DIGITAL INFRASTRUCTURE / INVESTMENT INTELLIGENCERESEARCH PLATFORM · DATA CENTER FULL CYCLE INDEX · DATA AS OF 23 NOV 2026 · PUBLICATION LOG
MINING · VALUATION · EDITION 0.9.6 · COMPANY REPORT

HIVE Digital Technologies Ltd. (HIVE): what a share is worth

How the value per share of HIVE Digital Technologies Ltd. is built in three scenarios: every signed lease with its source, every megawatt the company reports, the chance of new leases, its mining sites and its balance sheet. Data as of 18 Nov 2026.

Edition 0.9.6 · published 21 Nov 2026Data as of 18 Nov 2026Checks passed: 0 errorsInput fingerprint b40059cbfd59…

Edition 0.9.6 — partial view. Mining is most of its business and is valued by the site's miner net-asset-value standard, so this view is not compared with the share price. Values are model results from company filings, company statements and dated market data, before tax (exception VX-2026-02 to the equity valuation standard), not price targets; nothing here is investment advice.

$0.34value per share, central scenario
$0.00 – $3.77cautious to optimistic; weighted average $0.96
$1.41share price on 18 Nov 2026 (data cut), for reference. Latest close $1.34 on 23 Nov 2026 (−5.0%)
50%share of unleased capacity the share price treats as leased
Checked. Calculated three ways — engine, spreadsheet of formulas and a separate script from the text of the standard — with no difference larger than 0e+00 dollars a share. Compared with 4 other pages of the site that show HIVE: 13 figures agree, 3 differ for a stated reason. See the list →

Summary

This is a partial view. Mining is most of its business and is valued by the site's miner net-asset-value standard, so this view is not compared with the share price. In the central scenario it gives $0.34 a share; the share price, $1.41 on 18 November 2026, is shown for reference only. Per share: GPU cloud contracts $0.16, the chance of new leases on capacity that has none yet $0.31, mining sites at the cost to rebuild them $0.72, mining machines $0.67; less company overhead $1.08, and debt and other claims net of cash and bitcoin $0.43.

The share price is consistent with leasing 50% of the capacity that has no lease yet (for reference only); the central scenario assumes 11% when weighted by value.

Leasing all convertible capacity would need about $7.16bn of building work, 18.3 times the company's stock-market value, and would give $2.77 a share in the central scenario. In the cautious scenario new building does not pay for itself, so the value with all capacity leased is $0.00.

440 MW of mining sites are counted at $0.45m per MW, the cost to rebuild them without the machines: $198m in total. At $0.5m per MW, the level at which operating sites sold in 2026, the central value would be $0.40 a share.

How the value adds up

Central scenario, US dollars per share

Green adds, orange subtracts; the blue bar is the value per share before the floor at zero; the dashed line is the share price on 18 Nov 2026.

HIVE Digital Technologies Ltd.: how the central value per share adds upBars in US dollars per share for the central scenario: each part adds or subtracts, the last bar is the value per share; the dashed line is the share price.$0.0$0.5$1.0$1.5GPU cloud contracts: $0.16 per share ($43m)$0.16GPUcontractsChance of new leases on capacity without a lease: $0.31 per share ($86m)$0.31NewleasesMining sites at the cost to rebuild them: $0.72 per share ($198m)$0.72MiningsitesMining machines at market value: $0.67 per share ($185m)$0.67MachinesCompany overhead: −$1.08 per share (−$300m)−$1.08OverheadCash and bitcoin, less debt and other claims: −$0.43 per share (−$118m)−$0.43Debt lesscashValue per share before the floor at zero: $0.34$0.34Valueshare price$1.41
Part of the valueCautious, totalCentral, totalOptimistic, totalCautious, $ a shareCentral, $ a shareOptimistic, $ a share
Signed leases$0m$0m$0m$0.00$0.00$0.00
GPU cloud contracts$14m$43m$61m$0.05$0.16$0.22
Chance of new leases on capacity without a lease$0m$86m$634m$0.00$0.31$2.29
Mining sites at the cost to rebuild them$132m$198m$396m$0.48$0.72$1.43
Mining machines at market value$138m$185m$322m$0.50$0.67$1.16
Company overhead−$450m−$300m−$250m−$1.63−$1.08−$0.90
Construction money already raised and set aside$0m$0m$0m$0.00$0.00$0.00
Money owed by related parties$0m$0m$0m$0.00$0.00$0.00
Cash and bitcoin, less debt and other claims−$118m−$118m−$118m−$0.43−$0.43−$0.43
Value of the shares−$284m$94m$1.04bn$0.00$0.34$3.77

276.9 million shares, including warrants that cost almost nothing to exercise. Value per share never goes below zero; the chart shows the value before that floor. Stock-market value of the company: $390m.

