DIGITAL INFRASTRUCTURE / INVESTMENT INTELLIGENCERESEARCH PLATFORM · DATA CENTER FULL CYCLE INDEX · DATA AS OF 23 NOV 2026 · PUBLICATION LOG
MINING · VALUATION · EDITION 0.9.6 · DATA AS OF 18 NOV 2026 · STANDARD

The valuation standard: signed leases, new leases on AI data centres, mining sites at the cost to rebuild them

What is valued and how: the five parts of the value, the capacity breakdown, mining sites, the value if all capacity were leased, the assumptions, the company types, the checks and how to reproduce every number.

Edition 0.9.6 · published 21 Nov 2026Data as of 18 Nov 2026Checks passed: 0 errorsInput fingerprint b40059cbfd59…

Edition 0.9.6, published 21 Nov 2026. Rules marked as our assumptions are reviewed for version 1.0.

Status: standard 0.9.6 of 21 November 2026. It sets the chances of a lease for powered sites and the pipeline by a rule calibrated on the leasing observed over the last twelve months (rule B4.5), takes the cost to rebuild a mining site from build costs the companies filed (rule B5.4), and traces the nineteen leases and GPU cloud contracts that rested on news reports, estimates or unlinked filings to their documents on sec.gov (annex C); the other rules of 0.9.5 are unchanged. Edition 0.9.6: data as of 18 November 2026, valuation date 20 November 2026; the input fingerprint and the checks of the edition are in the data passport. Not investment advice; no price targets.

This standard applies the six principles of the site's equity valuation and publication standard — every number reproducible by independent calculations; facts kept apart from assumptions; a range, not a single number; the assumption that matters most shown on the page; no recommendations; caution only where it is argued — to listed bitcoin miners and to the companies that grew out of mining into AI data-centre landlords.

Contents. The method in brief · 1 Scope · 2 Terms · 3 Data and sources · 4 The value of a share · 5 The ten blocks (B1–B10) · 6 Company types · 7 Measures against the share price · 8 Checks · 9 Order of loading and updating information · 10 Versions and editions · 11 Open items for version 1.0 · Annex A Block review by company · Annex B Assumptions · Annex C Filed sources of the contracts

The method in brief

The value of a share is what the company has and has signed, less what it owes, divided by its shares, on one valuation date:

  1. Signed leases are valued like property: a year of operating income divided by a cap rate that depends on the tenant's credit, discounted to the year the lease is fully running, less the construction still to pay.
  2. GPU cloud contracts are valued as the cash margin over the contract, plus what the GPUs are still worth at the end, less the GPUs not yet delivered.
  3. Power without a tenant is valued as what an AI data centre on it would be worth after its full build cost, times the chance that a tenant signs — and only where that is worth more than the mining site it would replace. The value with every convertible megawatt leased is shown next to it.
  4. Mining is valued as operating sites at the cost to rebuild them and machines at market value; a megawatt counts once, as a mining site or as a data centre.
  5. The balance sheet adds cash and bitcoin and subtracts debt at face value, outside shareholders in subsidiaries and customer prepayments.

Three scenarios — cautious, central and optimistic — move the cap rates, discount rates, build costs, chances of a lease and the cost to rebuild; they are weighted 20%, 60% and 20%. Every number has a source and a source type; every value is computed three independent ways; every company is reviewed block by block. Market data come from the site's daily files and are frozen at a data cut; a new edition follows the quarterly calendar and the filings that change its inputs (section 9).

1. Scope

  1. Listed companies with bitcoin mining or AI data-centre capacity whose power, leases and balance sheet are disclosed in filings with the U.S. Securities and Exchange Commission (SEC). Edition 0.9.6 covers ten: Bitdeer (BTDR), Cipher (CIFR), CleanSpark (CLSK), Core Scientific (CORZ), HIVE (HIVE), Hut 8 (HUT), IREN (IREN), MARA (MARA), Riot (RIOT), TeraWulf (WULF).
  2. The standard values the shares on one valuation date, in three scenarios. It computes no targets for future years and makes no recommendation.
  3. A company is added only with a full block review (annex A) and an entry in the site's filings check (section 9.6).

