instead of 2026-11-30, so the next full re-base is 2027-02-28; interim additions (CLSK, CANG, FUFU) follow their filings. Version date (standard v1.0) and data cut (Q3 2026, source data 2026-09-30) are separate fields. |
| Mining Capacity Standard (value per megawatt) | 1.1 | 2026-11-13 | 2026-11-15 | 2026-11-15 | 2026-11-15 | 2026-11-15 | Daily roll every US session (EV from the latest close, share count, debt and cash; dashboard /mining/value-per-megawatt/, data /data/mining/capacity_daily.json); new inputs from SEC filings within one business day; full re-base on the approved quarterly calendar (28 Feb, 31 May, 31 Aug, 30 Nov) — MW re-base 2026-11-30 (owner decisions 15 Nov 2026). FY2026 10-K data have no separate date. |
| Mining NAV Standard (v1.2 re-anchoring) | 1.2 (workbook v1.1); interim data revision 2026-11-16 | 2026-10-15 | 2026-11-16 | 2026-11-16 | 2026-11-16 | 2026-11-16 | Full re-base on the approved quarterly calendar (28 Feb, 31 May, 31 Aug, 30 Nov) on one common data cut; between re-bases a company's NAV per share is updated within one business day of a filing with new inputs (owner decision 15 Nov 2026). Q3 2026 re-base on 2026-11-30; FY2026 10-K data have no separate date. |
| Mining Companies Catalog | 1.1 | 2026-10-15 | 2026-10-17 | 2026-10-17 | 2026-10-17 | 2026-10-18 | Quarterly (calendar: 28 Feb, 31 May, 31 Aug, 30 Nov, stated in methodology) |
| CleanSpark fair value model (withdrawn 20 Nov 2026) | 4.1 | 2026-06-30 | 2026-11-15 | 2026-11-15 | 2026-11-15 | 2026-11-15 | None (withdrawn). CleanSpark updates follow the valuation of miners and AI data-centre landlords. |
| ASIC Hashrate Price Standard | 1.0 (data revision 3.1) | 2026-10-02 | 2026-10-17 | 2026-11-23 | 2026-11-23 | 2026-11-23 | Monthly, first business day of the month (approved by the owner on 18 Oct 2026); October 2026 data rescheduled to 2026-11-23 (owner instruction 15 Nov 2026). |
| Equity Valuation & Publication Standard | 1.0 | not recorded | not recorded | not recorded | 2026-10-16 | 2026-10-18 | On revision |
| Company directory (catalog methodology 1.3) | 1.3 | 2026-11-13 | 2026-11-15 | 2026-11-15 | 2026-11-15 | 2026-11-15 | Market data: daily market roll (price, market cap, EV, multiples). Fundamentals: quarterly (28 Feb, 31 May, 31 Aug, 30 Nov) |
| Net Debt Calculation Standard | 1.0.1 | 2026-11-16 | 2026-11-16 | 2026-11-16 | 2026-11-16 | 2026-11-16 | Quarterly with each 10-Q / 10-K of the issuer; the filings watch triggers a re-run on a new periodic report. |
| Revenue Classification Standard | 1.0 | 2026-09-30 | 2026-11-18 | 2026-11-18 | 2026-11-18 | 2026-11-18 | With each quarterly filing of the covered issuers; catalog alignment on the approved quarterly calendar. |
| Market Data and Calculation Inputs Standard | 1.0 | 2026-11-20 | 2026-11-21 | 2026-11-21 | 2026-11-21 | 2026-11-21 | Rules document: a new version on any change to a source, a schedule, an acceptance rule or a check. The data it governs are updated every US trading day (04:00 Moscow time) and within one business day of a filing. |
| Valuation of miners and AI data-centre landlords | 0.9.6 | 2026-11-18 | 2026-11-21 | 2026-11-21 | 2026-11-21 | 2026-11-21 | Standard 0.9.6, section 9: market data every US trading day; a new edition within 10 business days of a quarterly or annual report, within 5 of a new lease, letter of intent, GPU contract, financing or closed purchase, and when bitcoin moves more than 20% or a share count more than 5%; a full re-cut on the quarterly calendar (28 Feb, 31 May, 31 Aug, 30 Nov). |
| Data Center Full Cycle Index: daily official level | v0.4 / daily forward roll, data as of 2026-11-23 | 2026-11-23 | 2026-11-24 | 2026-11-24 | 2026-11-24 | 2026-11-24 | Every US trading day, 04:00 Moscow time (01:00 UTC) the next calendar morning; Tue-Sat |
| SEC filings feed: priority companies | watch log, EDGAR checked 2026-11-24 | 2026-11-23 | 2026-11-24 | 2026-11-24 | 2026-11-24 | 2026-11-24 | Every 3 hours (17 minutes past the hour, UTC; owner decision 15 Nov 2026) and at the daily site build; append-only log keyed by accession number |
Verification scope, release by release.
A matching SHA-256 shows that a file is unchanged. It does not show that the economics of the model is right. The columns say which kind of check was actually run; the verdict is shown with its warnings.
