IREN Limited (IREN): what a share is worth
How the value per share of IREN Limited is built in three scenarios: every signed lease with its source, every megawatt the company reports, the chance of new leases, its mining sites and its balance sheet. Data as of 18 Nov 2026.
Edition 0.9.6 — partial view. Most revenue comes from renting GPUs; the GPU fleet outside the listed contracts is not valued yet, so this view is not compared with the share price. Values are model results from company filings, company statements and dated market data, before tax (exception VX-2026-02 to the equity valuation standard), not price targets; nothing here is investment advice.
Summary
This is a partial view. Most revenue comes from renting GPUs; the GPU fleet outside the listed contracts is not valued yet, so this view is not compared with the share price. In the central scenario it gives $0.00 a share; the share price, $15.24 on 18 November 2026, is shown for reference only. Per share: GPU cloud contracts $4.20, the chance of new leases on capacity that has none yet $2.14, mining sites at the cost to rebuild them $0.40, mining machines $0.13; less company overhead $0.71, and debt and other claims net of cash and bitcoin $12.90. Before the floor at zero the value would be −$6.74 a share.
The share price is above the central value even if every convertible megawatt were leased.
Leasing all convertible capacity would need about $36.41bn of building work, 5.6 times the company's stock-market value, and would give $2.69 a share in the central scenario. In the cautious scenario new building does not pay for itself, so the value with all capacity leased is $0.00.
380 MW of mining sites are counted at $0.45m per MW, the cost to rebuild them without the machines: $171m in total. At $0.5m per MW, the level at which operating sites sold in 2026, the central value would be $0.00 a share.
How the value adds up
Central scenario, US dollars per share
Green adds, orange subtracts; the blue bar is the value per share before the floor at zero; the dashed line is the share price on 18 Nov 2026.
| Part of the value | Cautious, total | Central, total | Optimistic, total | Cautious, $ a share | Central, $ a share | Optimistic, $ a share |
|---|---|---|---|---|---|---|
| Signed leases | $0m | $0m | $0m | $0.00 | $0.00 | $0.00 |
| GPU cloud contracts | −$35m | $1.78bn | $2.90bn | −$0.08 | $4.20 | $6.84 |
| Chance of new leases on capacity without a lease | $0m | $909m | $5.21bn | $0.00 | $2.14 | $12.28 |
| Mining sites at the cost to rebuild them | $114m | $171m | $342m | $0.27 | $0.40 | $0.81 |
| Mining machines at market value | $42m | $56m | $97m | $0.10 | $0.13 | $0.23 |
| Company overhead | −$450m | −$300m | −$250m | −$1.06 | −$0.71 | −$0.59 |
| Construction money already raised and set aside | $0m | $0m | $0m | $0.00 | $0.00 | $0.00 |
| Money owed by related parties | $0m | $0m | $0m | $0.00 | $0.00 | $0.00 |
| Cash and bitcoin, less debt and other claims | −$5.48bn | −$5.48bn | −$5.48bn | −$12.90 | −$12.90 | −$12.90 |
| Value of the shares | −$5.81bn | −$2.86bn | $2.83bn | $0.00 | $0.00 | $6.67 |
424.4 million shares, including warrants that cost almost nothing to exercise. Value per share never goes below zero; the chart shows the value before that floor. Stock-market value of the company: $6.47bn.
How each block is valued for IREN
The ten blocks of the standard, in order, with what is counted for IREN Limited, its central value per share and the findings of this edition's review. OK rules met with company documents · Limit a known limit of the method · Open a document, figure or decision is needed · Fix a rule is broken.
| Block and rule | What is counted | Central, $ a share | Status | Findings |
|---|---|---|---|---|
| Signed leasesA year of operating income ÷ cap rate by tenant credit, discounted to the year the lease is fully running, less construction still to pay. | none | $0.00 | OK |
|
| GPU cloud contractsCash margin over the contract, plus what the GPUs are worth at the end, less the GPUs not yet delivered. | 3 contracts, $15.90bn | $4.20 | Limit |
|
| Capacity breakdownEvery megawatt the company reports in one status; the statuses add up to the company's total within 0.5%. | 5,000 MW of grid power in 7 statuses | — | Open |
|
| Capacity without a leaseChance of a lease × (data-centre value after its full build cost − the mining site it replaces), never below zero. | 4,371 MW that could be leased | $2.14 | Limit |
|
| Mining sitesOperating mining megawatts × the cost to rebuild one megawatt, without machines; leased megawatts carry no mining value. | 380 MW | $0.40 | Limit |
|
| Mining machinesFleet value from the site's miner net asset value standard, or installed hashrate × $7.05 per terahash per second. | $56m | $0.13 | Open |
|
| Company overheadA landlord's yearly overhead × 10, the same for every company. | $300m | −$0.71 | Limit |
|
| Construction money and other assetsConstruction money already raised and set aside is deducted; money owed by related parties counts only in the optimistic scenario. | — | $0.00 | OK |
|
| Debt, cash and bitcoinDebt at face value, outside shareholders and customer prepayments are subtracted; cash and bitcoin at market are added. | balance sheet of 30 September 2026 | −$12.90 | Limit |
|
| SharesShares outstanding plus warrants that cost almost nothing to exercise. | 424.4 million | — | OK |
|
The values add up to the central value per share before the floor at zero (−$6.74). Findings marked «Open» are also listed under Open points when they concern a figure of this report.