2. Terms

Term Meaning
Data cut The date of the frozen market data (share price, bitcoin price, balance sheet as rolled forward by the site)
Valuation date The date to which every cash flow is discounted
Edition One published recalculation: a data cut, a register revision, an assumptions file and this standard
Register The list of signed leases, GPU cloud contracts, capacity rows and company notes, each row with its source
Megawatt (MW) of grid power Power the site can draw from the grid; a megawatt of server load (IT MW) is the part available to computers
Source type A company filing (A), a company statement (B), a secondary source (C), our own estimate (D)
Scenarios Cautious, central and optimistic (often called bear, base and bull), weighted 20%, 60% and 20%
Open point A figure that stands but needs a document, a newer figure or a decision; listed on the page until settled

3. Data and sources

  1. Order of preference. A company filing on the SEC's EDGAR system (A); the company's own release, presentation or earnings call (B); a news or data report (C); our own estimate with its working (D).
  2. Source link (rule B1.2, applies to every row). A row rated A links a document on sec.gov. A row rated B links a filing, the company's own release (newswire or investor site) or its earnings call. A row whose links do not support its rating is an open point until they do.
  3. Market data come from the site's daily value-per-megawatt file, frozen at the data cut with its SHA-256 fingerprint: closing share price, shares, debt at face value, cash including cash set aside, bitcoin held, outside shareholders in subsidiaries, and energised, committed and pipeline megawatts. Its quarterly figures come from 10-Q and 10-K reports (6-K, 20-F and 40-F for foreign issuers); changes after the balance-sheet date come from current reports, entered in the site's interim inputs with the document cited.
  4. Tenants the company has not named are not named here.
  5. Freshness limits at the data cut: share price no older than 5 trading days; balance sheet no older than 120 days; bitcoin count no older than 45 days. An older figure stands and is an open point.

4. The value of a share

Value of the shares = B1 signed leases + B2 GPU cloud contracts + B4 added value from new leases + B5 mining sites + B6 mining machines − B7 company overhead − B8 construction money already raised and set aside + B8 money owed by related parties + B9 (cash + bitcoin − debt − outside shareholders in subsidiaries − customer prepayments).

Value per share = the value of the shares, never below zero ÷ B10 shares.

Each scenario is computed in full; the weighted average uses 20%, 60% and 20%, and the optimistic weight is never above the cautious one. B3, the capacity breakdown, adds no value by itself: it decides which megawatts B4 and B5 may count.

5. The ten blocks

Each block states what it is, its formula, its inputs and sources, its rules, its checks and what version 1.0 changes. The assumption values of the three scenarios are in annex B.

B1. Signed leases

What. Data-centre leases and colocation contracts the company has signed.

Formula. Value = operating income of the first full year ÷ cap rate × (1 + r)^−t − construction still to pay × (1 + r)^−t/2, where r is the contract discount rate and t the years from the valuation date to the date the lease is fully running.

Inputs and sources. Megawatts of server load and grid power, contract value, term, yearly rent increase, operating income or margin, tenant and its credit, date fully running, delivery status, construction cost to complete. Each lease carries its source type and links (rule B1.2).

Rules. - B1.1 Proof. A lease counts as signed only if a company filing or company statement confirms it. Terms from a secondary source or our own estimate are allowed before version 1.0 but are open points; from version 1.0 such a lease is not published. - B1.2 Source link: section 3.2. - B1.3 Operating income of the first full year: the figure the company discloses; otherwise the disclosed first-year rent × operating margin; otherwise the first-year rent worked back from the contract value with the yearly rent increase g and the term n — contract value ÷ Σ(1 + g)^k for k = 0…n−1 — × margin. Margin: disclosed, otherwise the standard margin. - B1.4 Cap rate by tenant credit: the investment-grade rate only for a tenant with a disclosed investment-grade rating or a guarantee from an investment-grade company; otherwise the other rate. - B1.5 Timing: leases not yet delivered start one year later in the cautious scenario. The delivery status must agree with the date fully running. - B1.6 Construction: the company's disclosed cost to complete; otherwise the standard build cost per megawatt of server load. Where the build is financed at company level by project notes, this block carries no construction cost and the restricted cash raised for it is deducted in B8, so the cost is counted once.

Checks. E3, E4, E8, E9 (section 8); block review: source type against links, delivery status against date, short investment-grade leases, undisclosed margin or cost.

Version 1.0. A chance of completion for leases still to be built; the investment-grade rate limited to the guaranteed part of a contract; a cash-flow test over the term next to the cap rate; rent before the lease is fully running; tax.

B2. GPU cloud contracts

What. Contracts under which the company rents out computing on its own GPUs.

