DIGITAL INFRASTRUCTURE / INVESTMENT INTELLIGENCERESEARCH PLATFORM · DATA CENTER FULL CYCLE INDEX · DATA AS OF 23 NOV 2026 · PUBLICATION LOG
MINING · THREE LAYERS OF ONE BUSINESS · UPDATED 23 NOV 2026

Bitcoin mining economics: the cost to produce, the value of the power, the price of the machines.

Three dashboards built from the published standards (plus the production database behind them): what a public miner pays to mine one bitcoin, what the market pays for each megawatt behind it, and what the machines cost per terahash.

$60,477L1 cash cost per BTC, Q3 2026
+16%cohort cash operating margin (of revenue)
$3.30mmedian infra value per committed MW
$7.05ASIC $/TH/s, class K3, Sep 2026 (THIN)
1 · PRODUCTION COST$60,477 per BTCWhat it costs a public miner in cash to produce one bitcoin (L1), against a realized price of $71,578. Starts from energy and ends at the full accounting cost.
2 · BUSINESS VALUE$3.30m per committed MWWhat the market pays for the power and infrastructure behind the machines, after taking out the bitcoin on the balance sheet. Mining names $1.20m, HPC/AI pivots $4.62m.
3 · COMPUTE PRICE$7.05 per TH/sWhat the machines themselves cost, by efficiency class, from disclosed deals and, for the latest fixing, seller offers. The latest month rests on one seller (THIN); the curve behind it is a 21-deal fit.

Miners covered, with links to each layer

CompanyL1 cost $/BTCCash marginEV / committed MWInfra / committed MWPages
ABTC American Bitcoin$44,779———profile
BTDR Bitdeer Technologies Group$49,604+31%$1.20m$1.20mprofile
HIVE HIVE Digital Technologies Ltd.$56,016+21%$0.94m$0.91mprofile
RIOT Riot Platforms, Inc.$57,461+19%$3.29m$3.22mprofile
CLSK CleanSpark, Inc.$61,570+14%$1.71m$1.25mprofile
WULF TeraWulf Inc.$77,976—$9.00m$9.00mprofile
IREN IREN Limited$78,686—$3.38m$3.38mprofile
CORZ Core Scientific, Inc.$80,675—$4.62m$4.62mprofile
MARA MARA Holdings, Inc.$83,763-17%$1.35m$0.83mprofile
CIFR Cipher Digital Inc. (ex-Cipher Mining)$135,614—$6.57m$6.55mprofile
HUT Hut 8 Corp. (consolidates American Bitcoin, ABTC)——$3.82m$3.38mprofile

Cost is Q3 2026 (headline table, four owner-operators with at least 500 BTC mined plus the ranked appendix names; CANG, FUFU, CLSK pending — Q3 2026 report not filed at the data cut); value per MW rolls daily (latest close, share count and debt; balance sheets and MW as last filed). A dash means the company is outside that standard's scope. Different dates and scopes are deliberate; each dashboard states its own.

Data status

What each dashboard shows today, how many of its companies have already filed Q3 2026 (from the SEC filings feed), and the planned refresh date.

DashboardShows nowLatest data dateQ3 filedNext refresh
Cost per BTCQ3 2026 filings30 Sep 202611 of 1524 Nov 2026
Interim additions: CleanSpark (10-K FY2026), Cango and BitFuFu (Q3 2026 results 6-K) within one business day of each filing
Value per MWQ3 2026 balance sheets (CleanSpark 30 Jun); prices roll daily, latest 23 Nov 202613 Nov 20268 of 1030 Nov 2026
Capacity (MW) re-base from Q3 filings and decks for nine companies; CleanSpark FY2026 10-K balance sheet
NAV and compute priceQ3 2026 balance sheets for 11 miners (interim 15 Nov), others earlier; model prices of 15 Oct 2026; daily mark of 23 Nov 2026 published as data (/data/mining/nav_daily.json)15 Oct 202614 of 2230 Nov 2026
Q3 2026 refresh (new balance sheets; ARBK and BTCT rechecked)
ASIC price per TH/stransactions to Sep 2026; K3 class rests on one seller2 Oct 2026n/a1 Dec 2026
Monthly update (November data; October offer layer if the quote archive is available)

How to read these pages

  • Dashboards (this section) show the published numbers as charts and compact tables; they are rebuilt from the same files as the standards, so there is no second set of figures.
  • Standards hold the definitions, filings used, validation logs and downloads: cost, capacity, ASIC price, NAV, catalog.
  • Filings: every new SEC filing of the miners and HPC pivots (earnings releases, 10-Q/10-K, material 8-K events, financing) is listed in the SEC filings feed the morning after it is filed; the standards re-base on the dates in the publication log.
  • Data dates differ: cost uses filings to 30 Sep 2026; value per MW uses the latest close and the latest filed balance sheets (daily roll); ASIC prices run to Sep 2026. Do not divide one by another without checking dates.
Scope. Informational research, not investment advice. Figures are model outputs from public filings and dated market data; definitions may differ from issuers' own metrics. See the general disclaimer.