Key takeaways
- Data Center Full Cycle Index answers one question: if an investor wanted to own the whole AI data center build-out — power, electrical and thermal systems, connectivity, compute and the buildings — in proportion to how much of each company's business actually is data centers, what would that portfolio have looked like, and what did it return?
- The research calculation from 30 June 2015 to 9 October 2026 compounds at 28.7% a year net of model costs with a 39.4% maximum drawdown, against 19.7% for QQQ. Most of the excess arrived in 2023–2026, and the universe was assembled in 2026 from surviving companies — so the number is a description, not an expectation.
- Rules were frozen and pre-registered before the results were read, and the selection criteria exclude return. Sixteen alternatives are published as sensitivities; one of them (a single equal-weight pool) returns more than the baseline and was not chosen.
Why a value-chain index
Most "AI" or "data center" products own one layer. Semiconductor ETFs own the chips; data center REIT funds own the buildings; infrastructure funds own the utilities. Each is a bet on which layer captures the margin in a given year, and in 2024–2026 the layers diverged violently: chip and optics makers compounded at rates the landlords never approached. A value-chain index refuses that bet. It gives every layer the same capital budget and lets the companies' own disclosures decide which names, and how much of each, inside the budget.
The five segments follow the physical chain. Power (S1) is generation, grid and on-site supply — utilities with signed data center loads, turbine and fuel-cell makers. Thermal & Electrical Systems (S2) is what sits between the substation and the rack: switchgear, UPS, transformers, chillers, coolant distribution. Connectivity (S3) is switches, optical transceivers, fiber and interconnect silicon. Compute (S4) is accelerators, CPUs, memory, servers and storage, plus the GPU clouds that rent them out. Capacity (S5) is the operators, REITs and HPC landlords that own the halls.
From catalog to constituents
The index starts from the DC/AI company catalog: 111 listed issuers (127 securities in the research universe once delisted candidates are included), each admitted on documented evidence that it sells into the build-out and each carrying an exposure estimate — the share of revenue tied to data centers, recorded as a low–high range with a validity date. Exposure is the central variable. A company enters at ≥ 20% exposure and stays while it holds ≥ 15%, so a diversified industrial with a fast-growing data center line qualifies while a conglomerate with a marginal one does not.
Size and liquidity gates (USD 2.0bn market cap, USD 10m daily turnover, 10% free float, 180 days of history) are evaluated on the median of three monthly snapshots, so one quiet month cannot expel a name. Up to eight companies per segment are selected by capitalization each May, effective in June; weights are restored every March, June, September and December.
Exposure-weighting in one formula
Inside each 20% segment budget, weight is proportional to exposure² × √market cap, capped at 5% per company. Squaring exposure makes the index strongly prefer pure plays: a company at 80% exposure gets sixteen times the exposure factor of one at 20%. The square root of market cap keeps the giants from swallowing the segment without ignoring size entirely — a continuous version of the pure-play/diversified two-tier schemes used by thematic indices, without the cliff between tiers. Unfilled budget (when a segment has too few eligible names, or the caps bind) is redistributed to the other segments up to a 35% ceiling, and only then held in cash. A 5% sleeve with 2%/1% caps holds the operating GPU clouds and HPC landlords whose history is short.
The result after the 30 September 2026 rebalance is 35 constituents, a data-center share of business — the weighted average exposure — of 63%, a Herfindahl concentration of 0.039, and a country split of 65% United States, 10% Taiwan, 9% China. The constituent table lists every name with its exposure, capitalization and weight.
What the history says — and what it cannot
| Series, 30 Jun 2015 – 9 Oct 2026 | CAGR | Volatility | Max drawdown | Sharpe |
|---|---|---|---|---|
| Data Center Full Cycle Index net total return (0.60% + 15 bp costs) | 28.7% | 23.7% | −39.4% | 1.10 |
| Data Center Full Cycle Index price return | 26.9% | 23.7% | −40.1% | 1.04 |
| QQQ | 19.7% | 22.2% | −35.1% | 0.83 |
| SPY | 14.4% | 17.7% | −33.7% | 0.73 |
| ACWI | 11.3% | 17.1% | −33.5% | 0.60 |
Read the table with three facts beside it. First, the universe is retrospective: companies that failed, were acquired or never listed are not in it, and the exposure estimates were made knowing how 2024 turned out. Second, the return is front-loaded in time's other direction — 2023, 2024, 2025 and 2026 to date each returned 60–75%, while 2015–2021 compounded at a rate closer to the Nasdaq-100. Third, the style decomposition is unromantic: 48% semiconductors (SOXX), 27% data center REITs (SRVR), 17% industrials (XLI) and 7% software (IGV) explain three quarters of the daily variance. Data Center Full Cycle Index is semiconductor beta with a data-center tilt and lower volatility. The regression leaves an 11.6% annual alpha, part of which is the hindsight above.
