MARA Holdings, Inc. (MARA): what a share is worth

How the value per share of MARA Holdings, Inc. is built in three scenarios: every signed lease with its source, every megawatt the company reports, the chance of new leases, its mining sites and its balance sheet. Data as of 18 Nov 2026.

Edition 0.9.6 · published 21 Nov 2026Data as of 18 Nov 2026Checks passed: 0 errorsInput fingerprint b40059cbfd59…

Edition 0.9.6 — partial view. Mining is most of its business and is valued by the site's miner net-asset-value standard, so this view is not compared with the share price. Values are model results from company filings, company statements and dated market data, before tax (exception VX-2026-02 to the equity valuation standard), not price targets; nothing here is investment advice.

$3.01value per share, central scenario
$1.38 – $9.18cautious to optimistic; weighted average $3.92
$6.56share price on 18 Nov 2026 (data cut), for reference. Latest close $5.58 on 23 Nov 2026 (−14.9%)
75%share of unleased capacity the share price treats as leased
Checked. Calculated three ways — engine, spreadsheet of formulas and a separate script from the text of the standard — with no difference larger than 0e+00 dollars a share. Compared with 2 other pages of the site that show MARA: 12 figures agree, 1 differ for a stated reason. See the list →

Summary

This is a partial view. Mining is most of its business and is valued by the site's miner net-asset-value standard, so this view is not compared with the share price. In the central scenario it gives $3.01 a share; the share price, $6.56 on 18 November 2026, is shown for reference only. Per share: the chance of new leases on capacity that has none yet $0.40, mining sites at the cost to rebuild them $1.57, mining machines $1.30; less company overhead $0.77; plus cash and bitcoin net of debt $0.52.

The share price is consistent with leasing 75% of the capacity that has no lease yet (for reference only); the central scenario assumes 8% when weighted by value.

Leasing all convertible capacity would need about $19.80bn of building work, 7.8 times the company's stock-market value, and would give $7.88 a share in the central scenario. In the cautious scenario new building does not pay for itself, so the value with all capacity leased is $1.38.

1,349 MW of mining sites are counted at $0.45m per MW, the cost to rebuild them without the machines: $607m in total. At $0.5m per MW, the level at which operating sites sold in 2026, the central value would be $3.13 a share.

How the value adds up

Central scenario, US dollars per share

Green adds, orange subtracts; the blue bar is the value per share before the floor at zero; the dashed line is the share price on 18 Nov 2026.

MARA Holdings, Inc.: how the central value per share adds upBars in US dollars per share for the central scenario: each part adds or subtracts, the last bar is the value per share; the dashed line is the share price.$0$2$4$6Chance of new leases on capacity without a lease: $0.40 per share ($154m)$0.40NewleasesMining sites at the cost to rebuild them: $1.57 per share ($607m)$1.57MiningsitesMining machines at market value: $1.30 per share ($502m)$1.30MachinesCompany overhead: −$0.77 per share (−$300m)−$0.77OverheadCash and bitcoin, less debt and other claims: $0.52 per share ($203m)$0.52Cash lessdebtValue per share before the floor at zero: $3.01$3.01Valueshare price$6.56
Part of the valueCautious, totalCentral, totalOptimistic, totalCautious, $ a shareCentral, $ a shareOptimistic, $ a share
Signed leases$0m$0m$0m$0.00$0.00$0.00
GPU cloud contracts$0m$0m$0m$0.00$0.00$0.00
Chance of new leases on capacity without a lease$0m$154m$1.51bn$0.00$0.40$3.91
Mining sites at the cost to rebuild them$405m$607m$1.21bn$1.04$1.57$3.13
Mining machines at market value$376m$502m$875m$0.97$1.30$2.26
Company overhead−$450m−$300m−$250m−$1.16−$0.77−$0.65
Construction money already raised and set aside$0m$0m$0m$0.00$0.00$0.00
Money owed by related parties$0m$0m$0m$0.00$0.00$0.00
Cash and bitcoin, less debt and other claims$203m$203m$203m$0.52$0.52$0.52
Value of the shares$534m$1.17bn$3.56bn$1.38$3.01$9.18

387.4 million shares, including warrants that cost almost nothing to exercise. Value per share never goes below zero; the chart shows the value before that floor. Stock-market value of the company: $2.54bn.

