Edition 0.9.6, published 21 Nov 2026. Rules marked as our assumptions are reviewed for version 1.0.
Valuation date 20 November 2026 · data as of 18 November 2026 · input fingerprint b40059cbfd5980d9… · checks: passed, 0 errors, 19 open points · published 21 November 2026 · licence CC BY 4.0 (free to reuse with credit)
1. What the data measure
- Value per share of listed bitcoin miners and AI data-centre landlords in three scenarios — cautious, central and optimistic (often called bear, base and bull) — and their average weighted 20%, 60% and 20%. The value is a sum of parts: signed data-centre leases, GPU cloud contracts, the chance that capacity without a lease is leased to AI tenants, operating mining sites at the cost to rebuild them, mining machines at market value, and the balance sheet.
- Capacity breakdown: every megawatt a company reports, placed in one status — signed lease, GPU cloud contract, letter of intent or exclusivity, powered without a tenant, pipeline, own use, cannot be converted — adding up to the company's total.
- If all capacity were leased: the value per share with every convertible megawatt leased, the cost of building it compared with the company's stock-market value, and the share of unleased capacity that the share price already treats as leased.
- Units: millions of US dollars for the parts of the value, US dollars per share for values, megawatts (MW) of grid power or of server load as stated.
2. Sources and their legal status
- Share prices and balance sheets: a frozen copy of the site's daily value-per-megawatt file
src/data/mining/capacity_daily.jsonof 18 November 2026 (versionc888e4b, SHA-25662f7dc0586645018…): closing prices, shares, debt at face value, cash including cash set aside, outside shareholders in subsidiaries, bitcoin held, and energised, committed and pipeline megawatts. Its own sources are the companies' quarterly and annual reports filed with the U.S. Securities and Exchange Commission (SEC); see the value-per-megawatt standard. - Signed leases and GPU cloud contracts: 24 contracts. Source of the terms: company filing 20, company statement 3, secondary source 0, our estimate 1. Company filings are public records filed with the SEC; statements are the companies' own press releases, presentations and calls. Terms that rest on a secondary source or on our own estimate are marked on the page and listed as open points until a company filing confirms them; version 1.0 requires a filing for every signed lease.
- Capacity without a lease and operating mining sites: site tables in the companies' quarterly and annual reports and the notes to the site's capacity data. Where a figure is our estimate (the company's total less the sites it lists) the company report says so, and every estimate of mining megawatts carries its rule.
- Assumptions: each with its source (table 3): comparable property deals (a sale-leaseback of a data centre to Amazon at a 7.0% cap rate), the published CleanSpark fair value model v4.1, the site's GPU cloud and data-centre models, the build costs of mining sites filed by Hut 8, Riot and HIVE, and 2026 sales of operating mining sites as a cross-check.
- Tenants the company has not named are not named.
3. Assumptions
| Assumption | Unit | Cautious | Central | Optimistic | Source |
|---|---|---|---|---|---|
| Cap rate: investment-grade tenant | % | 7.5% | 6.5% | 6.0% | Sale-leaseback of a data centre to Amazon at a 7.0% cap rate (16 November 2026); prime properties trade 1.0–1.5 percentage points above the 10-year U.S. Treasury yield. |
| Cap rate: other tenants | % | 9.5% | 8.5% | 7.0% | Investment-grade rate plus 2 percentage points; deals with unrated tenants price 2–3 points wider. |
| Discount rate until a lease is fully running | % | 10.5% | 8.0% | 7.0% | CleanSpark fair value model v4.1. |
| Delay of leases not yet delivered | years | 1 | 0 | 0 | Cautious case: every lease not yet delivered starts one year late. |
| Operating margin where not disclosed | % | 85.0% | 90.0% | 95.0% | Disclosed margins range from 85% to 99%. |
| Build cost where not disclosed | $m per MW of server load | 13.09 | 11.9 | 11.305 | CleanSpark fair value model v4.1 (turnkey AI data centre). |
| GPU contracts: cash margin | % | 80.0% | 85.0% | 88.0% | Site GPU cloud model: cash costs about 15% of revenue at 65% utilisation. |
| GPU contracts: discount rate | % | 18.0% | 14.0% | 12.0% | Site GPU model required return; contracted revenue lowers it. |
| GPU contracts: value of the GPUs at the end | % | 0.0% | 10.0% | 15.0% | Site GPU model: four-year life, 10% left. |
