Bitcoin mining or AI hosting? How to compare two uses of a power site

Public miners now report 6% to 83% of revenue from AI cloud or hosting. Comparing mining, colocation and GPU cloud on one capital boundary per IT MW.

PUBLISHED 13 SEP 2026 · UPDATED 12 OCT 2026 · 5 MIN READ · 1206 WORDS

Key takeaways

  • Mining, colocation and GPU cloud sell different things: a probabilistic share of network rewards, contracted infrastructure capacity, and hourly access to hardware. Revenue per MW alone misses the capital, customer and contract differences.
  • The public miners have moved far and unevenly. In the latest periods, Core Scientific, Applied Digital and TeraWulf earned 71–83% of revenue from hosting; IREN, HIVE and Bitdeer reported AI cloud at only 6–18%.
  • On the HASHFLOPS.IO model defaults, the capital behind one IT megawatt runs from about $0.7m of ASICs to $10m of colocation shell to about $29m of GPUs. Revenue per MW climbs the same ladder.

Begin with the service being sold

Mining converts computing work into a probabilistic share of network rewards; the operator owns the machines, bears hashprice risk and has no customer. Colocation sells contracted space, power and cooling to a tenant who brings the servers; the operator earns rent and bears construction, tenant-credit and re-leasing risk. GPU cloud sells access to computing hardware by the hour; the operator owns the GPUs and bears utilization, pricing and obsolescence risk. The businesses are not interchangeable, and the first question for any "AI pivot" is which of the three a company has entered.

How far the public miners have moved

The company catalog 1.2 snapshot (10 Oct 2026) sorts the former pure-play miners into three groups.

The first group has become landlords. Core Scientific reported colocation revenue of $136.7m out of $164.2m in Q2 2026 (83%), with self-mining at $21.5m and hosted mining at $6.0m. TeraWulf reported gross HPC lease revenue of $31.9m of $44.8m (71%) in the same quarter. Applied Digital's HPC hosting was $203.0m of $258.7m (78%) in the quarter to 31 May 2026, but $152.4m of that was one-off tenant fit-out services; recurring base rent was $44.1m plus $6.5m of recoveries, against $37.3m of mining hosting. Galaxy Digital wound down Helios mining in 2025; phase I (133 MW critical IT load) is delivered to CoreWeave, 526 MW is contracted under 15-year leases, and Q2 2026 data center leasing revenue was $18.9m.

The second group runs hybrids in which mining still dominates. IREN reported AI Cloud Services revenue of $128.8m out of $707.0m in the fiscal year to 30 June 2026 (18.2%), with mining at $578.2m. HIVE's HPC revenue was $7.06m of $79.12m (8.9%) in the quarter to 30 June 2026, against $72.06m of mining. Bitdeer's AI Cloud was $14.0m of $228.8m in Q2 2026 (6.1%), with self-mining at $168.4m.

The third group has signed but not yet reported. Hut 8 and Cipher (CIFR) entered the catalog on signed long-term AI leases, with no separate AI revenue yet in Q2 2026 packages. WhiteFiber sits apart: cloud services of $23.8m and colocation of $4.7m made up its $28.8m of Q2 2026 revenue, and its 40 MW NC-1 campus carries a 10-year, roughly $865m colocation agreement with Nscale.

Read the first group on data center metrics such as EV per MW and lease duration, the second on hashprice, and the third as a funding story until billing begins.

Compare the same capital boundary

Include the land, grid connection, buildings, cooling, networking and equipment each alternative needs, at the same valuation date, currency, tax treatment and ownership share. A hosting rent should not be compared with gross GPU revenue while the GPU purchase sits outside the investment, nor a mining margin with a colocation yield while the ASIC fleet is treated as paid for.

The three HASHFLOPS.IO calculators make the boundaries explicit. The mining model prices machines at $14,110 per PH/s and nothing else; the site is assumed to exist. The GPU model prices $35,000 per installed GPU and buys power at $0.07/kWh as if from a landlord. The data center model prices $10m per IT MW of building and electrical infrastructure, with power passed through at cost and no servers. None of the three is a complete site; together they describe one.

Worked example

Per-IT-megawatt figures are arithmetic on the model defaults (19 kW at the chip per PH/s; 1.2 kW per GPU), not observed transactions.

Use of 1 IT MW Inside the boundary Capital Year-1 revenue Model result
Bitcoin mining ≈53 PH/s of ASICs ≈$0.74m (machines only) ≈$0.75m ($50 hashprice, 80% uptime) NPV −$7,571 per PH/s; IRR −22.4% vs 15% hurdle
Colocation Shell, power, cooling $10m (no servers) ≈$0.9m base rent in year 1 (50% occupancy, $150/kW/month), rising to $1.53m at the 85% stabilized occupancy from year 3 NPV +$18.4m on 10 MW; IRR 14.5% vs 12% hurdle
GPU cloud ≈833 GPUs ≈$29.2m (GPUs only) ≈$11.9m ($2.50/GPU-hour, 65% utilization) NPV −$822k on 128 GPUs; IRR 8.2% vs 18% hurdle

Revenue per MW rises roughly fifteen-fold from mining to GPU cloud, but so does capital, and the terms differ: 4 years at 15% for mining, 4 years at 18% for GPUs, 10 years at 12% with an 8% exit cap rate for colocation. At the defaults only colocation clears its hurdle, with the longest capital commitment and the greatest dependence on terminal value. One input moves the ranking: mining breaks even at $0.039/kWh power, GPU cloud at 81.4% utilization or $3.13 per GPU-hour.

Conversion costs, contracts and the decision at the margin

Converting a mining site is not free reuse. Higher-density cooling, redundancy, fiber and a different electrical topology can require new spending, a revenue-free construction period and changes to the interconnection. Model the mining cash flow forgone during the build, confirm technical and interconnection requirements before assigning any benefit to reuse, and keep the residual value of displaced ASICs in the comparison.

Separate operating revenue, binding contracted revenue and prospective opportunities. A signed lease still needs review of commencement conditions, service credits, termination rights and funding obligations, and a headline contract value spread over ten or fifteen years is not a present value. One-off fit-out revenue, as in Applied Digital's quarter, should be stripped out before any run-rate is drawn.

The decision is made at the margin: compare the incremental discounted cash flow of conversion with continuing the existing use, including tax and working capital, and run a downside case for delayed commissioning and a lower realized price. The better allocation is the one the complete comparison supports, not the higher revenue per MW.

Questions to ask before investing

  • Which of the three services does the company sell, and in what revenue proportions for the latest period?
  • Are one-off items such as tenant fit-out services separated from recurring base rent?
  • What is inside the capital boundary of the quoted return: machines, GPUs, shell, grid connection?
  • How much mining cash flow is forgone during conversion, and is it in the model?
  • For signed AI leases, when does billing commence, who funds fit-out, and what are the termination rights?
  • Is the hurdle rate the same for both uses being compared, and if not, why?

Sources

  • Issuer releases recorded in the HASHFLOPS.IO company catalog 1.2 (snapshot 10 Oct 2026): Core Scientific Q2 2026 (28 Jul 2026); TeraWulf Q2 2026 (5 Aug 2026); Applied Digital Q4 FY2026 (27 Jul 2026); IREN FY26 8-K (27 Aug 2026); HIVE (15 Aug 2026); Bitdeer Q2 2026 (10 Aug 2026).
  • IREN, AI cloud and infrastructure service models: https://www.iren.com/
  • DC Byte, data center market coverage: https://www.dcbyte.com/