How each block is valued for MARA

The ten blocks of the standard, in order, with what is counted for MARA Holdings, Inc., its central value per share and the findings of this edition's review. OK rules met with company documents · Limit a known limit of the method · Open a document, figure or decision is needed · Fix a rule is broken.

Block and ruleWhat is countedCentral, $ a shareStatusFindings
Signed leasesA year of operating income ÷ cap rate by tenant credit, discounted to the year the lease is fully running, less construction still to pay.none$0.00OK
  • No signed data-centre lease.
GPU cloud contractsCash margin over the contract, plus what the GPUs are worth at the end, less the GPUs not yet delivered.none$0.00OK—
Capacity breakdownEvery megawatt the company reports in one status; the statuses add up to the company's total within 0.5%.4,800 MW of grid power in 7 statuses—OK—
Capacity without a leaseChance of a lease × (data-centre value after its full build cost − the mining site it replaces), never below zero.4,249 MW that could be leased$0.40Limit
  • Part of the capacity would be converted through a joint venture; only the company's share of a new data centre is counted.
  • Chances of a lease for powered sites (30% central, calibrated on observed leasing, rule B4.5) and the pipeline (5% central, our assumption) are one chance per status, reviewed for version 1.0.
Mining sitesOperating mining megawatts × the cost to rebuild one megawatt, without machines; leased megawatts carry no mining value.1,349 MW$1.57Limit
  • 1,349 MW at $0.45m per MW, the cost to rebuild from filed build costs (rule B5.4); operating sites sold for about $0.4–0.7m per MW including machines in 2026.
Mining machinesFleet value from the site's miner net asset value standard, or installed hashrate × $7.05 per terahash per second.$502m$1.30OK—
Company overheadA landlord's yearly overhead × 10, the same for every company.$300m−$0.77Limit
  • $30m a year × 10 in the central scenario for every company; the company's own overhead and share-based pay are used from version 1.0.
Construction money and other assetsConstruction money already raised and set aside is deducted; money owed by related parties counts only in the optimistic scenario.—$0.00OK
  • Nothing to count.
Debt, cash and bitcoinDebt at face value, outside shareholders and customer prepayments are subtracted; cash and bitcoin at market are added.balance sheet of 30 September 2026$0.52Limit
  • 3 figures updated after the balance sheet from filed documents (the site's interim inputs).
  • Outside shareholders in subsidiaries at book value ($96m); a listed subsidiary is valued at market from version 1.0.
  • Values are before tax, as for a real-estate investment trust; a tax deduction comes with version 1.0.
SharesShares outstanding plus warrants that cost almost nothing to exercise.387.4 million—OK
  • 387.4 million shares.

The values add up to the central value per share before the floor at zero ($3.01). Findings marked «Open» are also listed under Open points when they concern a figure of this report.

Signed leases and GPU cloud contracts

The company has no signed data-centre lease.

Capacity breakdown

Total: 4,800 MW of grid power. Potential power portfolio of about 4.8 GW (quarterly report). The statuses below add up to 4,800.0 MW (difference +0.0).

StatusMWof which mining sitesMining sites (central)Value with the chance of a lease (central)Value if all leased (central)Build cost if all leased (central)
Powered, no tenantPower is connected or contracted, but there is no tenant.1,349.01,349.0$607m$669m$814m$5.62bn
PipelineGrid queue, development, due diligence or a purchase not yet closed: no power under the company's control and no tenant yet.2,900.0——$92m$1.84bn$14.18bn
Cannot be convertedThe company cannot lease it out: sites hosted by others, sites it manages for others, or places with no market of large AI tenants.551.0——$0m$0m—

For signed leases and GPU cloud contracts the value columns show the contracts themselves. For the other statuses they show the mining sites plus what a new lease would add over them.