Formula. Value = Σ (contract value ÷ years × cash margin) × (1 + r)^−k over the years k of the contract, discounted to its start, + GPU cost × residual share × (1 + r)^−(start + years) − GPU cost × share not yet delivered × (1 + r)^−start/2.

Inputs and sources. Contract value, years, start, GPU cost (disclosed, otherwise 0.598 × contract value, from IREN's $5.8bn of GPUs for its $9.7bn Microsoft contract), share of GPUs not yet delivered.

Rules. B2.1 Source rules as in B1.1–B1.2. B2.2 The GPU fleet outside the listed contracts is not valued; a company whose revenue comes mostly from renting GPUs is a partial view (section 6).

Checks. Block review: source type against links, undisclosed GPU cost.

Version 1.0. Value of the GPU fleet outside listed contracts.

B3. Capacity breakdown

What. Every megawatt the company reports, placed in one status.

Status Meaning Chance of a lease Mining value With all capacity leased
Signed lease A signed lease or colocation contract counted in B1 none unchanged
GPU cloud contract Capacity used for signed GPU cloud contracts counted in B2 none unchanged
Letter of intent or exclusivity A tenant has signed a letter of intent, an exclusivity, a reservation right or a right of first offer 5% / 45% / 60% if built leased
Powered, no tenant Power connected or contracted at a site the company owns or controls, no tenant 10% / 30% / 50% (rule B4.5) if built leased
Pipeline Grid queue, development, due diligence or a purchase not yet closed 0% / 5% / 15% (rule B4.5; our assumption) if built leased
Own use Used by the company itself (its own GPU cloud, retained mining) 0 yes not converted
Cannot be converted Hosted for others, managed for others, or no market for large data centres 0 if the equipment is the company's not converted

Rules. - B3.1 Each megawatt sits in exactly one status. - B3.2 The statuses add up to the company's total within 0.5%. - B3.3 The total is counted in grid megawatts unless the company reports only server load; the basis and its source are recorded. - B3.4 Control. A site counts as powered or under a letter of intent only if the company owns or controls it at the data cut. A purchase not yet closed sits in the pipeline; at closing the next edition moves it and enters the price paid from the current report (8-K items 2.01 and 2.03) through the site's interim inputs. - B3.5 A row that is our estimate (the company's total less the sites it lists) is allowed and marked. - B3.6 A total that differs from the site's capacity pages by more than 1% is an open point.

Checks. E10; block review: closure, basis, estimates, purchases not closed.

B4. Capacity without a lease

What. The chance that powered sites, sites under a letter of intent and the pipeline will be leased to AI tenants.

Formula. Added value = chance of a lease × max(0, data-centre value − value of the mining site it replaces). Data-centre value = company's share × megawatts of server load × value per megawatt of server load, never below zero. Server load = grid megawatts × 0.60 / 0.70 / 0.75. Value per megawatt of server load = reference rent × relative economics × 99% margin ÷ cap rate × (1 + d)^−t − build cost × (1 + d)^−(t−1), with d the development discount rate and t the years to the date a new lease is fully running (2030 for powered sites and letters of intent, 2031 for the pipeline in the central scenario).

Rules. B4.1 Only letters of intent, powered sites and the pipeline can be converted; own use and capacity that cannot be converted never are. B4.2 A site converts only where the data centre is worth more than the mining site it replaces. B4.3 Through a joint venture only the company's share of the new data centre counts; the mining site belongs to the company in full. B4.4 The value with all capacity leased (chance 100%) is published only next to the value with the chance of a lease, with its build cost. B4.5 Chance of a lease. For powered sites the chance follows the pace of leasing observed over the twelve months before the data cut: h = grid megawatts newly leased by the covered companies ÷ (those megawatts + powered megawatts still without a tenant). Chance = 1 − (1 − h × k)^n, with a signing window of n = 2 years (1 year in the cautious scenario) and k = 1/4, 1/2 and 1 in the cautious, central and optimistic scenarios, rounded to the nearest 10 percentage points and never above 50%. A pipeline site first needs about a year to secure power, so its chance is set below that of powered sites: 0% / 5% / 15%, our assumption. h is recomputed at each quarterly re-cut; a change in a rounded chance is a change of assumption (layer L4) and needs the owner's approval. Edition 0.9.6: 4,850 MW leased in the twelve months to 20 November 2026 (3,396 MW of server load) against 8,686 MW powered without a tenant, h = 36%; chances 9%, 33% and 59% before rounding, 10% / 30% / 50% after. Cross-check: the CleanSpark share price implies about 30% (section 7.4). Approved by the owner on 21 November 2026.