| GPU contracts: GPU cost per dollar of contract | × | 0.598 | 0.598 | 0.598 | IREN and Microsoft: $5.8bn of GPUs for a $9.7bn contract; used where GPU cost is not disclosed. |
| Chance of a lease: letter of intent or exclusivity | % | 5.0% | 45.0% | 60.0% | CleanSpark fair value model v4.1 (Texas exclusivity). |
| Chance of a lease: powered, no tenant | % | 10.0% | 30.0% | 50.0% | Rule from observed leasing: 36% of the available powered capacity found a tenant in the last 12 months; two years to sign (one in the cautious case), at a quarter, half and the full pace, capped at 50%. Reviewed for version 1.0. |
| Chance of a lease: pipeline | % | 0.0% | 5.0% | 15.0% | Our assumption, below the powered chance: a pipeline site first needs a year to secure power. Reviewed for version 1.0. |
| Chance of a lease: own use | % | 0.0% | 0.0% | 0.0% | Rule: not converted. |
| Chance of a lease: cannot be converted | % | 0.0% | 0.0% | 0.0% | Rule: not converted. |
| Reference rent in the first year | $m per MW a year | 1.3949 | 1.3949 | 1.3949 | Sandersville lease: $6.56bn over 20 years with 3% yearly increases for 175 MW. |
| New leases compared with the reference rent | % | 70.0% | 80.0% | 90.0% | CleanSpark fair value model v4.1. |
| Server load per megawatt of grid power | × | 0.6 | 0.7 | 0.75 | Sandersville: 175 MW of server load on 250 MW of grid power. |
| Cap rate on converted capacity | % | 7.5% | 7.0% | 6.5% | Amazon sale-leaseback at 7.0%, plus or minus 0.5 percentage points. |
| Discount rate while building | % | 12.0% | 12.0% | 10.0% | Site data-centre model. |
| New leases fully running: powered capacity | date | 1 January 2031 | 1 January 2030 | 1 January 2030 | Not before 2030; one year later in the cautious case. |
| New leases fully running: pipeline | date | 1 January 2032 | 1 January 2031 | 1 January 2031 | One year after powered capacity. |
| Mining sites: cost to rebuild, without machines | $m per MW | 0.3 | 0.45 | 0.9 | Build costs filed by the companies: $0.24–0.35m per MW for air-cooled sites (Hut 8, Riot), $0.46m for Hut 8's Vega, $0.91m for Riot's Corsicana with its substation. Operating sites sold in 2026 for $0.4–0.7m per MW including machines. |
| Mining machines: multiple of the market value | × | 0.75 | 1 | 1.7433 | Site miner net-asset-value standard v1.2: central price $7.05 per terahash per second, upper level $12.29, cautious case 25% lower. |
| Mining machines: price where the fleet value is missing | $ per TH/s | 7.05 | 7.05 | 7.05 | Same standard: hashrate × $7.05 per terahash per second. |
| Company overhead | $m a year | 45 | 30 | 25 | CleanSpark fair value model v4.1 (overhead of a landlord), the same for every company. |
| Overhead: years of cost counted | × | 10 | 10 | 10 | A perpetuity at 10%. |
| Money owed by related parties | % | 0.0% | 0.0% | 100.0% | Counted only in the optimistic case. |
4. Processing
make_register_r2.pybuilds the capacity breakdown of every company so that it adds up to the company's total, and moves Riot's Corsicana lease, binding since 4 November 2026, to the signed leases.make_register_r3.pyadds the operating mining megawatts of every site, with the rule used for each;make_register_r4.py(edition 0.9.3) corrects CleanSpark from its filings (the disclosed operating income of the Sandersville lease, the tenant and its guarantor, the bitcoin count date and three open points);make_register_r5.py(edition 0.9.4) aligns the mining machines of five companies with the miner NAV pages;make_register_r6.py(edition 0.9.5) moves a site whose purchase had not closed at the data cut to the pipeline;make_register_r7.py(edition 0.9.6) links nineteen leases and GPU contracts to their filings on sec.gov, corrects four of them from the filings and adds HIVE's second GPU contract. Each revision changes only the rows concerned and states why, with the source.build_inputs.pyjoins the register, the assumptions and the market data (whose SHA-256 is checked) into one input file and computes its fingerprint (SHA-256 of the file written in a fixed, canonical form).cvs_validate.pychecks the inputs, runs the Python program (first calculation), builds a spreadsheet of live formulas and has LibreOffice recalculate it (second calculation), compares every value of the two, checks the results and gives the verdict.recompute_independent.pyrecomputes every company from the text of the standard (third route);block_review.pyreviews every company block by block (annex A of the standard).reports.pywrites the page tables and company reports from the program's results, with plain-language names fromconfig/display_en.json; no number is typed by hand.passport.pywrites this passport,datapackage.json, the reproduction kit andSHA256SUMS.txt.