Signed leases and GPU cloud contracts
The company has no signed data-centre lease.
| GPU cloud contract | Contract value | Years | Starts | Cost of the GPUs (central) | Not yet delivered | Value, cautious | Value, central | Value, optimistic | Source of the terms |
|---|---|---|---|---|---|---|---|---|---|
| Microsoft — GPU cloud contract, 5 years (Childress, Texas)$9.7bn; $5.8bn of Dell GPUs disclosed; three of four data halls not yet delivered at 30 September 2026 (our estimate). | $9.70bn | 5 | 1 Dec 2026 | $5.80bn | 75% | $490m | $1.60bn | $2.28bn | Company statement |
| NVIDIA — cloud services, 5 years$3.4bn; GPU cost estimated at 0.598 × contract value. | $3.40bn | 5 | 1 Jan 2027 | $2.03bn our estimate | 100% | −$345m | $41m | $280m | Company filing |
| Other AI customers (Prometheus, Perplexity, Together AI)$2.8bn; "multi-year" read as 4 years; GPU cost estimated. | $2.80bn | 4 | 1 Jan 2027 | $1.67bn our estimate | 100% | −$181m | $144m | $341m | Company filing |
A GPU cloud contract is valued as its cash margin over the contract's life, plus what the GPUs are still worth at the end, less the part of the GPUs not yet delivered and paid for.
Capacity breakdown
Total: 5,000 MW of grid power. About 5 GW of total power capacity (annual report for fiscal 2026). The statuses below add up to 5,000.0 MW (difference +0.0).
| Status | MW | of which mining sites | Mining sites (central) | Value with the chance of a lease (central) | Value if all leased (central) | Build cost if all leased (central) |
|---|---|---|---|---|---|---|
| GPU cloud contractCapacity used for signed contracts to rent out GPU computing. | 469.0 | — | — | $1.78bn | $1.78bn | — |
| Powered, no tenantPower is connected or contracted, but there is no tenant. | 2,281.0 | 220.0 | $99m | $895m | $2.75bn | $19.00bn |
| PipelineGrid queue, development, due diligence or a purchase not yet closed: no power under the company's control and no tenant yet. | 2,090.0 | — | — | $113m | $2.25bn | $17.41bn |
| Own useUsed by the company itself (own GPU cloud or mining it keeps); not counted as convertible. | 160.0 | 160.0 | $72m | $72m | $72m | — |
For signed leases and GPU cloud contracts the value columns show the contracts themselves. For the other statuses they show the mining sites plus what a new lease would add over them.
Capacity without a lease
| Site or group | Status | MW | Company's share | Mining sites, MW | Chance of a lease: cautious / central / optimistic | Data-centre value (central) | Mining sites (central) | Added value with the chance (central) | Added value if leased (central) | Build cost if leased (central) |
|---|---|---|---|---|---|---|---|---|---|---|
| Childress, Texas — capacity not under GPU contracts our estimateOur estimate: 750 MW less the GPU contracts. About 220 MW of mining being wound down (our estimate). | Powered, no tenant | 281.0 | 100% | 220.0 | 10% / 30% / 50% | $339m | $99m | $72m | $240m | $2.34bn |
| Sweetwater 1, Texas — energised substation | Powered, no tenant | 1,400.0 | 100% | — | 10% / 30% / 50% | $1.69bn | — | $507m | $1.69bn | $11.66bn |
| Sweetwater 2, Texas — grid connection in 2028 | Powered, no tenant | 600.0 | 100% | — | 10% / 30% / 50% | $724m | — | $217m | $724m | $5.00bn |
| Canadian sites — own AI cloud and miningCanal Flats, Prince George and Mackenzie. | Own use | 160.0 | 100% | 160.0 | 0% / 0% / 0% | not converted | $72m | $0m | $0m | — |
| Kiowa (Oklahoma), Bundey (Australia), Badajoz (Spain) — pipeline | Pipeline | 2,090.0 | 100% | — | 0% / 5% / 15% | $2.25bn | — | $113m | $2.25bn | $17.41bn |
Data-centre value: the company's share × megawatts of server load × what one megawatt of AI data centre is worth after paying its full build cost. In the central scenario that is $1.72m per megawatt of server load for powered sites and sites with a letter of intent, and $1.54m for the pipeline; in the cautious scenario it is zero, because new building does not earn its cost. Server load is taken as 70% of grid power in the central scenario. Added value = chance of a lease × (data-centre value − mining sites it replaces), and never below zero.