How each block is valued for HIVE

The ten blocks of the standard, in order, with what is counted for HIVE Digital Technologies Ltd., its central value per share and the findings of this edition's review. OK rules met with company documents · Limit a known limit of the method · Open a document, figure or decision is needed · Fix a rule is broken.

Block and ruleWhat is countedCentral, $ a shareStatusFindings
Signed leasesA year of operating income ÷ cap rate by tenant credit, discounted to the year the lease is fully running, less construction still to pay.none$0.00OK
  • No signed data-centre lease.
GPU cloud contractsCash margin over the contract, plus what the GPUs are worth at the end, less the GPUs not yet delivered.2 contracts, $250m$0.16Limit
  • Bell Canada AI cloud, 2 years: GPU cost not disclosed; 0.598 × contract value is used.
  • Bell Canada AI cloud for Cohere, 3 years: GPU cost not disclosed; 0.598 × contract value is used.
Capacity breakdownEvery megawatt the company reports in one status; the statuses add up to the company's total within 0.5%.860 MW of grid power in 7 statuses—Open
  • Other operating sites in Canada and Sweden: 115.0 MW is our estimate (company total less the sites it lists).
Capacity without a leaseChance of a lease × (data-centre value after its full build cost − the mining site it replaces), never below zero.860 MW that could be leased$0.31Limit
  • Chances of a lease for powered sites (30% central, calibrated on observed leasing, rule B4.5) and the pipeline (5% central, our assumption) are one chance per status, reviewed for version 1.0.
Mining sitesOperating mining megawatts × the cost to rebuild one megawatt, without machines; leased megawatts carry no mining value.440 MW$0.72Limit
  • 440 MW at $0.45m per MW, the cost to rebuild from filed build costs (rule B5.4); operating sites sold for about $0.4–0.7m per MW including machines in 2026.
Mining machinesFleet value from the site's miner net asset value standard, or installed hashrate × $7.05 per terahash per second.$185m$0.67OK—
Company overheadA landlord's yearly overhead × 10, the same for every company.$300m−$1.08Limit
  • $30m a year × 10 in the central scenario for every company; the company's own overhead and share-based pay are used from version 1.0.
Construction money and other assetsConstruction money already raised and set aside is deducted; money owed by related parties counts only in the optimistic scenario.—$0.00OK
  • Nothing to count.
Debt, cash and bitcoinDebt at face value, outside shareholders and customer prepayments are subtracted; cash and bitcoin at market are added.balance sheet of 30 September 2026−$0.43Limit
  • 4 figures updated after the balance sheet from filed documents (the site's interim inputs).
  • Reports under IFRS on forms 6-K, 40-F: read from the documents directly, without the machine-readable cross-check used for US filers.
  • Values are before tax, as for a real-estate investment trust; a tax deduction comes with version 1.0.
SharesShares outstanding plus warrants that cost almost nothing to exercise.276.9 million—OK
  • 276.9 million shares.

The values add up to the central value per share before the floor at zero ($0.34). Findings marked «Open» are also listed under Open points when they concern a figure of this report.

Signed leases and GPU cloud contracts

The company has no signed data-centre lease.

GPU cloud contractContract valueYearsStartsCost of the GPUs (central)Not yet deliveredValue, cautiousValue, centralValue, optimisticSource of the terms
Bell Canada AI cloud, 2 yearsRunning since May 2026; about $30m over two years.$30m21 May 2026$18m our estimate0%$19m$22m$24mCompany filing
Bell Canada AI cloud for Cohere, 3 yearsAbout $220m; 2,304 GB200 GPUs going live from late 2026 to early 2027, so counted from January 2027. GPU cost not disclosed: estimated at 0.598 × contract value, all still to spend.$220m31 Jan 2027$132m our estimate100%−$5m$21m$36mCompany filing

A GPU cloud contract is valued as its cash margin over the contract's life, plus what the GPUs are still worth at the end, less the part of the GPUs not yet delivered and paid for.

Capacity breakdown

Total: 860 MW of grid power. 440 MW energised, plus 100 MW at Yguazú and 320 MW in the Greater Toronto Area (results for the second quarter of fiscal 2027). The statuses below add up to 860.0 MW (difference +0.0).