Updates follow section 9 of the standard and config/update_procedure.json: market data daily; balance sheets within 10 business days of a quarterly or annual report; leases, contracts, financings and closed purchases within 5 business days; a full re-cut on the quarterly calendar (28 February, 31 May, 31 August, 30 November). Every new filing of the ten companies is assessed automatically for this valuation by the site's filings check.
5. Checks and results
All checks passed: 0 errors. Spreadsheet CVS_v0.9.6_2026-11-18.xlsx: 1,230 formulas, 0 errors after recalculation; 840 values compared between the two calculations, 0 differences (tolerance one part in a million).
Any error stops publication. Codes are those of the log.
| Code | What is checked | Result |
|---|---|---|
| E1 | The input file has the expected fingerprint | passed |
| E2 | Every contract and site belongs to a covered company and has a source and a source type | passed |
| E3 | Every lease has a term and a yearly rent increase where its income is worked out from the contract value | passed |
| E4 | Tenant credit, status and megawatt basis take allowed values | passed |
| E5 | Every assumption has three scenarios and a valid range; scenario weights add up to 100% | passed |
| E6 | Cautious ≤ central ≤ optimistic, with the chance of a lease and with all capacity leased | passed |
| E7 | No formula error in the spreadsheet; the two calculations agree | passed |
| E8 | Construction still to pay is never negative | passed |
| E9 | Capacity without a lease never earns more on its build cost than the signed leases | passed |
| E10 | Every company's capacity breakdown adds up to its total within 0.5% | passed |
| E11 | The value with all capacity leased is never below the value with the chance of a lease | passed |
| E12 | Mining megawatts of a site are between zero and the site's megawatts | passed |
Open points (19) do not change a number but are being settled; they are shown on the page and in each company report:
- BTDR: Other capacity added in the third quarter of 2026: 140.8 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.
- CLSK: The balance sheet is dated 30 June 2026, more than 120 days before the valuation date; a newer report is expected.
- CLSK: The bitcoin count is from 30 September 2026, more than 45 days before the valuation date (the limit of the site's equity valuation standard); a newer count is expected with the next report.
- CLSK: Rent before the Sandersville lease is fully running is not counted: the company's schedule has $5m in 2027 and $220m in 2028 (about $0.78 a share in the central scenario, discounted at the contract rate); the rule is reviewed for version 1.0.
- CLSK: Part of the Sandersville build was paid before 30 June 2026 (construction in progress at all sites was $81.8m at that date, of which the Sandersville share is not disclosed); the full build cost is deducted while that cash is already gone from the balance sheet, so the value may be up to about $0.30 a share too low until the annual report shows what is left to spend.
- CLSK: Cash includes the net proceeds of the $2,276m Sandersville notes issued at 98.5% on 25 September 2026 ($2,219m after fees, our estimate); part of them reimburses earlier spending and part funds a debt-service reserve.