Checks. E6, E11; block review: joint ventures, assumptions marked.

Version 1.0. A chance for each site (power date, size, market) instead of one chance per status; the pipeline chance from observed power connections.

B5. Mining sites

What. Operating mining sites — substation and electrical equipment, buildings or containers, cooling — without the machines.

Formula. Value = operating mining megawatts × cost to rebuild per megawatt ($0.30m / $0.45m / $0.90m).

Inputs and sources. Mining megawatts of each site from the company's site tables, with the rule used for each estimate; the build costs of mining sites, without machines, that the companies filed (rule B5.4).

Rules. B5.1 A megawatt counts once: megawatts under a signed lease or GPU contract carry no mining value. B5.2 Mining megawatts above the energised megawatts of the site's capacity pages are an open point. B5.3 Cross-check against site sales: operating sites sold in 2026 for about $0.4–0.7m per megawatt including the machines (Canaan's purchase of 49% of three Texas joint ventures from Cipher, about $0.68m; Fortitude's 12.5 MW site in Nebraska, about $0.38m); the central cost to rebuild sits at the low end of that range. Each report shows the central value at $0.5m per megawatt and without the sites. B5.4 Cost to rebuild from filed build costs, per megawatt of grid power without machines: cautious = the median of the filed air-cooled builds; central = the newest build with its full cost filed; optimistic = an immersion build with its own substation. Edition 0.9.6: Hut 8 Salt Creek, 63 MW, about $0.24m (8-K of 3 March 2025); Hut 8, a site built in 78 days, about $0.25m, and Bravo, 42 MW, about $0.35m (10-K for 2024); Riot Commerce Drive and Blue Steel, $0.302m (8-K of 23 July 2024, exhibit 99.2); Hut 8 Vega, all-in, about $0.455m (10-K for 2025); Riot Corsicana phase I, immersion, $0.905m including $0.094m of substation (8-K of 13 June 2024); HIVE, a Tier-I data centre, about $1m (6-K of 17 February 2026). Median of the four air-cooled builds $0.28m, rounded to $0.30m; Vega $0.45m; Corsicana $0.90m. Updated when a company files a new build cost; approved by the owner on 21 November 2026.

Checks. E12; block review: megawatts against energised megawatts.

Version 1.0. Central value at the lower of the cost to rebuild and the value of mining (from the site's cost-per-bitcoin standard and current hashprice), or at the level of site sales.

B6. Mining machines

What. The company's mining machines at market value.

Formula. Value = fleet value × 0.75 / 1 / 1.743. Fleet value: the figure of the site's miner net asset value standard (version 1.2, primary price $7.05 per terahash per second); where that standard has no fleet value, installed hashrate of the latest quarterly report × $7.05.

Rules. B6.1 The machines line is the number of the miner net asset value page. B6.2 Hashrate is dated to the latest quarterly report. B6.3 Mining sites with no machines, or more than 30 watts of site per terahash per second of installed hashrate, are an open point (sites may be idle).

Checks. Block review; agreement with the miner net asset value page (section 8.4).

B7. Company overhead

Formula. Value = yearly overhead × 10 (a perpetuity at 10%): $45m / $30m / $25m a year, the same for every company.

Version 1.0. The company's own cash overhead from its quarterly reports, without share-based pay, which is counted as dilution.

B8. Construction money and other assets

Rules. B8.1 Construction money already raised by project notes and held as restricted cash is deducted where B1 carries no construction cost for the same build (B1.6); the cautious scenario may add a disclosed cap on cost overruns. B8.2 Money owed by related parties or held as their collateral counts only in the optimistic scenario.

B9. Debt, cash and bitcoin

Formula. Net claims = debt at face value + outside shareholders in subsidiaries + customer prepayments − cash (including cash set aside) − bitcoin held × bitcoin close of the data cut.

Rules. B9.1 Debt at face value, convertible notes included, from the balance sheet rolled forward by filed changes. B9.2 Customer prepayments count as debt where the full contract value is counted in B1 or B2. B9.3 Outside shareholders in subsidiaries at book value. B9.4 Issuers reporting under IFRS (Bitdeer, HIVE) are read from their documents directly.