| Release | Recalculation of formulas | Independent recomputation | Check against primary sources | Verdict | WARN |
|---|---|---|---|---|---|
| Data Center Full Cycle Index levels and constituents | workbook recalculated in LibreOffice; control metrics match the Python engine (frozen run) | live window 12-16 Oct recomputed from raw adjusted closes without engine code (difference 2.8e-17); full re-run on refreshed snapshot reproduces all 1,118 composition rows | not performed for exposure estimates (analyst estimates; 3 of 35 rest on disclosed splits) | READY | — |
| Mining Cost Standard (Q3 2026) | LibreOffice: 5378 formulas, 0 errors | engine: 1932 derived values, 0 mismatches | blind verification of source fields (Q3 2026 inputs re-read without sight of the first pass; prior quarters carried over): TEXT-1x: 370, TEXT-2x: 327, XBRL: 415 | READY | 3 |
| Mining Capacity Standard (value per megawatt) | Excel workbook not rebuilt for v1.1; inputs JSON + engine are the reproducible artefacts | capacity_engine.py recomputes from the inputs JSON: 0 mismatches | source IDs per field; no separate blind re-read recorded | READY | 7 |
| Mining NAV Standard (v1.2 re-anchoring) Exception: Mining NAV v1.2 is an exception to the 'two computations' rule. | v1.1 workbook: 4,786 formulas, 0 errors. v1.2: NO new workbook | v1.1: engine 173 values, 0 mismatches. v1.2: single engine only (no second independent engine); reproduces v1.1 values at the old level and passes a linearity test | inherited from v1.1; not repeated | READY | 16 |
| Mining Companies Catalog | LibreOffice: 366 formulas, 0 errors | engine: 346 derived values, 0 mismatches | 16 blocking checks, 0 conflicts; every number links to a source id | READY | 1 |
| CleanSpark fair value model (withdrawn 20 Nov 2026) Exception: One computation route: v4.1 is computed by the engine only (the v4.0 workbook is not in the repository, so the LibreOffice route is unavailable); published without the 12-hour pause at the editor's instruction (15 Nov 2026). | not available for v4.1 (no workbook in the repository); v4.0: LibreOffice 4,249 formulas, 0 errors | engine 4.1 from the complete inputs file: reproduces all 51 published v4.0 outputs (0 mismatches); v4.1 = five market inputs changed | market inputs and the restored balance-sheet lines cited to their sources in the inputs file | WITHDRAWN — superseded by the valuation of miners and AI data-centre landlords, edition 0.9.3 | 8 |
| ASIC Hashrate Price Standard | LibreOffice: 9,444 formulas, 0 errors | validate31.py: 5,131 checks, 0 mismatches; publication builder recompute: 990 metric cells + 33 pairs, 0 mismatches; update 2026-11-23: strict contour from public CSV 920 checks and IPMK 165 checks, 0 mismatches (extended contour with offers not reproducible from public files) | class A transactions cite sec.gov URLs; Canaan ASP table not re-read; P49 re-read twice 2026-11-23 | READY with WARN | 6 |
| Equity Valuation & Publication Standard | not applicable | not applicable (document) | not applicable | N/A (rules document) | — |
| Company directory (catalog methodology 1.3) | LibreOffice recalculation of the workbook (per methodology) | independent Python recomputation (per methodology) | vendor ratios compared with recomputed ratios; disagreements coded as REVIEW | READY with REVIEW flags | 3 |
| Net Debt Calculation Standard | net_debt.py recomputes every measure from the components in the CSV | measures recomputed from component columns: see QA | components read from SEC companyfacts at one balance-sheet date; no blind re-read against the filing documents | READY | 3 |
| Revenue Classification Standard | shares recomputed from the CSV | class sums equal filing totals for all issuers (Bitdeer other revenue 4.8 stated outside the segment table) | lines from the segment notes and XBRL dimensions of the Mining Cost Standard inputs; no blind second reading | READY | 3 |
| Market Data and Calculation Inputs Standard | n/a (rules document); the daily rolls recompute their own files with --check | market_data_check.py re-reads every governed file: 0 errors, 0 warnings on 21 Nov 2026 | interim inputs carry the form, accession number and link of the filing; the frozen valuation snapshot matches its SHA-256 | READY | 1 |
| Valuation of miners and AI data-centre landlords Exception: VX-2026-02: values before tax; leases valued on the first full-year operating income at a cap rate; mining sites at the cost to rebuild (see the equity valuation standard, Exceptions) | LibreOffice: 1,230 formulas, 0 errors | Python engine against the formula workbook: 840 values, 0 differences; all ten companies recomputed by a separate script written from the text of the standard (largest difference 1.6e-13 dollars a share); block review of every company (annex A): 0 findings to fix, 11 open | every signed lease and GPU cloud contract cited to its filing or the company's own release or call: the nineteen that rested on news reports, estimates or unlinked filings traced to their sec.gov documents (annex C of the standard, register r7); one contract value, Riot's AMD expansion, is not disclosed and stays our estimate; CleanSpark checked line by line against its 10-Q of 30 Jun 2026 and its 8-Ks of 14 Jul, 17 Sep and 25 Sep 2026 | READY with WARN | 8 |
| Data Center Full Cycle Index: daily official level | not applicable (Python roll-forward) | daily summary check: sum of weight x constituent move versus the index move (see weekly release); full independent recomputation was done for 12-16 Oct only | not performed (Yahoo Finance and ECB research data) | READY | 3 |
| SEC filings feed: priority companies | not applicable (event log) | not applicable: filings are recorded as listed on EDGAR; labels derive from form type, 8-K items and report period only | every row links to the primary document on sec.gov; the watcher does not read document text; filings that can cross a base threshold (REVIEW / DEADLINE) and headline-check rows are read on business days and closed with a recorded decision (impact_log.csv) | READY | 1 |
“Two computations” (a recalculated workbook and an independent engine) is the standard for workbook releases. Mining NAV v1.2 is built from a single engine with no new workbook; Data Center Full Cycle Index rests on a recalculated workbook plus an independent recomputation of the live window; the company directory relies on the methodology’s recalculation and ratio checks. Nothing here is an external audit.
Approved dates and open schedules.
Only dates that are written into a methodology or release note are listed as approved. Where a frequency is stated without dates, no deadline exists and nothing is shown as late.