- CLSK: Other mining sites (Georgia, Tennessee, Wyoming, Mississippi): 665.0 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.
- CORZ: Capacity is counted in megawatts of server load (3,215 MW), as the company reports it; the site's capacity pages show 4,552 MW from the grid, so the two are not directly comparable.
- HIVE: Other operating sites in Canada and Sweden: 115.0 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.
- HIVE: Partial view: mining is most of its business and is valued by the site's miner net-asset-value standard, so this view is not compared with the share price.
- IREN: Mining sites: the 380 MW rest on the 23.2 EH/s fleet of the June quarter, while the quarterly report of 30 September 2026 shows 7.9 EH/s installed; if the idle sites are not counted, the value falls by up to about $0.48 a share in the central scenario.
- IREN: A multi-year GPU cloud contract with a frontier AI lab, signed in August 2026, is not counted: its value is not disclosed (annual report for fiscal 2026). The first-quarter results of fiscal 2027 give contracted revenue of $20.3bn against $15.9bn for the three contracts counted, so the GPU cloud value shown is lower than the company's own total.
- IREN: Childress, Texas — capacity not under GPU contracts: 281.0 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.
- IREN: Partial view: most revenue comes from renting GPUs; the GPU fleet outside the listed contracts is not valued yet, so this view is not compared with the share price.
- MARA: Long Ridge (505 MW, about $1.5bn): the purchase had not closed at the data cut, so the site sits in the pipeline and its price is not deducted; at closing (expected 27 November 2026) the next edition counts it as powered capacity without a tenant and enters the price paid.
- MARA: Partial view: mining is most of its business and is valued by the site's miner net-asset-value standard, so this view is not compared with the share price.
- RIOT: Rockdale, Texas — AMD expansion, 25 MW: the lease terms rest on our own estimate; a company filing is needed to confirm them.
- RIOT: Rockdale, Texas — capacity not under lease: 355.0 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.
-
WULF: Lake Mariner, New York — capacity not under lease: 202.5 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.
-
Regression at release: with mining sites set to zero the program reproduces edition 0.9.1 to the dollar for every company and scenario.
6. Coverage by company
| Company | Type | Share price of | Balance sheet of | Signed contracts (source of the terms) | Capacity, MW | Breakdown difference | Mining sites, MW | Open points |
|---|---|---|---|---|---|---|---|---|
| BTDR Bitdeer Technologies Group | Landlord | 18 November 2026 | 30 September 2026 | 1 leases, 1 GPU cloud contracts (company filing 2) | 3,121 MW of grid power | +0.0 | 1,581.5 | 1 |
| CIFR Cipher Digital Inc. (ex-Cipher Mining) | Landlord | 18 November 2026 | 30 September 2026 | 3 leases, 0 GPU cloud contracts (company filing 2, company statement 1) | 4,300 MW of grid power | +0.0 | 207.0 | 0 |
| CLSK CleanSpark, Inc. | Landlord | 18 November 2026 | 30 June 2026 | 1 leases, 0 GPU cloud contracts (company filing 1) | 1,800 MW of grid power | +0.0 | 665.0 | 6 |
| CORZ Core Scientific, Inc. | Landlord | 18 November 2026 | 30 September 2026 | 3 leases, 0 GPU cloud contracts (company filing 2, company statement 1) | 3,215 MW of server load | +0.0 | 0.0 | 1 |
| HIVE HIVE Digital Technologies Ltd. | Miner (partial view) | 18 November 2026 | 30 September 2026 | 0 leases, 2 GPU cloud contracts (company filing 2) | 860 MW of grid power | +0.0 | 440.0 | 2 |
| HUT Hut 8 Corp. (consolidates American Bitcoin, ABTC) | Landlord | 18 November 2026 | 30 September 2026 | 3 leases, 0 GPU cloud contracts (company filing 3) | 8,569 MW of grid power | +0.0 | 430.0 | 0 |
| IREN IREN Limited | GPU cloud (partial view) | 18 November 2026 | 30 September 2026 | 0 leases, 3 GPU cloud contracts (company filing 2, company statement 1) | 5,000 MW of grid power | +0.0 | 380.0 | 4 |
| MARA MARA Holdings, Inc. | Miner (partial view) | 18 November 2026 | 30 September 2026 | 0 leases, 0 GPU cloud contracts (—) | 4,800 MW of grid power | +0.0 | 1,349.0 | 2 |
| RIOT Riot Platforms, Inc. | Landlord | 18 November 2026 | 30 September 2026 | 4 leases, 0 GPU cloud contracts (company filing 3, our estimate 1) | 2,000 MW of grid power | +0.0 | 587.0 | 2 |
| WULF TeraWulf Inc. | Landlord | 18 November 2026 | 30 September 2026 | 3 leases, 0 GPU cloud contracts (company filing 3) | 3,632 MW of grid power | +0.0 | 145.0 | 1 |
Block review (annex A of the standard, block_review_2026-11-18.json): status of each block for each company — ok, note (a known limitation of the method), open (a document, figure or decision is needed), fix (breaks a rule; corrected before the next edition).
