DIGITAL INFRASTRUCTURE / INVESTMENT INTELLIGENCERESEARCH PLATFORM · DATA CENTER FULL CYCLE INDEX · DATA AS OF 23 NOV 2026 · PUBLICATION LOG
MINING · VALUATION · EDITION 0.9.6 · COMPANY REPORT

Core Scientific, Inc. (CORZ): what a share is worth

How the value per share of Core Scientific, Inc. is built in three scenarios: every signed lease with its source, every megawatt the company reports, the chance of new leases, its mining sites and its balance sheet. Data as of 18 Nov 2026.

Edition 0.9.6 · published 21 Nov 2026Data as of 18 Nov 2026Checks passed: 0 errorsInput fingerprint b40059cbfd59…

Edition 0.9.6. Values are model results from company filings, company statements and dated market data, before tax (exception VX-2026-02 to the equity valuation standard), not price targets; nothing here is investment advice.

$23.33value per share, central scenario
$5.77 – $48.37cautious to optimistic; weighted average $24.83, +77% against the share price
$14.05share price on 18 Nov 2026 (data cut), within the range. Latest close $12.36 on 23 Nov 2026 (−12.0%): weighted average +101% against it
9.4%cap rate on the signed leases that matches the share price
Checked. Calculated three ways — engine, spreadsheet of formulas and a separate script from the text of the standard — with no difference larger than 0e+00 dollars a share. Compared with 3 other pages of the site that show CORZ: 13 figures agree, 2 differ for a stated reason. See the list →

Summary

In the central scenario the model values Core Scientific, Inc. at $23.33 a share; the share price was $14.05 on 18 November 2026. Per share the value adds up as follows: signed leases $30.20, the chance of new leases on capacity that has none yet $4.60; less company overhead $0.93, and debt and other claims net of cash and bitcoin $10.54.

Across the three scenarios the value runs from $5.77 (cautious) to $48.37 (optimistic). Weighting them 20%, 60% and 20% gives $24.83, 77% above the share price; the price is within the range. The central scenario supplies 56% of the weighted average.

The share price is consistent with valuing the signed leases at a 9.4% cap rate (a year's operating income divided by the property value), against 6.5% for investment-grade tenants and 8.5% for other tenants in the central scenario. A higher cap rate means a lower value.

The share price is below the value of the signed leases and the mining sites as they are, so it includes nothing for new leases on the capacity that has none yet.

Leasing all convertible capacity would need about $24.94bn of building work, 5.5 times the company's stock-market value, and would give $29.95 a share in the central scenario. In the cautious scenario new building does not pay for itself, so the value with all capacity leased is $5.77.

How the value adds up

Central scenario, US dollars per share

Green adds, orange subtracts; the blue bar is the value per share before the floor at zero; the dashed line is the share price on 18 Nov 2026.

Core Scientific, Inc.: how the central value per share adds upBars in US dollars per share for the central scenario: each part adds or subtracts, the last bar is the value per share; the dashed line is the share price.$0$10$20$30Signed leases: $30.20 per share ($9.73bn)$30.20LeasesChance of new leases on capacity without a lease: $4.60 per share ($1.48bn)$4.60NewleasesCompany overhead: −$0.93 per share (−$300m)−$0.93OverheadCash and bitcoin, less debt and other claims: −$10.54 per share (−$3.40bn)−$10.54Debt lesscashValue per share before the floor at zero: $23.33$23.33Valueshare price$14.05
Part of the valueCautious, totalCentral, totalOptimistic, totalCautious, $ a shareCentral, $ a shareOptimistic, $ a share
Signed leases$5.71bn$9.73bn$13.26bn$17.71$30.20$41.15
GPU cloud contracts$0m$0m$0m$0.00$0.00$0.00
Chance of new leases on capacity without a lease$0m$1.48bn$5.97bn$0.00$4.60$18.53
Mining sites at the cost to rebuild them$0m$0m$0m$0.00$0.00$0.00
Mining machines at market value$0m$0m$0m$0.00$0.00$0.00
Company overhead−$450m−$300m−$250m−$1.40−$0.93−$0.78
Construction money already raised and set aside$0m$0m$0m$0.00$0.00$0.00
Money owed by related parties$0m$0m$0m$0.00$0.00$0.00
Cash and bitcoin, less debt and other claims−$3.40bn−$3.40bn−$3.40bn−$10.54−$10.54−$10.54
Value of the shares$1.86bn$7.52bn$15.59bn$5.77$23.33$48.37

322.2 million shares, including warrants that cost almost nothing to exercise. Value per share never goes below zero; the chart shows the value before that floor. Stock-market value of the company: $4.53bn.

How each block is valued for CORZ

The ten blocks of the standard, in order, with what is counted for Core Scientific, Inc., its central value per share and the findings of this edition's review. OK rules met with company documents · Limit a known limit of the method · Open a document, figure or decision is needed · Fix a rule is broken.