| Release | Next approved event | Date | Status | Schedule status |
|---|---|---|---|---|
| Data Center Full Cycle Index levels and constituents | Weekly publication | 2026-11-30 | due in 6 days | Approved (owner, 18 Oct 2026): publication every Monday; if Monday is not a US business day, the next business day; allowed delay 1 business day; rebalance 2026-12-31; selection 2027-05-31 |
| Data Center Full Cycle Index levels and constituents | Quarterly rebalance | 2026-12-31 | due in 37 days | Approved (owner, 18 Oct 2026): publication every Monday; if Monday is not a US business day, the next business day; allowed delay 1 business day; rebalance 2026-12-31; selection 2027-05-31 |
| Data Center Full Cycle Index levels and constituents | Annual selection | 2027-05-31 | due in 188 days | Approved (owner, 18 Oct 2026): publication every Monday; if Monday is not a US business day, the next business day; allowed delay 1 business day; rebalance 2026-12-31; selection 2027-05-31 |
| Data Center Full Cycle Index levels and constituents | Catalog refresh (feeds v0.4.1 universe) | 2026-11-30 | due in 6 days | Approved (owner, 18 Oct 2026): publication every Monday; if Monday is not a US business day, the next business day; allowed delay 1 business day; rebalance 2026-12-31; selection 2027-05-31 |
| Mining Cost Standard (Q3 2026) | Interim additions: CleanSpark (10-K FY2026), Cango and BitFuFu (Q3 2026 results 6-K) within one business day of each filing | 2026-11-24 | due in 0 days | Q3 2026 data cut published 2026-11-15 from the 10-Q/6-K filings of 2–12 Nov 2026 (12 of 15 companies; CLSK, CANG, FUFU added as interim updates when they file). Next full re-base 28 Feb 2027. |
| Mining Cost Standard (Q3 2026) | Quarterly re-base on the approved calendar: the latest filing of each company on one data cut (FY2026 10-K where filed, otherwise the Q3 10-Q) | 2027-02-28 | due in 96 days | Q3 2026 data cut published 2026-11-15 from the 10-Q/6-K filings of 2–12 Nov 2026 (12 of 15 companies; CLSK, CANG, FUFU added as interim updates when they file). Next full re-base 28 Feb 2027. |
| Mining Capacity Standard (value per megawatt) | Capacity (MW) re-base from Q3 filings and decks for nine companies; CleanSpark FY2026 10-K balance sheet | 2026-11-30 | due in 6 days | Release 1.1 published 2026-11-15 (market data and Q3 balance sheets); the dashboard rolls daily on top of it (tools/mining_daily_roll.py, interim inputs from filings in src/data/mining/interim_inputs.csv). Next re-base: capacity (MW) on 2026-11-30. |
| Mining Capacity Standard (value per megawatt) | Quarterly re-base on the approved calendar: market data, balance sheets and capacity (MW) from the latest filing of each company on one data cut (FY2026 10-K where filed) | 2027-02-28 | due in 96 days | Release 1.1 published 2026-11-15 (market data and Q3 balance sheets); the dashboard rolls daily on top of it (tools/mining_daily_roll.py, interim inputs from filings in src/data/mining/interim_inputs.csv). Next re-base: capacity (MW) on 2026-11-30. |
| Mining NAV Standard (v1.2 re-anchoring) | Q3 2026 refresh (new balance sheets; ARBK and BTCT rechecked) | 2026-11-30 | due in 6 days | Moved from 2026-11-16 to 2026-11-30 to run after the Q3 balance-sheet refresh of the Capacity Standard (published 2026-11-15, release 1.1). |
| Mining NAV Standard (v1.2 re-anchoring) | Quarterly re-base on the approved calendar: the latest balance sheet of each company on one data cut (FY2026 10-K where filed, otherwise the Q3 10-Q) | 2027-02-28 | due in 96 days | Moved from 2026-11-16 to 2026-11-30 to run after the Q3 balance-sheet refresh of the Capacity Standard (published 2026-11-15, release 1.1). |
| Mining Companies Catalog | Quarterly catalog refresh | 2026-11-30 | due in 6 days | Quarterly calendar documented in the methodology |
| CleanSpark fair value model (withdrawn 20 Nov 2026) | No approved date | v4.1 (15 Nov 2026) withdrawn on 20 Nov 2026 on the owner's instruction to keep the latest valuation; CleanSpark is valued in the valuation of miners and AI data-centre landlords (edition 0.9.3). The v4.1 files stay in the library as an archive. | ||
| ASIC Hashrate Price Standard | Monthly update (November data; October offer layer if the quote archive is available) | 2026-12-01 | due in 7 days | Original date 2026-11-02 was missed; catch-up run on 2026-11-23: SEC filings screened to 2026-11-23, no admissible Oct–Nov 2026 deal, offer layer for 2026-10/2026-11 on HOLD (class-C quote archive and builder not available to the update process). The series still ends at September 2026. |
| Equity Valuation & Publication Standard | No approved date | Not applicable (rules document). Standard v1.0 approved by the owner on 18 Oct 2026 | ||
| Company directory (catalog methodology 1.3) | Catalog refresh | 2026-11-30 | due in 6 days | Methodology 1.3 (owner instruction, 15 Nov 2026): market fields roll daily via tools/catalog_market_roll.py; share counts, net debt and TTM financials refresh on the quarterly calendar (next 2026-11-30). |
| Net Debt Calculation Standard | Quarterly refresh on new Q3/FY filings; IFRS issuers by manual input file | 2027-02-28 | due in 96 days | Release 1.0 published 2026-11-16; net debt shown in the cards of grade A/B issuers (45 cards). |
| Revenue Classification Standard | Alignment of the catalog thematic share and the card AI/HPC share with the classes; CleanSpark, Canaan, BitFuFu and Cango moved to Q3 2026 when filed | 2026-11-30 | due in 6 days | Release 1.0 published 2026-11-18; cards and catalog still use their own share definitions until 30 Nov. |
| Market Data and Calculation Inputs Standard | Quarterly re-base of all bases on one data cut, the first under this standard | 2026-11-30 | due in 6 days | Version 1.0 of 2026-11-21: sources, daily cycle, acceptance rules for a close, filed figures, frozen calculation inputs, append-only history with a public corrections log, checks MD-1 to MD-7 before every build. |
| Valuation of miners and AI data-centre landlords | Quarterly re-cut (data cut 30 Nov 2026; includes the CleanSpark FY2026 10-K if filed) | 2026-11-30 | due in 6 days | Edition 0.9.6 of 2026-11-21: standard 0.9.6 (chance of a lease for powered sites calibrated on observed leasing, rule B4.5; cost to rebuild a mining site from filed build costs, rule B5.4), register r7 (nineteen leases and GPU contracts linked to their sec.gov filings, four corrected from the filings, HIVE's second GPU contract added); approved by the owner on 21 Nov 2026. Next re-cut 30 Nov 2026 or earlier on triggers R1-R5. |
| Data Center Full Cycle Index: daily official level | No approved date | Automated (GitHub Actions); fails closed: nothing is published when prices are missing, a daily move exceeds 25% or weights do not sum to 1 | ||
| SEC filings feed: priority companies | No approved date | Automated (GitHub Actions); fails closed: nothing is committed when the SEC feed is unavailable | ||
Backtest, base date and live calculation.
Hypothetical backtest
2015-06-30 to 2026-10-09 (hypothetical, pre-registered run, calculated 2026-10-10).
Base date
2025-06-30 = 1,000. The “official” series from the base date to 2026-10-09 is a retrospective run of the pre-registered rules, not a live record (2025-06-30 to 2026-10-09 (official-rules series, simulated retrospectively)).
Live calculation
From 2026-10-12: 5 sessions to 2026-10-16. Calculation, checking and publication are separate events: levels are daily observations, the check ran once for the release, and the release is published on the owner’s schedule (every Monday; if Monday is not a US business day, the next business day; allowed delay one business day — approved 18 Oct 2026).
Warnings, limitations, files.