If all capacity were leased
| Measure | Cautious | Central | Optimistic |
|---|---|---|---|
| Added value with the chance of a lease, $ a share | $0.00 | $2.14 | $12.28 |
| Added value if all capacity were leased, $ a share | $0.00 | $11.56 | $36.25 |
| Value per share with the chance of a lease | $0.00 | $0.00 | $6.67 |
| Value per share if all capacity were leased | $0.00 | $2.69 | $30.63 |
Weighted average if all capacity were leased: $7.74. Building it would cost $36.41bn in the central scenario, 5.6 times the company's stock-market value. Share of the unleased capacity that the share price treats as leased: more than all of it (for reference only).
Central value per share against the share of unleased capacity that gets leased
The same chance applied to every site without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.
Mining
| Item | Cautious | Central | Optimistic |
|---|---|---|---|
| Operating mining sites, 380.0 MW, at the cost to rebuild them | $114m at $0.30m per MW | $171m at $0.45m per MW | $342m at $0.90m per MW |
| Mining machines at market value | $42m | $56m | $97m |
7.9 million terahashes per second of mining machines installed at 30 September 2026 (quarterly report; 23.2 million at 30 June) at $7.05 per terahash per second, as on the miner NAV page. The cost to rebuild a site excludes the machines. Operating sites sold in 2026 for about $0.4–0.7m per megawatt including the machines; the central value with sites at $0.5m per megawatt is under What moves the result.
Balance sheet and market data
| Share price (18 Nov 2026) | $15.24 | Balance sheet date | 30 Sep 2026 |
| Debt at face value | $10.43bn | Cash, including cash set aside | $6.80bn |
| Outside shareholders in subsidiaries | $0m | Bitcoin held | 0 BTC = $0m |
| Customer prepayments, counted as debt | $1.84bn | Construction money already raised (central) | $0m |
| Shares, million | 424.4 | MW on the site's capacity pages: energised / committed / pipeline | 2,310 / 2,910 / 5,000 |
Most revenue comes from renting GPUs. The cost of building the data halls for the Horizon 1–4 projects is assumed to be already spent; this needs to be confirmed.
What moves the result
| Change, central scenario | Value per share | Difference |
|---|---|---|
| Central scenario as it is | $0.00 | |
| No new leases on capacity without a lease | $0.00 | — |
| Cap rates 0.5 percentage points lower | $0.00 | — |
| Cap rates 0.5 percentage points higher | $0.00 | — |
| Chances of new leases doubled | $0.00 | — |
| Build cost 10% higher | $0.00 | — |
| Mining sites at $0.5m per MW (level of 2026 site sales) | $0.00 | — |
| Mining sites not counted | $0.00 | — |
Updates
| Data cut of this edition | 18 Nov 2026 (balance sheet of 30 Sep 2026; 10-Q, 10-K, 8-K) |
| Latest close and market value | $14.64 on 23 Nov 2026; market value $6.21bn (at the data cut $15.24 and $6.47bn) — loaded every US trading day at 04:00 Moscow time |
| Next report expected | 4 Feb 2027 — 10-Q filing (estimated from the same report a year earlier) |
| Next edition due | 30 Nov 2026 — quarterly re-cut |
| Since the data cut | bitcoin −2.8%; share count −0.0% (new edition when bitcoin moves more than 20% or the share count more than 5%) |
SEC filings since the data cut
| Filed | Filing | What it means for this valuation |
|---|---|---|
| 19 Nov 2026 | Passive holder above 5% (Schedule 13G) — filed by the holder, not the company SCHEDULE 13G | No effect — Holder report (Schedule 13D or 13G): no input to the valuation. |
Each new filing is assessed automatically for this valuation: a quarterly or annual report means a new edition within 10 business days; a new lease, letter of intent, GPU contract, financing or closed purchase within 5. All filings of IREN are in the SEC filings feed; the order of updates is section 9 of the standard.