Block and ruleWhat is countedCentral, $ a shareStatusFindings
Signed leasesA year of operating income ÷ cap rate by tenant credit, discounted to the year the lease is fully running, less construction still to pay.3 leases, 1,119 MW of server load$30.20Limit
  • AMD — 377 MW, 15 years: neither operating income nor margin is disclosed; the standard margin (90% central) is used.
  • AMD — 377 MW, 15 years: construction cost not disclosed; the standard $11.9m per megawatt of server load is used.
  • Cloud provider with an AMD credit-support agreement — 152 MW, 15 years: neither operating income nor margin is disclosed; the standard margin (90% central) is used.
  • Cloud provider with an AMD credit-support agreement — 152 MW, 15 years: construction cost not disclosed; the standard $11.9m per megawatt of server load is used.
GPU cloud contractsCash margin over the contract, plus what the GPUs are worth at the end, less the GPUs not yet delivered.none$0.00OK—
Capacity breakdownEvery megawatt the company reports in one status; the statuses add up to the company's total within 0.5%.3,215 MW of server load in 7 statuses—Limit
  • Counted in megawatts of server load (3,215 MW) as the company reports it; the site's capacity pages use grid megawatts (4,552 MW).
Capacity without a leaseChance of a lease × (data-centre value after its full build cost − the mining site it replaces), never below zero.2,096 MW that could be leased$4.60Limit
  • Chances of a lease for powered sites (30% central, calibrated on observed leasing, rule B4.5) and the pipeline (5% central, our assumption) are one chance per status, reviewed for version 1.0.
Mining sitesOperating mining megawatts × the cost to rebuild one megawatt, without machines; leased megawatts carry no mining value.none$0.00OK
  • No operating mining site counted.
Mining machinesFleet value from the site's miner net asset value standard, or installed hashrate × $7.05 per terahash per second.none$0.00OK
  • No machines counted: mining fleet held for sale, no hashrate disclosed.
Company overheadA landlord's yearly overhead × 10, the same for every company.$300m−$0.93Limit
  • $30m a year × 10 in the central scenario for every company; the company's own overhead and share-based pay are used from version 1.0.
Construction money and other assetsConstruction money already raised and set aside is deducted; money owed by related parties counts only in the optimistic scenario.—$0.00OK
  • Nothing to count.
Debt, cash and bitcoinDebt at face value, outside shareholders and customer prepayments are subtracted; cash and bitcoin at market are added.balance sheet of 30 September 2026−$10.54Limit
  • 3 figures updated after the balance sheet from filed documents (the site's interim inputs).
  • Customer prepayments of $654m counted as debt, because the full contract value is counted.
  • Values are before tax, as for a real-estate investment trust; a tax deduction comes with version 1.0.
SharesShares outstanding plus warrants that cost almost nothing to exercise.322.2 million—OK
  • 322.2 million shares.

The values add up to the central value per share before the floor at zero ($23.33). Findings marked «Open» are also listed under Open points when they concern a figure of this report.

Signed leases and GPU cloud contracts

LeaseMW of server loadContract valueTermOperating income, year 1 (central)Tenant creditCap rate (central)Fully running fromConstruction still to pay (central)Value, cautiousValue, centralValue, optimisticSource of the terms
CoreWeave — about 590 MW, 12-year licences485 MW were billing at 30 September 2026. The remaining 105 MW at $4m per MW (our estimate: CoreWeave pays most of the conversion). Operating margin 87.7% from the third-quarter 2026 segment data, on revenue without pass-through power.590$10.20bn12 years, rent +3% a year$630mnot investment grade8.5%1 Mar 2027$420m$5.45bn$6.84bn$8.42bnCompany statement
AMD — 377 MW, 15 yearsContract value is this lease's share, by megawatts, of the $14bn the company reported for about 530 MW.377$9.98bn15 years, rent +3% a year$483minvestment grade6.5%1 Jan 2028$4.49bn$482m$2.52bn$3.77bnCompany filing
Cloud provider with an AMD credit-support agreement — 152 MW, 15 yearsThe rest of the same $14bn. Not treated as investment grade: AMD may cure the tenant's defaults but is not obliged to (current report of 27 July 2026).152$4.02bn15 years, rent +3% a year$195mnot investment grade8.5%1 Jan 2028$1.81bn−$223m$369m$1.07bnCompany filing

Operating income, year 1: the figure the company discloses, or the first-year rent times the operating margin; where only the total contract value is known, the first-year rent is worked back from it with the yearly rent increase. Cap rate: a year's operating income divided by the property value; it is lower for tenants with an investment-grade credit rating. Source of the terms: a company filing or statement confirms a lease; terms from a secondary source or our own estimate are marked and listed as open points until a filing confirms them. The documents behind each lease are listed under Sources.

