Headline
- Median infrastructure value per committed MW: $3.62m across 10 companies (15 Oct 2026: $3.50m) — $1.36m for the five BTC-mining-weighted miners (MARA, HIVE, CLSK, BTDR, RIOT) versus $5.19m for the five HPC/AI-pivot companies (IREN, HUT, CORZ, CIFR, WULF).
- Between the two cuts bitcoin fell from $82,309 to $68,249 (−17%), most miner share prices fell 16–40% (Riot, Core Scientific and TeraWulf were flat to higher) and Q3 balance sheets replaced June ones: the set's market cap is $41.7bn (was $51.4bn), EV $64.5bn (was $65.9bn), and bitcoin held is $4.9bn (was $6.6bn).
- On energized MW the cohort gap is 5.1× on EV (cohort A $2.58m/MW, cohort B $13.07m/MW); on portfolio MW infrastructure value is $0.95m vs $1.65m: the market pays cohort B for construction in progress and signed leases, not for today's load.
- Set aggregates: market cap $41.7bn, face debt $44.6bn, cash incl. restricted $22.3bn, EV $64.5bn, infrastructure value $59.6bn; 10,783 MW energized, 17,082 MW committed within 24 months, 39,560 MW portfolio.
- Restricted cash matters: $9.7bn of the $22.3bn cash sits in project construction and reserve accounts (HUT $3.6bn, CIFR $2.2bn, IREN $2.3bn, WULF $0.8bn, CORZ $0.8bn). Aggregators that net only unrestricted cash overstate EV for these names.
Headline table — ranked by Infrastructure value per Committed MW (cheapest first)
| # | Company | Cohort | Market cap $m | EV $m | BTC @spot $m | Infra value $m | Energized MW | Committed MW (≤24m) | Portfolio MW | EV/Energized | EV/Committed | Infra/Committed | Infra/Portfolio |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1 | HIVE Digital (HIVE) | A | 435 | 571 | 18 | 553 | 440 | 610 | 930 | 1.30 | 0.94 | 0.91 | 0.59 |
| 2 | MARA Holdings (MARA) | A | 2,708 | 4,893 | 2,321 | 2,572 | 1,900 | 2,405 | 4,800 | 2.58 | 2.03 | 1.07 | 0.54 |
| 3 | CleanSpark (CLSK) | A | 1,708 | 3,370 | 923 | 2,447 | 808 ᵁ | 1,800 | 1,800 | 4.17 | 1.87 | 1.36 | 1.36 |
| 4 | Bitdeer (BTDR) | A | 1,546 | 3,283 | 316 | 2,967 | 1,748 | 2,106 | 3,121 | 1.88 | 1.56 | 1.41 | 0.95 |
| 5 | Riot Platforms (RIOT) | A | 6,573 | 6,500 | 165 | 6,334 | 1,292 | 1,892 | 1,892 | 5.03 | 3.44 | 3.35 | 3.35 |
| 6 | IREN (IREN) | B | 7,710 | 11,343 | 0 | 11,343 | 2,310 | 2,910 | 5,000 | 4.91 | 3.90 | 3.90 | 2.27 |
| 7 | Hut 8 (HUT) | B | 6,911 | 11,294 | 1,146 | 10,148 | 710 | 2,040 | 9,370 | 15.91 | 5.54 | 4.97 | 1.08 |
| 8 | Core Scientific (CORZ) | B | 4,679 | 7,422 | 2 | 7,420 | 568 ᴵᵀ | 1,430 ᴵᵀ | 4,504 ᴵᵀ | 13.07 | 5.19 | 5.19 | 1.65 |
| 9 | Cipher Digital (CIFR) | B | 3,131 | 6,154 | 21 | 6,133 | 507 | 907 | 5,300 | 12.14 | 6.79 | 6.76 | 1.16 |
| 10 | TeraWulf (WULF) | B | 6,329 | 9,699 | 1 | 9,698 | 500 | 982 | 2,842 | 19.40 | 9.88 | 9.88 | 3.41 |
| Median — all 10 | 4.97 | 3.67 | 3.62 | 1.26 | |||||||||
| Median — cohort A | 2.58 | 1.87 | 1.36 | 0.95 | |||||||||
| Median — cohort B | 13.07 | 5.54 | 5.19 | 1.65 |
Multiples in $m per MW. ᵁ utilized load (CleanSpark reports utilized MW and GW under contract, not energized nameplate). ᴵᵀ critical-IT MW converted to gross at 1.30 (Core Scientific discloses IT MW only). Market-cap multiples (equity only) are in the inputs JSON.