Does this report agree with the rest of the site?
Every figure that another page of the site also shows for IREN, side by side. Same: equal within rounding. Explained: different by rule — a later share price on a daily page, face value of debt here against carrying value on the company card, issues or repayments after the balance sheet, another source for the share count. To check: a difference without a stated reason.
| Page | What is compared | This report | Other page | Result |
|---|---|---|---|---|
| Valuation summary table | Values per share in the table of all companies | $0.00 central | $0.00 central | Same |
| This report | Parts of the value add up to the value of the shares | three scenarios | sum of the parts | Same |
| Formula workbook | Same numbers in the spreadsheet of formulas | 840 values, all companies | 0 differences | Same |
| Independent recomputation | Same numbers from a separate script written from the standard | 4 values | largest difference 0e+00 | Same |
| Value per MW | Balance-sheet date | 2026-09-30 | 2026-09-30 | Same |
| Value per MW | Debt, $m | 10,429.0 | 10,429.0 | Same |
| Value per MW | Cash incl. restricted, $m | 6,796.0 | 6,796.0 | Same |
| Value per MW | Bitcoin held | 0 | 0 | Same |
| Value per MW | MW operating (D1) | 2,310.0 | 2,310.0 | Same |
| Value per MW | MW of grid power (D3) | 5,000 | 5,000 | Same |
| Value per MW | Shares, million | 424.4 | 424.4 | Same |
| Value per MW | Share price | $15.24 on 2026-11-18 | $14.64 on 2026-11-23 | Explained the daily page shows the latest close; this edition uses the close of its data cut (shown as Latest close on this page) |
| Company card · net debt | Debt, $m | 10,429.0 (face value, pro forma) | 9,897.0 (carrying value, 2026-09-30) | Explained face value 10,041.0 against carrying value 9,897.0 (+144.0: discounts, issue costs or instruments the card does not tag); issues and repayments after the balance sheet +388.0 |
| Company card · net debt | Cash incl. restricted and short-term investments, $m | 6,796.0 | 5,778.0 (2026-09-30) | Explained cash from issues after the balance sheet +1,018.0 |
| Miner NAV | Mining machines: installed hashrate × $7.05 per TH, $m | 55.7 | 55.7 (7.9 EH/s in the NAV inputs) | Same the NAV page does not value this fleet itself (main business is not mining) |
| Company card · market data | Shares behind the market value, million | 424.4 (latest quarterly report) | 394.0 (market-data vendor) | Explained the catalog card takes the vendor’s share count; this report the cover page of the latest 10-Q and near-free warrants |
Open points
- Mining sites: the 380 MW rest on the 23.2 EH/s fleet of the June quarter, while the quarterly report of 30 September 2026 shows 7.9 EH/s installed; if the idle sites are not counted, the value falls by up to about $0.48 a share in the central scenario.
- A multi-year GPU cloud contract with a frontier AI lab, signed in August 2026, is not counted: its value is not disclosed (annual report for fiscal 2026). The first-quarter results of fiscal 2027 give contracted revenue of $20.3bn against $15.9bn for the three contracts counted, so the GPU cloud value shown is lower than the company's own total.
- Childress, Texas — capacity not under GPU contracts: 281.0 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.
- Partial view: most revenue comes from renting GPUs; the GPU fleet outside the listed contracts is not valued yet, so this view is not compared with the share price.
Sources
- irisenergy.gcs-web.com
- Annual report on form 10-K for fiscal 2026 — sec.gov
- Current report on form 8-K of 20 July 2026, exhibit 99.1 — sec.gov
- Our estimate
- Site table in the annual report (form 10-K), as recorded in the site's capacity data
- The site's capacity data (version 1.1)
- Site table in the annual report (form 10-K)
- Share price, balance sheet and capacity: the site's market data file of 18 Nov 2026 (
src/data/mining/capacity_daily.json, frozen copy). - Latest close: the same market data file as it rolls daily (
src/data/mining/capacity_daily.json); it moves the price comparison only, not the value per share. - Assumptions and their sources: assumptions of the three scenarios; rules: the standard.
Data behind this report
This report as data: iren.json · input fingerprint b40059cbfd5980d94d9590bd49d20b176a680e9f969aca8e51c409f4e8acd084 · data passport · reproduction kit.