Capacity breakdown

Total: 3,215 MW of server load. 1,675 MW of leasable server load, plus about 1,540 MW of server load reserved for AMD outside it: 600 MW from a load study and 940 MW supplied behind the meter, that is directly and not through the grid (quarterly report for the third quarter of 2026; exhibit 99.2 to a current report on form 8-K). The statuses below add up to 3,215.0 MW (difference +0.0).

StatusMWof which mining sitesMining sites (central)Value with the chance of a lease (central)Value if all leased (central)Build cost if all leased (central)
Signed leaseA signed lease or colocation contract for an AI or high-performance computing data centre.1,119.0——$9.73bn$9.73bn—
Letter of intent or exclusivityA tenant has signed a letter of intent, an exclusivity, a reservation right or a right of first offer, but no lease yet.1,540.0——$1.20bn$2.66bn$18.33bn
Powered, no tenantPower is connected or contracted, but there is no tenant.556.0——$288m$959m$6.62bn

For signed leases and GPU cloud contracts the value columns show the contracts themselves. For the other statuses they show the mining sites plus what a new lease would add over them.

Capacity without a lease

Site or groupStatusMWCompany's shareMining sites, MWChance of a lease: cautious / central / optimisticData-centre value (central)Mining sites (central)Added value with the chance (central)Added value if leased (central)Build cost if leased (central)
AMD's right to reserve further capacity (until 28 December 2028)Letter of intent or exclusivity1,540.0 server load100%—5% / 45% / 60%$2.66bn—$1.20bn$2.66bn$18.33bn
Capacity ready to lease but not yet leasedPowered, no tenant556.0 server load100%—10% / 30% / 50%$959m—$288m$959m$6.62bn

Data-centre value: the company's share × megawatts of server load × what one megawatt of AI data centre is worth after paying its full build cost. In the central scenario that is $1.72m per megawatt of server load for powered sites and sites with a letter of intent, and $1.54m for the pipeline; in the cautious scenario it is zero, because new building does not earn its cost. Server load is taken as 70% of grid power in the central scenario. Added value = chance of a lease × (data-centre value − mining sites it replaces), and never below zero.

If all capacity were leased

MeasureCautiousCentralOptimistic
Added value with the chance of a lease, $ a share$0.00$4.60$18.53
Added value if all capacity were leased, $ a share$0.00$11.22$32.32
Value per share with the chance of a lease$5.77$23.33$48.37
Value per share if all capacity were leased$5.77$29.95$62.16

Weighted average if all capacity were leased: $31.55. Building it would cost $24.94bn in the central scenario, 5.5 times the company's stock-market value. Share of the unleased capacity that the share price treats as leased: none — the price is below the value of what is signed and the mining sites as they are.

Central value per share against the share of unleased capacity that gets leased

The same chance applied to every site without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.

Core Scientific, Inc.: central value per share against the share of unleased capacity that gets leasedCentral value per share if the same chance, from 0% to 100%, applied to all capacity without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.$0$7$13$20$26$330%20%40%60%80%100%0% of the capacity without a lease leased: $18.73 a share10% of the capacity without a lease leased: $19.85 a share20% of the capacity without a lease leased: $20.98 a share30% of the capacity without a lease leased: $22.10 a share40% of the capacity without a lease leased: $23.22 a share50% of the capacity without a lease leased: $24.34 a share60% of the capacity without a lease leased: $25.46 a share70% of the capacity without a lease leased: $26.58 a share80% of the capacity without a lease leased: $27.71 a share90% of the capacity without a lease leased: $28.83 a share100% of the capacity without a lease leased: $29.95 a shareshare price $14.05all leased: $29.95central: $23.33

Mining

ItemCautiousCentralOptimistic
Operating mining sites, 0.0 MW, at the cost to rebuild them$0m at $0.30m per MW$0m at $0.45m per MW$0m at $0.90m per MW
Mining machines at market value$0m$0m$0m

The mining fleet is held for sale and no hashrate is disclosed, so no machine value is counted. The cost to rebuild a site excludes the machines. Operating sites sold in 2026 for about $0.4–0.7m per megawatt including the machines; the central value with sites at $0.5m per megawatt is under What moves the result.

Balance sheet and market data

Share price (18 Nov 2026)$14.05Balance sheet date30 Sep 2026
Debt at face value$4.38bnCash, including cash set aside$1.64bn
Outside shareholders in subsidiaries$0mBitcoin held32 BTC = $2m
Customer prepayments, counted as debt$654mConstruction money already raised (central)$0m
Shares, million322.2MW on the site's capacity pages: energised / committed / pipeline630 / 1,456 / 4,552

CoreWeave's prepayments at 30 June 2026 are counted as debt (quarterly report for the second quarter). AMD's 30 million warrants at $23.47 are above the share price and are left out.