Data Center Full Cycle Index levels and constituents · READY
Material warnings and open points
- Hypothetical backtest: retrospective universe, survivorship and selection bias apply
- Prices are Yahoo Finance research snapshot, not licensed exchange data
- Exposure estimates are analyst estimates, not company disclosures (5 assumed pure plays, 8 gap candidates)
- Re-run on refreshed snapshot shifts the 2026-10-16 level by +0.08% and target weights by up to 0.04 pp
- Layer of GE Vernova and Bloom Energy: Layer 1 (Power) in the index; catalog 1.2 had Layer 2 (Thermal & Electrical); the site shows Layer 1, pending the 30 Nov 2026 catalog refresh
- FIX and Lite-On were added to the company directory from the index (identity and index data only; market metrics blank until the refresh)
- universe_v0_3.json: checksums.txt of the publication package listed a non-existent hash; corrected on 18 Oct 2026 to 46e17b90… (the only version in the project, equal to the factsheet frozen-run hash)
Limitations
- Research index, not a licensed benchmark
- Annual, monthly and bootstrap tables are not rolled forward from the frozen run (to 2026-10-09)
- Weekly releases for Mondays 2026-10-19 to 2026-11-09 were not published; automated weekly publication started 2026-11-15.
Basis of dates
- calculation date: weekly_release.py run date (UTC)
- check date: weekly_release.py run date (UTC)
- release date: weekly_release.py run date (UTC)
- site publication date: commit date; the server agent publishes main within minutes
Files and SHA-256
| caidc_levels_daily.csv | f380a8d18760ba00b4c410c8070b4038bbd342727cbf27404036298548b97cf2 |
| caidc_constituents.csv | 348fa501bf2841fab8a1adf5885afeeaa939d0ec4d50095dbbefd40826709886 |
| caidc_current_composition.csv | 75f8e7a3d91326e72c5cc5be22ffb908d5b8cadf638374578cffb2e3648998d2 |
| caidc_composition_history.csv | 6a87ca21dd702596b2895ac6cf62d64d61b7d942c09069fcc1f2e6cb23a50f87 |
| caidc_factsheet.json | 43ac6c47c09a02588cce104e49419bd15f112c1434897eb8c957c0f19b2511ed |
| caidc_validation_log_2026-10-16.json | b74d4a134bb76c8df4c45a91496267ba8404c27d0521a738faa6f98e79d6c076 |
Mining Cost Standard (Q3 2026) · READY · 3 WARN
Material warnings and open points
- Realized price (rev ÷ BTC) vs reported avg price — MARA Holdings, Inc. Q1_2026
- L0 Direct NET/BTC vs reported cost-to-mine ex-D&A — Core Scientific, Inc. Q3_2025
- Pending review: FUFU 6-K of 2026-11-20 — earnings release: new inputs by 2026-11-23 — production, energy and cost-of-revenue lines: recalculate the company's cost per BTC; full re-base on the calendar date 2027-02-28
Limitations
- Four headline miners of fifteen (CLSK, CANG, FUFU pending; IREN and CIFR below the 500 BTC threshold)
- MARA cash operating cost above realized price in Q3 2026
- IREN statements rounded to $1m by the issuer from Q1 FY2027
Basis of dates
- calculation date: validation log run (UTC)
- check date: validation log 'Validated at'
- release date: release document
- site publication date: first deployment (merge of the release PR; corrected by the monthly reconciliation if merged later)
Files and SHA-256
| mining-cost-standard-v1.0-2026Q3.md | 7002318f41efb18edfa156223ae38d03348c171140920c3b2a273a47fb8f6967 |
| mining-cost-v1.0-validation-log-2026-11-15.md | a66a59133063d4928367999b7584c277fd45396677d7c6d140897ff882a15e8a |
| mining_cost_v1.0_inputs_2026Q3.json | 1fcfd65b9fa8847040848b09f5d638765993aec1544be967305ee6d043098c6b |
| mining_cost_engine.py | 042a228adfb03d7fb4ff9751ab40600e1e2ab9f1c7bd7fd6e5ff647f439ba8ba |
| cost_common.py | da600da902f7759b0b3618503f8ffcfc31e78ab1ca36cb4b0b20079defaf2c64 |
| normalize_v2.py | 688af6e6e20641e19d75974ef647e4c3c4114e0dff95ae0f49e66ecdd0514153 |
| build_std.py | 0afd31ca8cb414be6ec029f50d6463fe1c36d0e60d86679f15f6f3e88e6c31d7 |
| overlay_std.py | f69fad8909163f4e7b0690b4d86a1566a92b98de98ffcd7e57843c7fcb2eb3a6 |
| validate_cost_model.py | a6345acafaee1c7f1316028ff5c2d0317724067b19b1da37bd316a40ac6d4afd |
| make_public_summary.py | 398656f90d5ceb2ab4bfb084da2dffacc62c0367ae7eb538933ab4d717bff06c |
| make_charts.py | d39470a3e66e7ff6083b8289c337287b19f571fa8138498c406fa9d1ef7e809e |
Mining Capacity Standard (value per megawatt) · READY · 7 WARN
Material warnings and open points
- Interim update BTDR, MARA, IREN, RIOT, CORZ, CIFR, HIVE, WULF, HUT 2026-11-15 from 10-Q / 6-K Q3 2026: 37 rows in interim_inputs.csv (MW from the Q3 reports, post-quarter BTC sales, repayments and share issues, corrections of release 1.1: BTDR bitcoin 4,631 -> 47, HUT restricted short-term investments $2,838.5m added to restricted cash); daily-roll median infrastructure value per committed MW $3.49m (release $3.62m)
- CleanSpark balance sheet carried at 30 Jun 2026 (fiscal-year 10-K pending): stale by the 120-day rule
- Bitdeer and Core Scientific flagged confidence C (aggregate balance-sheet data / IT-MW basis)
- Capacity (MW) carried from v1.0 for nine of ten companies until the 30 Nov re-base
- Pro forma events applied (CIFR, IREN, CLSK)
- Filings watch 2026-11-15: WULF 401 MW HPC lease (Anthropic, Google backstop, 20y) and CIFR $850M 2032 convertible to be reflected in the 30 Nov re-base; see src/data/filings/events_review.md
- Freshness (auto): balance sheets: 147 days old (limit 120) — 10 companies; oldest 2026-06-30; over the limit: CLSK
Limitations
- Committed capacity as disclosed by issuers
- Ten companies only
Basis of dates
- calculation date: tools/capacity_refresh.py run, 2026-11-15