How the numbers are built
- One data as of. Equity close 13 Nov 2026 × basic shares (latest cover page or proxy, pro forma for disclosed post-quarter issuance/exchanges); BTC $68,249.27 (BTC-USD close, 13 Nov 2026) — balance sheets are those of 30 Sep 2026 (10-Q / 6-K filed 2–10 Nov 2026); CleanSpark (fiscal year-end 30 Sep, 10-K not yet filed) is carried at 30 Jun 2026 plus its disclosed Sandersville financing and flagged stale.
- EV = Market cap + Debt + NCI − Cash. Debt at face (principal) as filed, pro forma for disclosed post-quarter issues and repayments (CIFR Oct-2026 converts +$850m and 2030-note exchange −$165.9m; IREN ATM 17.4m shares / +$630m; CLSK Sandersville +$2,276m). Non-controlling interests at book. Cash includes restricted cash — undisbursed project-note proceeds are financing, not infrastructure. Leases, warrant liabilities and deferred revenue are excluded from debt.
- Infrastructure value = EV − bitcoin held × spot (incl. pledged/loaned coins): what the market pays for sites, substations, grid rights, data halls, miners and contracted power.
- Three denominators, company definitions. Energized = grid-connected utility capacity at company-controlled sites as the company discloses it ("online electrical", "developed", "energy capacity under management"). Committed = Energized + capacity under construction or contracted for energization within 24 months (by 15 Oct 2028). Portfolio = the company's own total development pipeline incl. diligence/exclusivity/options. The per-site build-up for each company is on the Capacity sheet; a basis code flags the two companies whose figures are not gross-as-disclosed.
- Cohorts. A = BTC-mining weighted (mining revenue exceeded HPC revenue in H1 2026 and no multi-GW contracted HPC programme); B = HPC/AI-pivot. Medians are published for all ten and per cohort.
- Verification. Independent Python engine recomputes all derived values from the inputs JSON (0 mismatches); data checks: EV identity, medians, cohort split, balance-sheet age (CLSK stale), share counts from cover pages. The Excel workbook of v1.0 is not rebuilt for v1.1 (the inputs JSON and engine are the reproducible artefacts). SHA-256 fingerprint of the inputs below.
Reading the spread
- Energized vs committed. WULF ($19.40m → $9.88m per MW), HUT ($15.91m → $5.54m), CORZ ($13.07m → $5.19m) and CIFR ($12.14m → $6.79m) fall by half or more once construction in progress is counted. These are financed (project notes already raised) and leased, so the committed multiple is the more informative one for cohort B.
- Committed vs portfolio. HUT (9,370 MW pipeline, $1.08m/MW), CIFR (5,300 MW, $1.16m) and MARA (4,800 MW, $0.54m) carry the largest optionality: most of that capacity has no tenant and often no energization date. Portfolio multiples are an indicator of ambition, not of value.
- Cohort A is cheap on every denominator. MARA's infrastructure value is $2.6bn after deducting $2.3bn of bitcoin (47% of EV); HIVE trades at ~$0.91m per committed MW; CleanSpark and Bitdeer are at $1.36m and $1.41m. Riot ($3.35m) is the exception in the cohort: its developed MW include Rockdale capacity leased to AMD and a frontier AI lab.