| Company | B1 Signed leases | B2 GPU cloud contracts | B3 Capacity breakdown | B4 Capacity without a lease | B5 Mining sites | B6 Mining machines | B7 Company overhead | B8 Construction money and other assets | B9 Debt, cash and bitcoin | B10 Shares |
|---|---|---|---|---|---|---|---|---|---|---|
| BTDR | ok | note | open | note | note | ok | note | note | note | ok |
| CIFR | note | ok | ok | note | note | open | note | ok | note | ok |
| CLSK | note | ok | open | note | note | ok | note | ok | open | ok |
| CORZ | note | ok | note | note | ok | ok | note | ok | note | ok |
| HIVE | ok | note | open | note | note | ok | note | ok | note | ok |
| HUT | note | ok | ok | note | note | ok | note | ok | note | ok |
| IREN | ok | note | open | note | note | open | note | ok | note | ok |
| MARA | ok | ok | ok | note | note | ok | note | ok | note | ok |
| RIOT | open | ok | open | note | note | ok | note | ok | note | ok |
| WULF | note | ok | open | note | note | ok | note | ok | note | ok |
Findings: 0 to fix, 11 open, 66 notes. Each finding is listed in the company report under «How each block is valued».
7. Reproduction
bash scripts/run_all.sh # in bases/valuation_v0_9; needs Python 3, openpyxl and LibreOffice; no internet access
The input file is rebuilt byte for byte; its fingerprint must be b40059cbfd5980d94d9590bd49d20b176a680e9f969aca8e51c409f4e8acd084. The results and the company reports come out identical on every run (sorted keys, rounded values); the spreadsheet differs only in its internal timestamps. The reproduction kit valuation_reproduction.zip holds the settings, the programs, the standard and the expected fingerprint.
| File | SHA-256 |
|---|---|
| inputs_2026-11-18.json | 62d60f51072eb4a2… |
| cvs_results_2026-11-18.json | e5c4681b459d0594… |
| page_data.json | b9a87b617e05a14f… |
| block_review_2026-11-18.json | bead8169898bfc43… |
| valuation_reproduction.zip | b7fcabce7b0004e7… |
| reports/*.json (10 files) | listed in datapackage.json |
8. Limitations
- Edition 0.9.6, before version 1.0: the chance of a lease for the pipeline, the calibration of the chance for powered sites on observed leasing (rule B4.5) and of the cost to rebuild a mining site on filed build costs (rule B5.4), and the rules for own use and for capacity that cannot be converted are our assumptions and are reviewed for version 1.0.
- Mining sites are counted at the cost to rebuild them, from build costs the companies filed; operating sites sold in 2026 for about $0.4–0.7m per megawatt including the machines, so a site may be worth less than its cost to rebuild where mining earns little.
- One signed lease (Riot's AMD expansion) rests on our own estimate of its value; IREN's August 2026 GPU cloud contract is not counted because its value is not disclosed; estimated remainders of capacity and estimated mining megawatts need confirmation site by site.