Version 1.0. A listed subsidiary at market value (Hut 8's American Bitcoin); a discount on pledged or lent bitcoin; a test of convertible notes for conversion; tax.

B10. Shares

Rule. Shares outstanding from the cover of the latest report or a later filing, plus warrants that cost almost nothing to exercise. Other warrants and options above the share price are left out; convertible notes are not converted (version 1.0 tests them).

6. Company types

Type Definition What is published
Landlord At least one signed data-centre lease or colocation contract Full valuation: the three scenarios, the weighted average, where the share price lies, the cap rate that matches the price, the value with all capacity leased and the share priced in
Miner Mining brings at least 80% of revenue and there is no lease Partial view: what the capacity and the mining sites add; the company as a whole is valued by the miner net asset value standard, so the result is not compared with the share price
GPU cloud Most revenue comes from renting GPUs Partial view; the GPU fleet outside the listed contracts is not valued yet

7. Measures against the share price

  1. Without new leases: the central value with the chances of a lease set to zero.
  2. All capacity leased: the value with a chance of 100% for every site that can be converted (rule B4.2 applies); in the cautious scenario new building does not earn its cost, so it adds nothing.
  3. Build cost of leasing everything: megawatts of server load × company's share × build cost, summed over the sites that would convert, against the company's stock-market value.
  4. Share of unleased capacity priced in: the single chance at which the central value equals the share price — (share price × shares − central value without new leases) ÷ added value with everything leased. Below zero the price is under the value of what is signed and the mining sites as they are; above one it is above the value even with everything leased.
  5. Cap rate that matches the price: the single cap rate on the signed leases at which the central value equals the share price.

8. Checks of every edition

  1. Three routes. A Python program; a spreadsheet of live formulas recalculated by LibreOffice (every block, company and scenario, 840 values in edition 0.9.6, tolerance one part in a million); an independent recomputation written from the text of this standard. Any difference stops publication.
  2. Errors stop publication. E1 input fingerprint; E2 every row belongs to a covered company and has a source and source type; E3 term and rent increase where income is worked back; E4 allowed credit, status and megawatt basis; E5 three scenarios, valid ranges, weights add up to 100%, optimistic weight not above cautious; E6 cautious ≤ central ≤ optimistic, with chances and with all leased; E7 no formula error, routes agree; E8 construction cost not negative; E9 new leases never earn more on their build cost than the best signed lease; E10 breakdown adds up within 0.5%; E11 all leased never below the value with chances; E12 mining megawatts between zero and the site's megawatts.
  3. Gate of the site copy. G1 fingerprint; G2 file checksums; G3 page equals the program; G4 reports equal the program and their parts add up; G5 the site copy equals the base; G6 indexing follows the edition's status; G7 no internal code in the visible text; G8 the site's filings check covers exactly the valued companies; G9 the block review has no finding to fix and covers every company and block; G10 the validation verdict is READY and every pipeline row has a megawatt basis.
  4. Agreement with the rest of the site. Every figure the site shows for a company in another place (value per megawatt, company card, miner net asset value) is set next to this valuation's figure: the same, explained, or to check. An unexplained difference is an open point.
  5. Block review (annex A). Every company, every block, fixed tests with four levels: ok; note (a known limit of the method); open (a document, figure or decision is needed); fix (breaks a rule; corrected by a register revision before publication).

9. Order of loading and updating information

How the market data and the filed figures themselves are created, checked, kept and corrected is set by the site's Market Data and Calculation Inputs Standard: its sources, its daily cycle, its acceptance rules for a close, its one-business-day rule for filed figures and its rule that frozen inputs are never edited apply to layers L1 and L2 below. This section sets how the valuation uses them.

9.1 Five layers

Layer What Source How often Deadline
L1 Market data Closing share prices, market value (latest close × latest share count), bitcoin close The site's daily quotes feed and daily value-per-megawatt file Every US trading session: the daily run at 04:00 Moscow time (owner decisions of 14–15 November 2026) Same day: the latest close and market value are shown next to the valuation; the valuation keeps the closes of its data cut
L2 Balance sheet and shares Debt, cash, bitcoin held, outside shareholders, customer prepayments, shares, near-free warrants 10-Q, 10-K (6-K, 20-F, 40-F) through the value-per-megawatt release; later changes from current reports through the site's interim inputs Quarterly, plus each current report that changes a figure New edition within 10 business days of a quarterly or annual report; an interim figure within 1 business day of reading its filing
L3 Register Leases, GPU contracts, capacity breakdown, mining megawatts, construction money, company notes 8-K, 6-K, company releases, presentations, calls When an event is filed or announced New edition within 5 business days
L4 Assumptions Cap rates, discount rates, build cost, rents, chances, cost to rebuild, machine prices, overhead Comparable deals, published models, cost studies Quarterly review; earlier when a comparable deal falls outside a scenario range Owner approval
L5 Method This standard Owner decisions, audits When a rule changes; at least yearly Owner approval