What moves the result

Change, central scenarioValue per shareDifference
Central scenario as it is$23.33
No new leases on capacity without a lease$18.73−$4.60
Cap rates 0.5 percentage points lower$29.19$5.85
Cap rates 0.5 percentage points higher$18.24−$5.10
Chances of new leases doubled$27.93$4.60
Build cost 10% higher$18.96−$4.37
Mining sites at $0.5m per MW (level of 2026 site sales)$23.33$0.00
Mining sites not counted$23.33$0.00

Updates

Data cut of this edition18 Nov 2026 (balance sheet of 30 Sep 2026; 10-Q, 10-K, 8-K)
Latest close and market value$12.36 on 23 Nov 2026; market value $3.98bn (at the data cut $14.05 and $4.53bn) — loaded every US trading day at 04:00 Moscow time
Next report expected24 Feb 2027 — Earnings release (estimated from the same report a year earlier)
Next edition due30 Nov 2026 — quarterly re-cut
Since the data cutbitcoin −2.8%; share count +0.0% (new edition when bitcoin moves more than 20% or the share count more than 5%)

SEC filings since the data cut

No filing since 18 Nov 2026 (EDGAR checked 24 Nov 2026).

Each new filing is assessed automatically for this valuation: a quarterly or annual report means a new edition within 10 business days; a new lease, letter of intent, GPU contract, financing or closed purchase within 5. All filings of CORZ are in the SEC filings feed; the order of updates is section 9 of the standard.

Does this report agree with the rest of the site?

Every figure that another page of the site also shows for CORZ, side by side. Same: equal within rounding. Explained: different by rule — a later share price on a daily page, face value of debt here against carrying value on the company card, issues or repayments after the balance sheet, another source for the share count. To check: a difference without a stated reason.

PageWhat is comparedThis reportOther pageResult
Valuation summary tableValues per share in the table of all companies$23.33 central$23.33 centralSame
This reportParts of the value add up to the value of the sharesthree scenariossum of the partsSame
Formula workbookSame numbers in the spreadsheet of formulas840 values, all companies0 differencesSame
Independent recomputationSame numbers from a separate script written from the standard4 valueslargest difference 0e+00Same
Value per MWBalance-sheet date2026-09-302026-09-30Same
Value per MWDebt, $m4,385.04,385.0Same
Value per MWCash incl. restricted, $m1,641.51,641.5Same
Value per MWBitcoin held3232Same
Value per MWMW operating (D1)630.5630.5Same
Value per MWMW of grid power (D3)4,5524,552Same
Value per MWShares, million322.2322.2Same
Value per MWShare price$14.05 on 2026-11-18$12.36 on 2026-11-23Explained the daily page shows the latest close; this edition uses the close of its data cut (shown as Latest close on this page)
Company card · net debtDebt, $m4,385.0 (face value)4,302.2 (carrying value, 2026-09-30)Explained face value 4,385.0 against carrying value 4,302.2 (+82.8: discounts, issue costs or instruments the card does not tag)
Company card · net debtCash incl. restricted and short-term investments, $m1,641.51,641.5 (2026-09-30)Same
Company card · market dataShares behind the market value, million322.2 (latest quarterly report)321.3 (market-data vendor)Same

Open points

  • Capacity is counted in megawatts of server load (3,215 MW), as the company reports it; the site's capacity pages show 4,552 MW from the grid, so the two are not directly comparable.

Sources

  1. businesswire.com
  2. Margin: segment data in the quarterly report for Q3 2026, as recorded on the site (licence revenue excluding power passed on to the tenant; cash cost excluding power and depreciation)
  3. Current report on form 8-K of 27 July 2026, item 7.01 — sec.gov
  4. Second-quarter 2026 results release — sec.gov
  5. Quarterly report on form quarterly report (form 10-Q) for the third quarter of 2026 — sec.gov
  6. Current report on form 8-K of 27 July 2026, item 7.01 (credit-support agreements) — sec.gov
  7. Exhibit 99.2 to a current report on form 8-K, as recorded in the site's capacity data
  8. Quarterly report for Q3 2026 (form 10-Q), operating figures, as recorded in the site's capacity data
  9. Share price, balance sheet and capacity: the site's market data file of 18 Nov 2026 (src/data/mining/capacity_daily.json, frozen copy).
  10. Latest close: the same market data file as it rolls daily (src/data/mining/capacity_daily.json); it moves the price comparison only, not the value per share.
  11. Assumptions and their sources: assumptions of the three scenarios; rules: the standard.

Data behind this report

This report as data: corz.json · input fingerprint b40059cbfd5980d94d9590bd49d20b176a680e9f969aca8e51c409f4e8acd084 · data passport · reproduction kit.

← CLSK · All companies · HIVE →