- What changed since 15 Oct. The median moved from $3.50m to $3.62m: the mining cohort median fell from $1.58m to $1.36m (lower share prices and bitcoin, MARA now deducts a smaller coin stack) while the HPC/AI cohort median rose from $4.48m to $5.19m. Hut 8's restricted project cash fell from $6.8bn to $3.6bn, lifting its EV although its share price is 24% lower; Riot sold most of its bitcoin (11,380 → 2,418 BTC). Capacity is unchanged for nine of the ten companies, so these moves come from the numerator.
- What the multiple does not say. HPC leases earn 5–10× mining revenue per MW; committed MW still require $8–12m/MW of capex that is only partly in today's EV via restricted cash; tenant credit differs. Capacity multiples compare the price of power infrastructure across business models — they are not fair values.
Data-quality notes (release note)
- Release 1.1 scope (15 Nov 2026). Market data and Q3 balance sheets are refreshed for all ten companies. Capacity (energized / committed / portfolio MW) is refreshed only for Bitdeer (Q3 release, 31 Oct 2026); for the other nine it is carried from v1.0 (company disclosures to 15 Oct 2026) and is scheduled for the next step of the Q3 cycle. MW multiples therefore move only through the numerator.
- Interim update (15 Nov 2026, daily roll). The release above is unchanged; from 15 Nov the dashboard applies 37 inputs from the Q3 2026 reports (
/data/mining/interim_inputs.csv, each with the document cited): MW from the Q3 10-Q/6-K and decks (RIOT D1 1,292 → 1,332, D2 → 1,932, D3 → 2,000; CORZ D1 → 630.5, D2 → 1,456, D3 → 4,552; CIFR D3 5,300 → 4,300; HIVE D2 610 → 540, D3 → 860; HUT D3 9,370 → 8,569; BTDR D2 2,105.9 → 2,251; WULF D1 500 → 277.6 — the 500 MW are "expected to be energized by early 2027", energized today are 145 MW mining + 102 critical-IT MW × 1.30 — and D3 → 3,632), post-quarter events (MARA sold 13,597 BTC and repaid $750m of BTC-backed loans; HUT sold ~2,148 BTC, bought back shares and repaid the TZRC note; IREN's $388m DDTL draw; CIFR's 2032 notes at $745.4m net cash instead of $850m gross) and two corrections of this release (BTDR holds 47 BTC — the 4,631 were derived from a $343.8m collateral receivable; HUT's restricted short-term investments of $2,838.5m hold project-note proceeds and count as restricted cash). Daily-roll median infrastructure value per committed MW at the 13 Nov closes: $3.49m (release $3.62m; mining-weighted $1.36m, HPC/AI pivots $5.10m). The 30 Nov re-base carries these inputs into the next release. - Daily roll between re-bases (from 15 Nov 2026). The tables on this page are release 1.1 (cut 13 Nov 2026). The value-per-MW dashboard rolls every US session with the same engine and inputs: enterprise value from the latest close, share count, debt and cash, bitcoin at the same day's BTC-USD close, MW as last filed. New figures from SEC filings (share count, debt, cash, bitcoin held, MW) are entered within one business day in interim inputs with the document cited; a close that moves more than 60% against the release price is held at the release price (possible corporate action). The roll is reproducible from its own file (capacity_daily.json,
python3 tools/mining_daily_roll.py --check); the full re-base runs on the quarterly calendar (28 Feb, 31 May, 31 Aug, 30 Nov). - Confidence. CORZ and BTDR are flagged C: Bitdeer's Q3 release gives borrowings, cash and digital assets in aggregate (no full balance sheet yet; shares and restricted cash carried from v1.0), CORZ capacity is on a critical-IT basis converted at 1.30. CLSK is carried at 30 Jun 2026 (fiscal-year 10-K pending) and is stale by the 120-day rule.
- Basis. CLSK Energized = 808 MW utilized (Sept 2026 operational update). CORZ critical-IT MW converted to gross at 1.30 (assumption). WULF's Lake Mariner is carried at its 500 MW energized grid capacity although in-service load is lower; IREN's 2,310 MW includes the Sweetwater-1 substation with data halls still under construction.