- check date: engine recompute and QA run, 2026-11-15
- release date: release document
- site publication date: first deployment
Files and SHA-256
| mining-capacity-standard-v1.0-2026-10-15.md | b485e72513bc1ac30d2c7ec7cbe29a0ef2dc64495f7ef1b6fcec2f7a18daf5b9 |
| mining-capacity-v1.0-validation-log-2026-10-17.md | 6adaa14220c1befb33ee58024a1ccb5571a100cc897c50f452bb0aef8b612218 |
| mining_capacity_v1.1_inputs_2026-11-13.json | 8238f9abcc40d0981d8ed59772011f8e2c69e4a26d3a312a43da6a9e1abbf728 |
| mining_capacity_v1.0_inputs_2026-10-15.json | 4a9b01e54097a5f2e385c9fd0620cb4aef1074d88df9a5bf2150c595155cb5d4 |
| capacity_common.py | b395d54eb22b61b1eb68164f32495ed21224b41c523d626dc7cae270ebcc8566 |
| capacity_engine.py | 7a36187092773b01cd603cdf9c585f99b3ffb2f8f2b7bfd0edb59f97ea13cd35 |
| validate_capacity.py | f22df530dc60ee1b954084ce9d320659643e2c1631a9fce0998d20ae5cad61a8 |
| build_capacity_workbook.py | 503a0ee4e9db39af7e35ddf1e8d33ff7b2b7b2b1c011a7ec16131e362bf3c853 |
Mining NAV Standard (v1.2 re-anchoring) · READY · 16 WARN
Material warnings and open points
- Interim update MARA, RIOT, CORZ, CIFR, HUT, ABTC, WULF, IREN, HIVE, KEEL, DGXX 2026-11-15 from 10-Q Q3 2026 (balance sheets 30 Sep 2026; prices, BTC spot and ASIC level still of the 15 Oct 2026 cut)
- Interim update PWCM 2026-11-16 from 8-K 2.02 Q3 2026 results release (EX-99.1; balance sheet 30 Sep 2026, 10-Q not yet filed — confirm when filed): NAV-T per diluted share 6.245 to 5.656
- BTDR held at 30 Jun 2026: the Q3 6-K (2026-11-10) has no notes (BTC units, PP&E split, convertible carrying n/d); RIOT J/TH 20.2 carried from 31 Mar 2026
- SLNH and VIP held at 30 Jun 2026 until their Q3 10-Q (due 16 Nov): SLNH's October Generate payoff (8-K of 26 Oct) does not state the cash paid; VIP's 30 Sep bitcoin is disclosed as a value only ($5.4m; 103 BTC of 30 Jun kept)
- ARBK and BTCT: latest balance sheet 31 Dec 2025, rechecked on EDGAR 15 Nov 2026 (ARBK no filing since 1 Oct; BTCT 6-K of 29 Oct without statements), STALE stays; FUFU, CANG, SLNH, VIP: Q3 statements not filed by 16 Nov (SLNH and VIP 10-Q due 16 Nov)
- ASIC price level K3 $7.05/TH is THIN: 8 quotes, one seller
- Deal curve is flatter than 2026 class dispersion; NAV-M for efficient fleets likely understated
- NAV-M falls 10% to 54% vs v1.1 for seven miners (CLSK 1.855 to 0.848)
- 21 WARN items in the v1.1 log
- Pending review: PWCM 10-Q of 2026-11-16 — quarterly or annual report: new inputs by 2026-11-17 — balance sheet (cash, bitcoin held, debt, share count): recalculate NAV per share; full re-base on the calendar date 2026-11-30
- Pending review: SLNH 8-K 2.02,7.01,9.01 of 2026-11-16 — earnings release: new inputs by 2026-11-17 — balance sheet (cash, bitcoin held, debt, share count): recalculate NAV per share; full re-base on the calendar date 2026-11-30
- Pending review: SLNH 10-Q of 2026-11-16 — quarterly or annual report: new inputs by 2026-11-17 — balance sheet (cash, bitcoin held, debt, share count): recalculate NAV per share; full re-base on the calendar date 2026-11-30
- Pending review: VIP 10-Q of 2026-11-16 — quarterly or annual report: new inputs by 2026-11-17 — balance sheet (cash, bitcoin held, debt, share count): recalculate NAV per share; full re-base on the calendar date 2026-11-30
- Pending review: 4 more open items in src/data/filings/impact_log.csv
- Freshness (auto): balance sheets: 328 days old (limit 120) — 21 companies; oldest 2025-12-31; over the limit: ARBK, BTCT, BTDR, CANG, CLSK, DMGI, FUFU, SLNH and 1 more
- Freshness (auto): bitcoin reserve counts: 328 days old (limit 45) — 21 companies; oldest 2025-12-31; over the limit: ARBK, BTCT, CANG, DMGI, SLNH, VIP, BTDR, ABTC and 12 more
Limitations
- NAV-M is a conservative figure, not a point estimate
- NAV-M only where machines can be separated from infrastructure
Basis of dates
- calculation date: interim revision run 2026-11-16 (mining_nav_interim.py, PWCM); earlier packages 2026-11-15; v1.2 base 2026-10-17
- check date: interim validation log 2026-11-16
- release date: interim revision files dated 2026-11-16
- site publication date: interim revision deployed 2026-11-16 (first deployment of v1.2: 2026-10-18)
Files and SHA-256
| mining-nav-standard-v1.0-2026-10-17.md | 3e696af9c6325ddd5dd4b133bcab45e4cda32ff786b44031e40a481f73555cac |
| mining-nav-v1.1-asic-deal-curve-2026-10-17.md | cf4638f21f100e6fc423162da96a0e6317da3ae518a48614270d1ae49c31e2d6 |
| mining-nav-v1.0-validation-log-2026-10-16.md | c4f5126d231a2d164f65bc205a93ac28e428770bfd2e05d203b767ad322f2c54 |
| mining-nav-v1.1-validation-log-2026-10-17.md | f77b1c1b44e22b69a8570416568adfaf5d76f3143021d32cebb1995d9e6d65a9 |
| mining_nav_v1.0_inputs_2026-10-15.json | f44e606c5af8c7f42c3d9d53ca935e36c05ad659bdac696a5a4861fee9bb5cd6 |
| mining_nav_v1.1_inputs_2026-10-15.json | 0fba2fc9f0991ecd585f2210ff4f8e6a2c4a9414f895417c7490e1d073e25a54 |
| asic_deals_panel_2026-10-17.csv | d15cd443a00790eccc6c94841c46105a023c134263fcdcdc86aa07ad5b97d790 |
| mining_nav_engine.py | a307549563136dd435e5b70cbb7812751472ff7744abc7afc3a90e1914f1e720 |
| nav_common.py | 794e877e0f473f2def3db7614a7e1cf5543ef18cca816cf77943c9193651870b |
| asic_deals.py | 957fa4ceefc438b0ad0924f0f7969955f15ad21455fad45062ac1b08c2eb7e95 |
| merge_deal_panel.py | fd5dd3cf12ebce12e5fc4ca36ae6269d8b453fc66bb115ffc5c60a6864ff2490 |
| mining_nav_v12.py | 543560b8ad709dbc73f960b858440f4d2a3dd1571d2d0a1c55c695864d3eeed3 |