Capacity without a lease

Site or groupStatusMWCompany's shareMining sites, MWChance of a lease: cautious / central / optimisticData-centre value (central)Mining sites (central)Added value with the chance (central)Added value if leased (central)Build cost if leased (central)
Sites hosted by other companiesCannot be converted551.0100%—0% / 0% / 0%not converted—$0m$0m—
Owned mining sites — converted through the joint venture with Starwood (MARA up to 50%)Owned by MARA in full today; the 50% share applies only to conversion.Powered, no tenant1,349.050%1,349.010% / 30% / 50%$814m$607m$62m$207m$5.62bn
Long Ridge, Ohio — gas power plant site (purchase not closed at the data cut)Counted in the pipeline until the purchase closes (expected 27 November 2026); then it becomes powered capacity without a tenant and the price paid is entered.Pipeline505.0100%—0% / 5% / 15%$544m—$27m$544m$4.21bn
Matagorda (Texas) and other pipeline — through the joint venture (up to 50%)Pipeline2,395.050%—0% / 5% / 15%$1.29bn—$65m$1.29bn$9.98bn

Data-centre value: the company's share × megawatts of server load × what one megawatt of AI data centre is worth after paying its full build cost. In the central scenario that is $1.72m per megawatt of server load for powered sites and sites with a letter of intent, and $1.54m for the pipeline; in the cautious scenario it is zero, because new building does not earn its cost. Server load is taken as 70% of grid power in the central scenario. Added value = chance of a lease × (data-centre value − mining sites it replaces), and never below zero.

If all capacity were leased

MeasureCautiousCentralOptimistic
Added value with the chance of a lease, $ a share$0.00$0.40$3.91
Added value if all capacity were leased, $ a share$0.00$5.27$18.24
Value per share with the chance of a lease$1.38$3.01$9.18
Value per share if all capacity were leased$1.38$7.88$23.51

Weighted average if all capacity were leased: $9.71. Building it would cost $19.80bn in the central scenario, 7.8 times the company's stock-market value. Share of the unleased capacity that the share price treats as leased: 75% (for reference only).

Central value per share against the share of unleased capacity that gets leased

The same chance applied to every site without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.

MARA Holdings, Inc.: central value per share against the share of unleased capacity that gets leasedCentral value per share if the same chance, from 0% to 100%, applied to all capacity without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.$0.0$1.7$3.5$5.2$6.9$8.70%20%40%60%80%100%0% of the capacity without a lease leased: $2.61 a share10% of the capacity without a lease leased: $3.14 a share20% of the capacity without a lease leased: $3.67 a share30% of the capacity without a lease leased: $4.19 a share40% of the capacity without a lease leased: $4.72 a share50% of the capacity without a lease leased: $5.25 a share60% of the capacity without a lease leased: $5.78 a share70% of the capacity without a lease leased: $6.30 a share80% of the capacity without a lease leased: $6.83 a share90% of the capacity without a lease leased: $7.36 a share100% of the capacity without a lease leased: $7.88 a shareshare price $6.56matches the share price: 75%all leased: $7.88central: $3.01

Mining

ItemCautiousCentralOptimistic
Operating mining sites, 1,349.0 MW, at the cost to rebuild them$405m at $0.30m per MW$607m at $0.45m per MW$1.21bn at $0.90m per MW
Mining machines at market value$376m$502m$875m

71.2 million terahashes per second of mining machines energized at 30 September 2026 (quarterly report) at $7.05 per terahash per second, as on the miner NAV page. The cost to rebuild a site excludes the machines. Operating sites sold in 2026 for about $0.4–0.7m per megawatt including the machines; the central value with sites at $0.5m per megawatt is under What moves the result.

Balance sheet and market data

Share price (18 Nov 2026)$6.56Balance sheet date30 Sep 2026
Debt at face value$2.30bnCash, including cash set aside$1.31bn
Outside shareholders in subsidiaries$96mBitcoin held20,415 BTC = $1.29bn
Customer prepayments, counted as debt$0mConstruction money already raised (central)$0m
Shares, million387.4MW on the site's capacity pages: energised / committed / pipeline1,900 / 2,405 / 4,800

No data-centre lease. Long Ridge (about $1.5bn) had not closed at the data cut, so it sits in the pipeline and its price is not deducted; capacity hosted by others is left out.