StatusMWof which mining sitesMining sites (central)Value with the chance of a lease (central)Value if all leased (central)Build cost if all leased (central)
GPU cloud contractCapacity used for signed contracts to rent out GPU computing.0.0——$43m$43m—
Letter of intent or exclusivityA tenant has signed a letter of intent, an exclusivity, a reservation right or a right of first offer, but no lease yet.25.025.0$11m$20m$30m$208m
Powered, no tenantPower is connected or contracted, but there is no tenant.215.0215.0$97m$146m$260m$1.79bn
PipelineGrid queue, development, due diligence or a purchase not yet closed: no power under the company's control and no tenant yet.620.0200.0$90m$119m$668m$5.16bn

For signed leases and GPU cloud contracts the value columns show the contracts themselves. For the other statuses they show the mining sites plus what a new lease would add over them.

Capacity without a lease

Site or groupStatusMWCompany's shareMining sites, MWChance of a lease: cautious / central / optimisticData-centre value (central)Mining sites (central)Added value with the chance (central)Added value if leased (central)Build cost if leased (central)
Boden, Sweden — letter of intent for colocationEnergised.Letter of intent or exclusivity25.0100%25.05% / 45% / 60%$30m$11m$9m$19m$208m
New Brunswick, Canada — candidate for an AI data hallEnergised.Powered, no tenant100.0100%100.010% / 30% / 50%$121m$45m$23m$76m$833m
Other operating sites in Canada and Sweden our estimateOur estimate: 440 MW energised less the sites listed. Energised.Powered, no tenant115.0100%115.010% / 30% / 50%$139m$52m$26m$87m$958m
Yguazú, Paraguay200 MW energised; 100 MW more due in late 2026 not counted.Pipeline300.0100%200.00% / 5% / 15%$323m$90m$12m$233m$2.50bn
Toronto area — planned sitePipeline320.0100%—0% / 5% / 15%$345m—$17m$345m$2.67bn

Data-centre value: the company's share × megawatts of server load × what one megawatt of AI data centre is worth after paying its full build cost. In the central scenario that is $1.72m per megawatt of server load for powered sites and sites with a letter of intent, and $1.54m for the pipeline; in the cautious scenario it is zero, because new building does not earn its cost. Server load is taken as 70% of grid power in the central scenario. Added value = chance of a lease × (data-centre value − mining sites it replaces), and never below zero.

If all capacity were leased

MeasureCautiousCentralOptimistic
Added value with the chance of a lease, $ a share$0.00$0.31$2.29
Added value if all capacity were leased, $ a share$0.00$2.74$9.39
Value per share with the chance of a lease$0.00$0.34$3.77
Value per share if all capacity were leased$0.00$2.77$10.87

Weighted average if all capacity were leased: $3.84. Building it would cost $7.16bn in the central scenario, 18.4 times the company's stock-market value. Share of the unleased capacity that the share price treats as leased: 50% (for reference only).

Central value per share against the share of unleased capacity that gets leased

The same chance applied to every site without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.

HIVE Digital Technologies Ltd.: central value per share against the share of unleased capacity that gets leasedCentral value per share if the same chance, from 0% to 100%, applied to all capacity without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.$0.0$0.6$1.2$1.8$2.4$3.10%20%40%60%80%100%0% of the capacity without a lease leased: $0.03 a share10% of the capacity without a lease leased: $0.30 a share20% of the capacity without a lease leased: $0.58 a share30% of the capacity without a lease leased: $0.85 a share40% of the capacity without a lease leased: $1.13 a share50% of the capacity without a lease leased: $1.40 a share60% of the capacity without a lease leased: $1.68 a share70% of the capacity without a lease leased: $1.95 a share80% of the capacity without a lease leased: $2.22 a share90% of the capacity without a lease leased: $2.50 a share100% of the capacity without a lease leased: $2.77 a shareshare price $1.41matches the share price: 50%all leased: $2.77central: $0.34

Mining

ItemCautiousCentralOptimistic
Operating mining sites, 440.0 MW, at the cost to rebuild them$132m at $0.30m per MW$198m at $0.45m per MW$396m at $0.90m per MW
Mining machines at market value$138m$185m$322m

Fleet value from the site's miner net asset value standard (version 1.2). The cost to rebuild a site excludes the machines. Operating sites sold in 2026 for about $0.4–0.7m per megawatt including the machines; the central value with sites at $0.5m per megawatt is under What moves the result.

Balance sheet and market data

Share price (18 Nov 2026)$1.41Balance sheet date30 Sep 2026
Debt at face value$275mCash, including cash set aside$141m
Outside shareholders in subsidiaries$0mBitcoin held269 BTC = $17m
Customer prepayments, counted as debt$0mConstruction money already raised (central)$0m
Shares, million276.9MW on the site's capacity pages: energised / committed / pipeline440 / 540 / 860

Mining brings about 91% of revenue. Two GPU cloud contracts with Bell Canada are counted: B200 GPUs running since May 2026 and GB200 GPUs for Cohere from early 2027.