| mining_nav_v1.2_results_2026-10-17.json | f5378e4d05208245700a8e7c7de4d1db8a08842a9029770a3c2a2e001049fe02 |
| mining-nav-v1.2-validation-log-2026-10-17.md | d7feafc9294183b07e61b3d7cc146f9f7e4ddce5d5fa2e1a3c392e8b3cd1be54 |
| asic_hashrate_price_ipmk_input_k3_v1.0_2026-10-17.csv | ad657e418416f6346150f1d9ea4e05e2d61553e38cef99ebe2e52a3746e6ae7b |
| mining_nav_v1.2_inputs_2026-11-15.json | a8b240d8dc1fc6126e37901b5733f8b15207a98b1cbd7333e650f90750910ef7 |
| mining_nav_v1.2_results_2026-11-15.json | 747de17b6c4114dde1ac60bcb04344bed7c779d1e24262b643d96fa53062d03b |
| mining_nav_interim.py | 7fa3935660edc6ebe4501ff5322f47526e3b2c2953a1e4bfc75319821f0b795c |
| validate_nav_interim.py | 478d8ef92fb6a6e642cacfe68e6cc6991e6805599d74fc34d0f238e14e8785c0 |
| mining-nav-v1.2-interim-validation-log-2026-11-15.md | 2dc33e5931df57fa8dc0e1f505a756023771b062361fefabc61c8f110d1bf755 |
| mining_nav_v1.2_inputs_2026-11-15-r2.json | b88aec84e154b61701fb7640491f6aa130883abdf5f634237d229844713c0723 |
| mining_nav_v1.2_results_2026-11-15-r2.json | 1449f2cc2475a92c7b86846bfeb7d78c88a290aa6c156d660e5d9e0c6ec00a34 |
| mining-nav-v1.2-interim-validation-log-2026-11-15-r2.md | 6f709ca455c240d6dd51f144753d11b7ed5c1982d33ea634a4eeb3bc7c1225ae |
| mining_nav_v1.2_inputs_2026-11-16.json | 2abf2a09670fba902b7a7c8a2ae93be0e9a90c2ec11358ddb2930857f1433ef6 |
| mining_nav_v1.2_results_2026-11-16.json | 5734f1350780fd3f51ba2ed12606720111002b3b29ef8c1d5aefaf3a8fdbe6c8 |
| mining-nav-v1.2-interim-validation-log-2026-11-16.md | f8927b76cf7b7e558143f1421d2a5b86df4809c0e3a33caebf20892983a9aca1 |
Mining Companies Catalog · READY · 1 WARN
Material warnings and open points
- 2 stale financial rows (info)
Limitations
- 34-security register
Basis of dates
- calculation date: validation log 18:26 UTC
- check date: validation log
- release date: release document
- site publication date: first deployment
Files and SHA-256
| mining-catalog-v1_1-release-2026-10-17.md | f900dc38f1416dceb3ac2022fbcd9a3959ca015e1478957a60d923a045c833ee |
| mining-catalog-v1_1-validation-log-2026-10-17.md | add33b0ed4cb7f038ff1c347e1fa21fcc3c88c3614381de6c7fd8f2cb509910e |
| mining_catalog_v1_1_data_2026-10-17.json | 4a7494123c579b2bdbc4182646a6192c7f152b623a5ad3bd35a48af6aa2d658e |
| mining_catalog_v1_1_core_2026-10-17.csv | 7587662cc4491844ff2fa69b144df5369eba72a0113ccfb69b54a9843d22c476 |
| mining_exposure_register_v1_0_2026-10-17.csv | b60a4613947d8a8c631f06fae9c1220c40342c324ba0594b83142af6a262b2be |
| catalog_data_v1_1.py | f7dafe84490d6d2753dd7cb70473f96853612bbbb154c57b3746f70a0e53bef0 |
| engine_v1_1.py | 7c907c6ddc72663bae1f82b28d453294ffcb9d00762d1ae36b1173765f6894b0 |
| build_mining_catalog_v1_1.py | 178758b60a336ccd1bfe94f56fba954b51b02ecc0296d35ce1a85a93d05b9f8d |
| validate_mining_catalog_v1_1.py | c4455a9fb629f75dbdb8092c5ed5d5a5ff35cace714e89d5f459cb7f68d744ab |
| write_public_summary.py | 61f646d444f07b9e587a8756441cf61551150cf5b63efedcb21be628bc6c7275 |
CleanSpark fair value model (withdrawn 20 Nov 2026) · WITHDRAWN — superseded by the valuation of miners and AI data-centre landlords, edition 0.9.3 · 8 WARN
Material warnings and open points
- Withdrawn: the v4.1 values (Base $0.73, weighted $2.87 at 13 Nov 2026) are no longer current and differ in method (after-tax mining DCF) from the valuation that replaces them
- Balance sheet 30 Jun 2026 is 136 days old at the 13 Nov cut (STALE by the 120-day rule) until the FY2026 10-K
- Market-data revision only: scenario assumptions, balance sheet and bitcoin held are those of v4.0
- Hashprice computed from mempool.space block rewards and difficulty (v4.0 used IonGrid; the same rule gives $39.96 for 13 Oct against $39.80)
- Option premiums entered without live bid/ask
- Post-June cash/capex reconciliation incomplete: September BTC sales not added without a full cash bridge
- Normalized cash taxes: FY2026 NOL growth and bonus-eligible capex not confirmed
- Fair value is assumption-driven; see sensitivities
Limitations
- Fair value range, not a target price
Basis of dates
- calculation date: engine 4.1 run, validation log v4.1
- check date: validation log v4.1 (v4.0 reproduction, invariants)
- release date: release commit
- site publication date: commit date; the server publishes main within ~5 minutes
Files and SHA-256
| clsk-v4.1-validation-log-2026-11-15.md | b457bff6617da823098f4b102e2bee5278a8e65cfd2d5a56a001542aa11bc055 |
| clsk_v4.1_inputs_full_2026-11-13.json | 8cf15489569b3688788976b9306bcd6e246c2c299ee53a3e93b4a5150df567d8 |
| clsk_v4.1_results_2026-11-13.json | aa0b384f8005cd6d67d843b288897f5a284e12263ae9ac9abb70ccb5145c83cb |
| clsk_valuation_engine_v4_1.py | ba4b047a3209ab77c0a35ee82e974804171457388451a56e15a9b9a4fa2aeec9 |
| clsk_v4.0_inputs_full_2026-10-13.json | c053d3a2af17ad6c3b72e279c0c822f3f7e5e228bb572adb8aa620f6c9ca4fed |
| clsk-valuation-v4.0-audit-2026-10-16.md | 545deddf5377b189530f29afad2e986f591bac976f40dd284af5a45637edcb51 |
| clsk-v4.0-validation-log-2026-10-16.md | fa547b40565bf9408739c5c3fe4e787e5f7e800e4c3d8c5635f6875ceb40a3a1 |
| clsk_v4.0_inputs_2026-10-13.json | c1843c234b5a6337ce5e8582927ab7c8f461a27bb68613332fe1e0b4f6760499 |
| clsk_valuation_engine.py | 60f574858d7fbfb56b578e50ef16320a80adcde4cccee663c8396a87f6b90ed6 |
| hashflops-valuation-standard-v1.0.md | 66ef5b6dbc1cb43e1878275bc15abdb137fe0c2d5a92251b06139662adc351f2 |
ASIC Hashrate Price Standard · READY with WARN · 6 WARN
Material warnings and open points