9.2 When a new edition is due

Trigger Deadline
R0 Quarterly calendar: 28 February, 31 May, 31 August, 30 November (the value-per-megawatt re-base dates; the last trading day before when the date is not one) A full re-cut on that data cut
R1 A quarterly or annual report of a covered company 10 business days
R2 A new or ended lease, letter of intent, GPU cloud contract, financing, or a closed purchase or sale 5 business days
R3 Bitcoin more than 20% away from the data-cut close 5 business days
R4 A share count more than 5% away from the data-cut count 5 business days
R5 An error found in a published edition 1 business day, with a note of what changed

9.3 Order of a recalculation

  1. Freeze market data. Copy the site's daily value-per-megawatt file at a recorded repository version into the base with its SHA-256 (config/market_snapshot_<cut>.json, market_snapshot_meta.json).
  2. Balance sheet. Check that every figure filed since the last edition is in the site's interim inputs, with its document; enter what is missing first (the site's rule: within 1 business day of reading).
  3. Register. Write one revision script (make_register_rN.py) for the events since the last edition: every changed row with its source, source type and reason; nothing else changes. Pending purchases follow rule B3.4.
  4. Assumptions. A new parameter file only if an assumption changes, with its source; owner approval.
  5. Inputs. build_inputs.py joins register, assumptions and market data and computes the input fingerprint.
  6. Calculate and check. cvs_validate.py (program, spreadsheet, errors E1–E12), recompute_independent.py (third route), block_review.py (annex A), reports.py, passport.py; or bash scripts/run_all.sh for all of them.
  7. Gate and site. check.py (G1–G10), the site build and its link, release and browser checks.
  8. Close the filings. Mark the filings assessed for this valuation as done in the site's filings check, with the edition that used them.
  9. Record. Update the publication log entry (version, dates, warnings) and the edition's status file.
  10. Publish. A branch and a pull request; publication to hashflops.io only after the owner's approval; after the merge, compare the live files with the build by SHA-256.

9.4 Freshness on the page

Every page shows the data cut, the latest close and market value next to the valuation, the filings of each company since the data cut and what each means for this valuation (no effect, to check, recalculation due by a date), and the next edition due under 9.2.

9.5 Corrections

An error in a published edition is corrected by a new edition under trigger R5; the previous edition's files stay in the repository and the change is described in the data passport.

Corrected in edition 0.9.6 (register r7), when the contracts resting on news reports or estimates were traced to their filings (annex C): Cipher's Stingray lease is triple-net with about 100% operating margin and rent from April and May 2027 (was 89.6% and January 2028); the credit support AMD gives Core Scientific's cloud tenant is a right, not an obligation, to cure its defaults, so the lease takes the cap rate of other tenants (was investment grade); TeraWulf's Core42 lease is valued from its disclosed rent of $125 per kilowatt a month, $1,031.7m over ten years (was $1,116.7m, Fluidstack's value per megawatt); Riot's AMD expansion is fully running in May 2027 (was June 2027); HIVE's second GPU cloud contract, about $220m over three years, is added. The effect on each company is in the data passport.

9.6 The filings check

The site's filings check reads EDGAR every three hours and again at the daily run (owner decision of 15 November 2026). Every filing of a covered company is assessed automatically (base mining-valuation): a quarterly or annual report means a recalculation within 10 business days; new debt within 5; a material agreement, its end, a completed purchase or sale, a share issue, an earnings release or a prospectus is read and, if it is a lease, letter of intent, GPU contract or financing, recalculated within 5; other releases get a headline check.

10. Versions and editions

A standard version changes rules (major for the method, minor for rules and procedure). An edition is a published recalculation; its number follows the standard version (0.9.6) or adds a step for a data-only edition. The register has its own revisions (r1–r7), each a script that states what changed and why. Every edition keeps its inputs, results, register and checks in the repository; the reproduction kit rebuilds the inputs byte for byte.