- No tax is deducted (values are before tax, as for a real-estate investment trust; recorded as exception VX-2026-02 to the site's equity valuation standard, which asks for three tax regimes); convertible notes are counted at face value without testing conversion; for GPU cloud companies the GPU fleet outside the listed contracts is not valued; Cipher's mining machines at Odessa are not valued.
- The cost of financing new data centres is reflected only in the discount rate while building; new shares and project debt are not modelled, so the build cost is shown against the company's stock-market value instead.
9. Changes
- 0.9 (20 November 2026): first draft — signed leases, GPU cloud contracts, capacity without a lease with a chance of leasing, mining machines; ten companies.
- 0.9.1 (20 November 2026): capacity breakdown for every company; value with all capacity leased, its build cost and the share priced in; Riot's Corsicana lease, binding since 4 November 2026, moved to signed leases.
- 0.9.2 (20 November 2026): operating mining sites at the cost to rebuild them per megawatt; each megawatt counted once, as a mining site or as a data centre; pages with company reports, in plain language, under Mining; published on 20 November 2026 with the owner's approval.
- 0.9.3 (20 November 2026): register r4 — CleanSpark checked against its filings: the Sandersville lease uses the operating income the company discloses for 2029, its first full year ($254m, investor presentation of 17 September 2026) instead of rent worked back from the contract value ($241.7m); tenant Anviran, LLC with Meta's guarantee; bitcoin count dated 30 September 2026; three open points with their size. Pages show which scenario supplies most of the weighted average. The CleanSpark fair value model v4.1 (/valuation/clsk/) is withdrawn in favour of this valuation; its files stay in the library as an archive.
- 0.9.4 (21 November 2026): register r5 — a cross-check of every report against the other pages of the site found the mining machines of five companies out of step with the miner NAV pages: HIVE and RIOT now carry the fleet value of the NAV results of 16 November (184.6 and 228.4 instead of 176.6 and 225.9 $m), MARA, IREN and WULF the installed hashrate of their 30 September quarterly reports (71.2, 7.9 and 9.8 EH/s instead of 70.3, 23.2 and 10.6) at the K3 level of $7.05 per TH; IREN gets an open point on its idle mining sites. A third route checks every number: an independent recomputation written from the text of the standard (
recompute_independent.py). Each report now shows the three routes and how its figures agree with the other pages of the site. - 0.9.5 (21 November 2026): standard 0.9.5 — the rules arranged block by block (ten blocks, each with its formula, inputs, sources, rules and checks) and an order of loading and updating information (five layers, re-cut calendar and triggers, deadlines;
config/update_procedure.json). Every company reviewed block by block (annex A,block_review.py). Register r6: MARA's Long Ridge site, whose purchase had not closed at the data cut, moves from powered capacity to the pipeline until closing (rule B3.4); MARA's central value falls by about $0.31 a share. Source links are tested against the source type: rows rated as a company filing or statement but linked only to news reports are open points. - 0.9.6 (21 November 2026): standard 0.9.6, approved by the owner on 21 November 2026 — the chance of a lease for powered sites follows the leasing observed over the last twelve months (rule B4.5: 10% / 30% / 50%, was 5% / 20% / 35%; pipeline 0% / 5% / 15%, was 0% / 0% / 10%); the cost to rebuild a mining site comes from build costs filed by Hut 8, Riot and HIVE (rule B5.4: $0.30m / $0.45m / $0.90m per MW, was $0.70m / $0.85m / $1.00m from an industry report). Register r7: nineteen leases and GPU contracts linked to their filings on sec.gov (annex C of the standard); Cipher's Stingray lease triple-net with rent from April and May 2027; the AMD credit support of Core Scientific's cloud tenant is not a guarantee (cap rate of other tenants); TeraWulf's Core42 lease from its disclosed rent ($1,031.7m); Riot's AMD expansion fully running in May 2027; HIVE's second GPU contract (about $220m) added; an open point for IREN's August 2026 contract, whose value is not disclosed.
10. Licence