The robustness tests are published rather than argued. A block bootstrap of 2,000 paths puts the 90% band for CAGR at 14%–47% and the maximum drawdown as deep as −53%. A deflated Sharpe ratio that penalizes the sixteen variants tried gives a 97.6% probability that the true Sharpe exceeds zero — not that it equals 1.10.
Frozen rules and honest sensitivities
The configuration was chosen on five pre-registered criteria: maximize data-center share of business including cash, minimize cash, keep one-way turnover below 35% a year, keep concentration below 0.05, and keep capacity at USD 1bn (five days to build a position at 10% participation). Return was explicitly not a criterion, and the rules file, universe, evidence, share history and engine are identified by SHA-256 in the pre-registration document.
The sensitivities are the test of that discipline. Dropping the segment structure for a single equal-weight pool returns 30.0% a year — more than the 28.7% baseline — and was not adopted because the segments are the thesis. Removing the redistribution of unfilled budgets cuts the return to 24.6% with a quarter of the portfolio in cash. Raising the exposure threshold to 25% lifts purity to 67% with 23 names. Doubling the cost model costs 0.7 points. Each of the sixteen is a row in the sensitivity table, with turnover, cash and purity alongside the return.
Worked example
| Step | Rule | Illustration from the 30 Sep 2026 rebalance |
|---|---|---|
| Admission | exposure ≥ 20%, market cap ≥ USD 2.0bn, turnover ≥ USD 10m | Vertiv (exposure 80%), Digital Realty (100%) and NVIDIA (87.5%) all qualify; Cisco qualifies at 23% exposure |
| Ranking | top 8 per segment by capitalization | Compute keeps NVIDIA, Broadcom, Micron, SK hynix, TSMC plus the GPU sleeve |
| Weighting | ∝ exposure² × √cap, cap 5% | Digital Realty, Equinix, Vertiv and NVIDIA sit at or near the 5% cap; Cisco, at 23% exposure, receives 0.65% despite its size |
| Budgets | 20% per segment, 35% ceiling | Power has three eligible names (Talen, GE Vernova, Bloom), so its target weight cannot exceed 15% (three names at the 5% cap) and the unfilled budget flows to the other four segments; observed segment weights then drift with prices (Power 17.4% at 13 Nov 2026) |
| Costs | 0.60% a year + 15 bp per dollar traded | 32% average one-way turnover costs roughly 10 bp a year in trading on top of the fee |
What would make it investable
Three gates stand between the research series and a product. First, a codebook for exposure with two independent coders working from primary disclosures, and external time-stamping of the pre-registration — four to six weeks of work and no capital. Second, an investable variant (investable variant) that handles the 13% of weight listed in Taiwan, Korea and mainland China through depositary receipts or exclusion, caps young listings, and publishes its tracking difference. Third, at least six months of forward calculation with licensed data and an administrator. Until then Data Center Full Cycle Index is what this note describes: a disciplined, reproducible description of the past, published with its biases attached.
Questions to ask before investing
- Which layer of the value chain does an "AI infrastructure" product actually own, and in what proportion?
- How is thematic exposure measured, by whom, and with what evidence date?
- Were the rules frozen before the backtest was read, and on what criteria was the configuration chosen?
- How much of the historical return comes from the last three years?
- What do the sensitivities and the bootstrap say about the range of outcomes?
- Can you download the rules, the constituents and the daily series and check them?
Sources
- Data Center Full Cycle Index v0.4 research package, built 10 Oct 2026: rules_v0_4.json, pre_registration_v0_4.json, metrics for all variants, daily levels — all linked from the index page.
- DC/AI company catalog 1.2, snapshot 10 Oct 2026 — company directory.
- Factor ETFs used as style proxies: SOXX, SRVR, XLI, XLU, VNQ, IGV; benchmarks QQQ, SPY, ACWI (Yahoo Finance adjusted closes).
The analytical framework and worked examples are HASHFLOPS.IO editorial analysis. Numerical examples use stated assumptions and are not current market quotations. Nothing on this page is investment advice or an offer; see the disclaimer.