11. Open items for version 1.0

  1. A chance of a lease for each site instead of each status (B4.5); rules for own use and capacity that cannot be converted; the central value of mining sites at the lower of the cost to rebuild and the value of mining (B5); taxes.
  2. Company overhead from the company's own reports (B7); a chance of completion for leases still to be built, the investment-grade rate on the guaranteed part only, a cash-flow test over the term and rent before full running (B1).
  3. A filed contract value for every signed lease (B1.1): since edition 0.9.6 every lease and GPU contract links a filed document or the company's own release or call (annex C), and one value, Riot's AMD expansion, is still our estimate; site-by-site confirmation of estimated megawatts (B3.5, B5).
  4. A listed subsidiary at market, a discount on pledged bitcoin, conversion of convertible notes (B9, B10); the GPU fleet of GPU cloud companies (B2); Cipher's machines at Odessa (B6).

Annex A. Block review by company

Generated on every edition by block_review.py and published with it: each company report shows its ten blocks — what is counted, the central value per share, the rule and the findings — and the data passport carries the matrix of statuses for all companies. Findings of level «fix» must be corrected before publication (gate G9).

Annex B. Assumptions

Assumption Cautious Central Optimistic Source
Cap rate, investment-grade tenant (B1) 7.5% 6.5% 6.0% Sale-leaseback of a data centre to Amazon at 7.0% (16 November 2026); prime properties trade 1.0–1.5 percentage points above the 10-year U.S. Treasury yield
Cap rate, other tenants (B1) 9.5% 8.5% 7.0% 2 percentage points above investment grade; unrated tenants price 2–3 points wider
Contract discount rate (B1) 10.5% 8% 7% CleanSpark fair value model v4.1 (withdrawn 20 November 2026; archived in the library)
Delay of leases not yet delivered (B1) 1 year 0 0 This standard
Operating margin where not disclosed (B1) 85% 90% 95% Disclosed margins of 85–99%
Build cost, $m per megawatt of server load (B1, B4) 13.09 11.9 11.305 CleanSpark fair value model v4.1; Sandersville about $11.9m
GPU contracts: margin, discount rate, value of the GPUs at the end (B2) 80%, 18%, 0 85%, 14%, 10% 88%, 12%, 15% The site's GPU cloud model
GPU cost per dollar of contract (B2) 0.598 0.598 0.598 IREN and Microsoft: $5.8bn of GPUs for a $9.7bn contract
Chance of a lease: letter of intent / powered / pipeline (B4) 5% / 10% / 0% 45% / 30% / 5% 60% / 50% / 15% CleanSpark fair value model v4.1 (letters of intent); rule B4.5 (powered: observed leasing; pipeline: our assumption)
Reference rent in the first year (B4) $1.395m per megawatt of server load same same Sandersville: $6,560m over 20 years with 3% yearly increases, 175 MW of server load
New leases against the reference rent (B4) 70% 80% 90% CleanSpark fair value model v4.1
Server load per megawatt of grid power (B4) 0.60 0.70 0.75 CleanSpark fair value model v4.1; Sandersville 175 of 250 MW
Cap rate and development discount rate for new leases (B4) 7.5%, 12% 7.0%, 12% 6.5%, 10% Amazon sale-leaseback; the site's data-centre model
New leases fully running: powered and letters of intent / pipeline (B4) 2031 / 2032 2030 / 2031 2030 / 2031 This standard
Mining sites, $m per megawatt (B5) 0.30 0.45 0.90 Build costs filed by Hut 8, Riot and HIVE (rule B5.4); site sales in B5.3
Mining machines, multiple of the fleet value (B6) 0.75 1 1.743 Miner net asset value standard v1.2: $7.05 per TH/s; upper level $12.29
Company overhead, $m a year × 10 (B7) 45 30 25 CleanSpark fair value model v4.1
Money owed by related parties (B8) not counted not counted counted This standard
Scenario weights 20% 60% 20% Equity valuation standard: the optimistic weight not above the cautious one

Annex C. Filed sources of the contracts

The nineteen leases and GPU cloud contracts traced to their filings for edition 0.9.6, with the document filed with the SEC that confirms their terms (register r7). The register cites each document in full, with any further filings; the reports link them next to each contract. The other four contracts were already linked: CleanSpark's Sandersville lease to its filings; Core Scientific's CoreWeave leases, Cipher's Barber Lake lease and IREN's Microsoft contract to the companies' own releases and calls.