- Pro forma events: CIFR Oct-2026 converts +$850m and 2030-note exchange −$165.9m (shares already in the cover count); IREN ATM after quarter-end 17.4m shares / +$630m; CLSK Sandersville notes +$2,276m. Events now inside reported balance sheets are no longer pro forma (MARA $600m BTC-backed loans, RIOT Coinbase repayment, CORZ Polaris acquisition). Not pro forma: RIOT's Morgan Stanley interim facility (drawn amount undisclosed), WULF's Abernathy sale instalments.
- NCI at book: HUT $370m (American Bitcoin minority; its market value is not captured), MARA $96m (permanent $16m + redeemable Exaion put $80m), CIFR $26m.
- Bitcoin counts: Bitdeer ~4,631 and HIVE ~268 BTC are derived from reported book values at the 30 Sep price (counts not given in the filings used); Hut 8 and MARA count loaned/pledged coins, consistent with v1.0.
- Restricted cash / debt above 50% at HUT and CIFR: EV for these two is the most sensitive to the restricted-cash rule.
Filings used (Q3 2026 refresh)
| Company | Balance sheet (30 Sep 2026) |
|---|---|
| MARA Holdings (MARA) | 10-Q Q3 2026, 9 Nov 2026 |
| Riot Platforms (RIOT) | 10-Q Q3 2026, 4 Nov 2026 |
| Core Scientific (CORZ) | 10-Q Q3 2026, 5 Nov 2026 (SEC accession 0001839341-26-000030) |
| Cipher Digital (CIFR) | 10-Q Q3 2026, 2 Nov 2026 (SEC accession 0001819989-26-000050) |
| TeraWulf (WULF) | 10-Q Q3 2026, 6 Nov 2026 |
| Hut 8 (HUT) | 10-Q Q3 2026, 4 Nov 2026 |
| IREN (IREN) | 10-Q fiscal Q1 2027, 5 Nov 2026 |
| HIVE Digital (HIVE) | 10-Q fiscal Q2 2027, 9 Nov 2026 |
| Bitdeer (BTDR) | 6-K Q3 2026 results, 10 Nov 2026 |
| CleanSpark (CLSK) | Carried from v1.0: 10-Q fiscal Q3 2026 and 8-K 25 Sep 2026 (10-K for fiscal 2026 pending) |
Capacity sources for v1.0 (company filings and investor materials to 15 Oct 2026) remain in force for the nine companies not re-based in this release. Prices: closes of 13 Nov 2026 (research feed, not redistributed). BTC: BTC-USD close, 13 Nov 2026.
Model integrity
- Standard version: 1.1 · Data as of: 2026-11-13 · Release: 2026-11-15 · Supersedes: 1.0 (cut 2026-10-15, kept in the archive)
- Companies: BTDR, MARA, CLSK, IREN, RIOT, CORZ, CIFR, HIVE, WULF, HUT
- Engine recompute: 186 derived values recomputed from the inputs JSON by capacity_engine.py — 0 mismatches
- Balance-sheet age at cut: 9 companies at 30 Sep 2026 (44 days); CLSK 30 Jun 2026 (stale)
- Verdict: READY (with WARN: CLSK stale, BTDR/CORZ confidence C, capacity of nine companies carried from v1.0)
- Validated at: 2026-11-14 22:33 UTC
- Inputs fingerprint (SHA-256):
cdc93ae14ba3a33a57d9a4c8273c416922a003bef3401a584effd10dcbe88eab
Disclaimer
- Informational research; not investment advice, not an offer or solicitation; no recommendations, target prices or signals are made or implied.
- Results are model outputs derived from the issuers' public filings and the stated assumptions under the published Standard; definitions may differ from issuers' own metrics and from other providers. Past data and hypothetical figures do not predict future results.
- Sources are cited per input; figures may be revised when issuers restate or when errors are found. Errata are published above the page and prior versions are retained with their fingerprints.