What moves the result

Change, central scenarioValue per shareDifference
Central scenario as it is$3.01
No new leases on capacity without a lease$2.61−$0.40
Cap rates 0.5 percentage points lower$3.44$0.43
Cap rates 0.5 percentage points higher$2.75−$0.26
Chances of new leases doubled$3.17$0.16
Build cost 10% higher$2.72−$0.29
Mining sites at $0.5m per MW (level of 2026 site sales)$3.13$0.12
Mining sites not counted$1.91−$1.10

Updates

Data cut of this edition18 Nov 2026 (balance sheet of 30 Sep 2026; 10-Q, 10-K, 8-K)
Latest close and market value$5.58 on 23 Nov 2026; market value $2.16bn (at the data cut $6.56 and $2.54bn) — loaded every US trading day at 04:00 Moscow time
Next report expected24 Feb 2027 — Earnings release (estimated from the same report a year earlier)
Next edition due30 Nov 2026 — quarterly re-cut
Since the data cutbitcoin −2.8%; share count +0.0% (new edition when bitcoin moves more than 20% or the share count more than 5%)

SEC filings since the data cut

No filing since 18 Nov 2026 (EDGAR checked 24 Nov 2026).

Each new filing is assessed automatically for this valuation: a quarterly or annual report means a new edition within 10 business days; a new lease, letter of intent, GPU contract, financing or closed purchase within 5. All filings of MARA are in the SEC filings feed; the order of updates is section 9 of the standard.

Does this report agree with the rest of the site?

Every figure that another page of the site also shows for MARA, side by side. Same: equal within rounding. Explained: different by rule — a later share price on a daily page, face value of debt here against carrying value on the company card, issues or repayments after the balance sheet, another source for the share count. To check: a difference without a stated reason.

PageWhat is comparedThis reportOther pageResult
Valuation summary tableValues per share in the table of all companies$3.01 central$3.01 centralSame
This reportParts of the value add up to the value of the sharesthree scenariossum of the partsSame
Formula workbookSame numbers in the spreadsheet of formulas840 values, all companies0 differencesSame
Independent recomputationSame numbers from a separate script written from the standard4 valueslargest difference 0e+00Same
Value per MWBalance-sheet date2026-09-302026-09-30Same
Value per MWDebt, $m2,297.22,297.2Same
Value per MWCash incl. restricted, $m1,310.41,310.4Same
Value per MWBitcoin held20,41520,415Same
Value per MWMW operating (D1)1,900.01,900.0Same
Value per MWMW of grid power (D3)4,8004,800Same
Value per MWShares, million387.4387.4Same
Value per MWShare price$6.56 on 2026-11-18$5.58 on 2026-11-23Explained the daily page shows the latest close; this edition uses the close of its data cut (shown as Latest close on this page)
Miner NAVMining machines: installed hashrate × $7.05 per TH, $m502.0502.0 (71.2 EH/s in the NAV inputs)Same the NAV page does not value this fleet itself (main business is not mining)

Open points

  • Long Ridge (505 MW, about $1.5bn): the purchase had not closed at the data cut, so the site sits in the pipeline and its price is not deducted; at closing (expected 27 November 2026) the next edition counts it as powered capacity without a tenant and enters the price paid.
  • Partial view: mining is most of its business and is valued by the site's miner net-asset-value standard, so this view is not compared with the share price.

Sources

  1. Quarterly report for Q3 2026 (form 10-Q): sites hosted for others are about 29% of capacity, from the site's mining cost inputs
  2. Quarterly report for Q3 2026 (form 10-Q), as recorded on the site; strategic agreement with Starwood
  3. Quarterly report (form 10-Q), as recorded in the site's lease register
  4. The site's capacity data (version 1.1)
  5. Share price, balance sheet and capacity: the site's market data file of 18 Nov 2026 (src/data/mining/capacity_daily.json, frozen copy).
  6. Latest close: the same market data file as it rolls daily (src/data/mining/capacity_daily.json); it moves the price comparison only, not the value per share.
  7. Assumptions and their sources: assumptions of the three scenarios; rules: the standard.