- October–November 2026 offer layer on HOLD: class-C quote archive and builder not available to the update process; series ends at 2026-09
- No admissible class-A deal priced Oct–Nov 2026; P49 (PowerCompute S21++, ~$7.31/TH) outside the series pending check
- K3 extended value rests on one class-C seller in 24 of 33 months (THIN)
- Strict contour has values in 9 of 33 months; last 2025-07
- No class-C seller has been asked for consent
- Canaan 20-F ASP table not re-read in this revision
Limitations
- Sample is thin: 24 of 48 transactions admitted
- Class C quote sheet is not redistributed
Basis of dates
- calculation date: validation log run 18:45 UTC
- check date: update log 2026-11-23 (strict-contour recompute 920 checks, IPMK 165 checks, 0 mismatches); revision 3.1 validation log 2026-10-17
- release date: update files dated 2026-11-23 (transactions addendum and update log)
- site publication date: update deployed 2026-11-23 (first deployment 2026-10-18)
Files and SHA-256
| asic_hashrate_price_monthly_v1.0_2026-10-17.csv | 6ae2654f3e00b64632c874671426612a83ffb211f67088f0fc72f2ced91869e2 |
| asic_hashrate_price_ipmk_input_k3_v1.0_2026-10-17.csv | ad657e418416f6346150f1d9ea4e05e2d61553e38cef99ebe2e52a3746e6ae7b |
| asic_transactions_public_v1.0_2026-10-17.csv | 7691d77fab86a551ee3b16aa16c09cf4e627bc3b84715307204b6bc5d1ece154 |
| asic_models_reference_v1.0_2026-10-17.csv | 98c7da1c1deab03b9824555fa336f48914c2039e040e8634a23f0267dfa5e34c |
| asic_manufacturer_asp_reference_v1.0_2026-10-17.csv | e2e523c8579dec4bc5f709a3fbbd8bcf87f01ec43d4713ccafbe18c9b71eea61 |
| asic_secondary_market_reference_v1.0_2026-10-17.csv | f613542465b9926ecf678a3f672cbebd58e8ff0aac43ecaa5511317873ea9d0d |
| asic_offer_sources_v1.0_2026-10-17.csv | 978bc03b730ba2006de8d4dc40fe8d3d3a5ff9335a15e330b260b52d3b3a2de8 |
| asic_base_v3.1_vs_nav_panel_v1.1_reconciliation_2026-10-17.csv | 834c5a00dd8f51322a7a5b339bd80c33efbf4eeb7242a57e5e2052b8ee083489 |
| asic-base-v3.1-vs-nav-panel-v1.1-reconciliation-2026-10-17.md | 755fed577458ba7fd46d1ec090f8a0df3ca8407be946347084f79dbb50154fcb |
| asic-hashrate-price-v1.0-validation-log-2026-10-17.md | 06b87e4bf48adb506ff9d1b6fb7ab6e8d85749be52190e4a9a7757a1358c08f0 |
Equity Valuation & Publication Standard · N/A (rules document)
Limitations
- Not reviewed by a lawyer
Basis of dates
- release date: release document
- site publication date: first deployment
Files and SHA-256
| hashflops-valuation-standard-v1.0.md | 66ef5b6dbc1cb43e1878275bc15abdb137fe0c2d5a92251b06139662adc351f2 |
Company directory (catalog methodology 1.3) · READY with REVIEW flags · 3 WARN
Material warnings and open points
- 1 issuer without ttm_end, 2 without EBITDA (shown blank, not zero)
- FIX and Lite-On (2301) added from the Data Center Full Cycle Index in release 2.4: blank market data, REVIEW; GE Vernova and Bloom Energy shown in Layer 1 (Power) (catalog 1.2 value kept on their pages)
- Market metrics roll with the latest close; vendor fundamentals are a dated, rounded snapshot, not a licensed dataset
Limitations
- Between quarterly refreshes shares, net debt and TTM financials are held fixed: market cap and EV move with price and FX only (corporate actions can lag)
- Kioxia (285A) is not rolled: its price fell 84% against the October snapshot, consistent with the announced 3-for-1 stock split plus a market move; share count is to be re-based at the 30 Nov refresh
- Currencies outside the ECB set (TWD) are converted with the daily Yahoo cross rate
Basis of dates
- release date: catalog package date
- site publication date: first deployment
- calculation date: catalog market roll / refresh run date (UTC)
- check date: same run (QA before commit)
Files and SHA-256
| companies.csv | 1d2aa63b86ba8f2d6c9a90205ae8bd71245cad1af80c98b615a45d7f104b1222 |
| companies.json | 577e5c4523911459e6730bf4038dd0de5e2560a9ee7efcc2b39bb606a14b6858 |
Net Debt Calculation Standard · READY · 3 WARN
Material warnings and open points
- Machine extraction covers US-GAAP issuers only; 50 rows not computed (IFRS or non-US filers)
- 13 issuers incomplete (debt or cash tag missing at the date); no figure published for them
- Carrying amounts used where principal is not tagged; grade B/C rows carry caveats in the notes column
Limitations
- US-GAAP extraction only
- Carrying amounts for most debt
- Not investment advice
Basis of dates
- calculation date: tools/net_debt.py run, 2026-11-16
- check date: build and QA run, 2026-11-16
- release date: release document
- site publication date: first deployment
Files and SHA-256
| net_debt.py | 32814b38894a73b1aada34dfc2eda12ea73a0af3cc961057239ee8918ff6429e |
| net_debt_v1.0.1_2026-11-21.csv | 24c307b2b25d4fa8d8d538d4a4a52da5561d2a181897d5a11604a644f2feda9c |
Revenue Classification Standard · READY · 3 WARN
Material warnings and open points
- Nineteen issuers; seven are on the latest filed period (CLSK, CANG, FUFU, CAN, SLNH, DMGI, OLB); SOS and VIP not covered
- Hut 8 cloud revenue is a derived residual of a combined segment line
- No blind second-reader review in v1.0; classes assigned from filings, not contracts
Limitations
- Nineteen issuers, one period each
- Pass-through quantified only where disclosed
Basis of dates
- calculation date: shares computed from the segment inputs of the Mining Cost Standard, 2026-11-18
- check date: totals reconciled to filings, 2026-11-18
- release date: release document
- site publication date: first deployment