Contract Filed document What it confirms
Bitdeer — Tydal, Norway, Volta Tydal AS, 121 MW, 16 years 6-K of 4 August 2026, exhibit 99.1 $4.7bn over 16 years; 121 MW of server load
Bitdeer — AI cloud contracts 6-K of 10 November 2026, exhibit 99.1 AI cloud backlog of about $2.9bn
Cipher — Black Pearl, Texas, Amazon Web Services 8-K of 3 November 2025, exhibit 99.1 About $5.5bn, 15-year lease, 300 MW in 2026
Cipher — Stingray, Texas, Amazon Web Services, 70 MW 8-K of 8 June 2026, exhibit 99.1 About $2.0bn, 15 years plus three 5-year options, triple-net, about 100% operating margin, 3% yearly increases, rent from 1 April 2027 (10 MW) and 1 May 2027 (60 MW), Amazon.com guarantees the base rent
Core Scientific — AMD, 377 MW, and cloud provider, 152 MW 8-K of 27 July 2026, item 7.01; second-quarter 2026 results release; 10-Q for the third quarter of 2026 AMD leases 377 MW at three sites; more than $14bn for about 530 MW over 15 years plus three 5-year options; AMD may, but need not, cure the cloud provider's defaults
HIVE — Bell Canada AI cloud, B200, 2 years 10-Q for the quarter to 30 September 2026 About $30m over two years, 504 B200 GPUs
HIVE — Bell Canada AI cloud for Cohere, GB200, 3 years 8-K of 22 June 2026, exhibit 99.1 About $220m over three years, 2,304 GB200 GPUs, live from late 2026 to early 2027; the 10-Q adds a $128.9m loan to buy the GPUs
Hut 8 — River Bend, Louisiana, Fluidstack, 245 MW 8-K of 17 December 2025, exhibit 99.1 $7.0bn over 15 years, triple-net, 3% yearly increases, Google backstop
Hut 8 — Beacon Point, Texas, phase 1, 352 MW 8-K of 6 May 2026, exhibit 99.1 $16.8bn on 597 MW across River Bend and Beacon Point, that is $9.8bn for phase 1
Hut 8 — Beacon Point, Texas, phase 2, 352 MW 8-K of 20 July 2026, exhibit 99.1 A second 15-year lease, $9.8bn, 352 MW, the same tenant
IREN — NVIDIA cloud services, 5 years 10-K for fiscal 2026 About $3.4bn over five years, signed May 2026
IREN — other AI customers 10-K for fiscal 2026; 8-K of 20 July 2026, exhibit 99.1 About $2.8bn of multi-year contracts signed in July 2026 (term not disclosed)
Riot — Rockdale, Texas, AMD, 25 MW 8-K of 16 January 2026, exhibit 99.1 About $311m over 10 years plus three 5-year options
Riot — Rockdale, Texas, AMD expansion, 25 MW 10-Q for the second quarter of 2026 10 MW from November 2026 and 15 MW from May 2027; contract value not disclosed (our estimate)
Riot — Rockdale, Texas, AI lab, 191 MW 8-K of 10 August 2026, exhibit 99.1 About $9.1bn over 20 years
Riot — Corsicana, Texas, AI lab, 910 MW 8-K of 4 November 2026, exhibit 99.1 About $28bn over 15 years, triple-net lease of powered land, about $1.8bn of rent a year on average
TeraWulf — Lake Mariner, New York, Fluidstack, 378 MW 8-K of 14 and 18 August 2025, exhibit 99.1; presentation for the fourth quarter of 2025 $6.7bn over 10 years for more than 360 MW, Google backstop; 378 MW in the presentation
TeraWulf — Lake Mariner, New York, Core42, 60 MW 8-K of 26 December 2024, exhibit 99.1 (call) $125 per kilowatt a month, 3% yearly increases, 10 years plus two 5-year options, G42 guarantee
TeraWulf — Justified, Kentucky, Anthropic, 401 MW 8-K of 6 July 2026, exhibit 99.1; 8-K of 4 November 2026 About $19bn over 20 years

Not counted: a multi-year GPU cloud contract IREN signed with an AI lab in August 2026, whose value is not disclosed (10-K for fiscal 2026); it is an open point of IREN's report.

← Back to all companies