What moves the result

Change, central scenarioValue per shareDifference
Central scenario as it is$0.34
No new leases on capacity without a lease$0.03−$0.31
Cap rates 0.5 percentage points lower$0.56$0.22
Cap rates 0.5 percentage points higher$0.15−$0.19
Chances of new leases doubled$0.55$0.21
Build cost 10% higher$0.10−$0.24
Mining sites at $0.5m per MW (level of 2026 site sales)$0.40$0.06
Mining sites not counted$0.00−$0.34

Updates

Data cut of this edition18 Nov 2026 (balance sheet of 30 Sep 2026; 6-K, 40-F)
Latest close and market value$1.34 on 23 Nov 2026; market value $371m (at the data cut $1.41 and $390m) — loaded every US trading day at 04:00 Moscow time
Next report expectednot in the EDGAR calendar (reports on forms 6-K, 40-F)
Next edition due30 Nov 2026 — quarterly re-cut
Since the data cutbitcoin −2.8%; share count +0.0% (new edition when bitcoin moves more than 20% or the share count more than 5%)

SEC filings since the data cut

No filing since 18 Nov 2026 (EDGAR checked 24 Nov 2026).

Each new filing is assessed automatically for this valuation: a quarterly or annual report means a new edition within 10 business days; a new lease, letter of intent, GPU contract, financing or closed purchase within 5. All filings of HIVE are in the SEC filings feed; the order of updates is section 9 of the standard.

Does this report agree with the rest of the site?

Every figure that another page of the site also shows for HIVE, side by side. Same: equal within rounding. Explained: different by rule — a later share price on a daily page, face value of debt here against carrying value on the company card, issues or repayments after the balance sheet, another source for the share count. To check: a difference without a stated reason.

PageWhat is comparedThis reportOther pageResult
Valuation summary tableValues per share in the table of all companies$0.34 central$0.34 centralSame
This reportParts of the value add up to the value of the sharesthree scenariossum of the partsSame
Formula workbookSame numbers in the spreadsheet of formulas840 values, all companies0 differencesSame
Independent recomputationSame numbers from a separate script written from the standard4 valueslargest difference 0e+00Same
Value per MWBalance-sheet date2026-09-302026-09-30Same
Value per MWDebt, $m275.4275.4Same
Value per MWCash incl. restricted, $m140.6140.6Same
Value per MWBitcoin held269269Same
Value per MWMW operating (D1)440.0440.0Same
Value per MWMW of grid power (D3)860860Same
Value per MWShares, million276.9276.9Same
Value per MWShare price$1.41 on 2026-11-18$1.34 on 2026-11-23Explained the daily page shows the latest close; this edition uses the close of its data cut (shown as Latest close on this page)
Company card · net debtDebt, $m275.4 (face value)237.9 (carrying value, 2026-09-30)Explained face value 275.4 against carrying value 237.9 (+37.5: discounts, issue costs or instruments the card does not tag)
Company card · net debtCash incl. restricted and short-term investments, $m140.6139.0 (2026-09-30)Explained cash from issues after the balance sheet +1.6
Miner NAVMining machines at market value, $m184.6184.6 (NAV v1.2, 2026-11-16)Same
Company card · market dataShares behind the market value, million276.9 (latest quarterly report)275.4 (market-data vendor)Same

Open points

  • Other operating sites in Canada and Sweden: 115.0 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.
  • Partial view: mining is most of its business and is valued by the site's miner net-asset-value standard, so this view is not compared with the share price.

Sources

  1. Quarterly report on form quarterly report (form 10-Q) for the quarter to 30 September 2026 — sec.gov
  2. Current report on form 8-K of 22 June 2026, exhibit 99.1 — sec.gov
  3. Quarterly report on form quarterly report (form 10-Q) for the quarter to 30 September 2026 (GPU loan of $128.9m) — sec.gov
  4. The site's lease register
  5. Our estimate
  6. The site's capacity data
  7. Share price, balance sheet and capacity: the site's market data file of 18 Nov 2026 (src/data/mining/capacity_daily.json, frozen copy).
  8. Latest close: the same market data file as it rolls daily (src/data/mining/capacity_daily.json); it moves the price comparison only, not the value per share.
  9. Assumptions and their sources: assumptions of the three scenarios; rules: the standard.