Files and SHA-256
| revenue_classes_v1.0_2026-11-18.csv | 1f7f4eee3de7c9cf9b02b1944533627632cd220732bb337f3f9644abf3b0dcd1 |
Market Data and Calculation Inputs Standard · READY · 1 WARN
Material warnings and open points
- One correction recorded: the 19 Nov 2026 row of the market marks history had been overwritten by the 01:00 UTC run of 21 Nov 2026 and was restored (see /data/mining/corrections.csv)
Limitations
- The price feed is a research feed; prices are used to compute and are not redistributed as a price file
- Companies that do not file on EDGAR are checked weekly
- Not investment advice
Basis of dates
- calculation date: tools/market_data_check.py run against the repository, 2026-11-21
- check date: build and QA run, 2026-11-21
- release date: owner approval, 2026-11-21
- site publication date: merge to main; the server publishes main within ~5 minutes
Files and SHA-256
| market_data_check.py | 407ebe24e52d624d11846edbbe63f0751112be41c8d990ea229d1b9269ef7f5b |
Valuation of miners and AI data-centre landlords · READY with WARN · 8 WARN
Material warnings and open points
- One signed lease rests on our own estimate of its value (Riot's AMD expansion: megawatts and dates filed, value not disclosed)
- IREN's August 2026 GPU cloud contract is not counted: its value is not disclosed (contracted revenue $20.3bn against $15.9bn counted)
- Six capacity figures are our estimates (company total less the sites it lists)
- CleanSpark balance sheet dated 30 Jun 2026 and bitcoin count 30 Sep 2026 (older than 120 and 45 days); Core Scientific capacity counted in MW of server load
- HIVE, MARA and IREN are a partial view, not compared with the share price; Cipher's mining sites have no machine value and IREN's mining sites exceed its installed fleet
- The chance of a lease for the pipeline and the calibration of the chances and of the cost to rebuild a mining site are our assumptions, reviewed for version 1.0
- Values are before tax: exception VX-2026-02 to the equity valuation standard (three tax regimes)
- Freshness (auto): CleanSpark balance sheet in the valuation: 147 days old (limit 120) — refreshes with the FY2026 10-K (due around 30 Nov 2026; recalculation within 10 business days)
Limitations
- Values before tax; convertible notes at face value
- GPU fleet of GPU cloud companies outside the listed contracts not valued
- Mining sites at the cost to rebuild them; operating sites sold in 2026 for $0.4-0.7m per MW including machines
Basis of dates
- calculation date: engine and formula workbook run (bases/valuation_v0_9, run_all.sh), 2026-11-21
- check date: validator (verdict READY) and gate check.py G1-G10, 2026-11-21
- release date: owner approval, 2026-11-21
- site publication date: merge to main; the server publishes main within ~5 minutes
Files and SHA-256
| inputs_2026-11-18.json | 62d60f51072eb4a21595ed42410342b87914b74cc3781f2fcc6cfa9bde06e63d |
| cvs_results_2026-11-18.json | e5c4681b459d0594566a21a685562c68bf0981ca6e70cd69ae8988766923e39d |
| page_data.json | b9a87b617e05a14fe1fcfeb13e262bc2afbd3985370b6cdb2c35fa8ccd94754e |
| block_review_2026-11-18.json | bead8169898bfc43a2d23e3b1e9eb0326c3de4125c829ec279f73f7c65235872 |
| datapackage.json | 7160706dcfe73e4c1c8e3717968bd7cab94c30f6ccd4c0a3e4c2dc614385dcae |
| valuation_reproduction.zip | b7fcabce7b0004e77ce70a351bae424c06a3ea7fb1170864bee4bd8923fba130 |
Data Center Full Cycle Index: daily official level · READY · 3 WARN
Material warnings and open points
- Prices are a Yahoo Finance research snapshot, not licensed exchange data
- Hypothetical history before 2026-10-12; retrospective universe
- Levels of 16-19 Nov 2026 restated on 20 Nov 2026: closing prices missing from the feed had been carried forward as zero moves (official 19 Nov level 1,922.44 before, 1,879.32 after)
Limitations
- Research index, not a licensed benchmark
- No primary-source price reconciliation
Basis of dates
- calculation date: daily_update.py run date (UTC)
- check date: same run (checks execute before commit)
- release date: commit date
- site publication date: commit date; the server publishes within ~5 minutes
Files and SHA-256
| caidc_levels_daily.csv | f380a8d18760ba00b4c410c8070b4038bbd342727cbf27404036298548b97cf2 |
| caidc_current_composition.csv | 75f8e7a3d91326e72c5cc5be22ffb908d5b8cadf638374578cffb2e3648998d2 |
| live_state.json | 57f3e7c380c6054d39ff536596ebf8074d02d4756f2c505d9883c17fc9fb3fa1 |
SEC filings feed: priority companies · READY · 1 WARN
Material warnings and open points
- 44 issuers without EDGAR coverage (22 tier 1) are checked manually against exchange calendars
Limitations
- Labels and first impact verdicts come from EDGAR metadata; the document is read only for rows that can move a base (business days)
- Insider trade forms (3, 4, 5) and 13F holdings reports are not logged
- Expected dates are estimates (same event one year earlier + 364 days), not confirmed dates
Basis of dates
- calculation date: filings_watch.py run date (UTC)
- check date: same run (every issuer feed fetched; run aborts if more than 30% fail)
- release date: commit date
- site publication date: commit date; the server publishes main within ~5 minutes
Files and SHA-256
| filings_log.csv | 50f1883e10b03fe53b4c067f74db9e8155d3c94ec898eae64ce6b3d2d4691f69 |
| calendar.csv | 035075e033e367e4a96cfc5b5db52e495a7ca068d45c9ca4086e3228cdbf436a |
Machine-readable: releases.json · releases.csv · releases_files_sha256.csv.