DIGITAL INFRASTRUCTURE / INVESTMENT INTELLIGENCERESEARCH PLATFORM · DATA CENTER FULL CYCLE INDEX · DATA AS OF 23 NOV 2026 · PUBLICATION LOG
RESEARCH / INDEX CONSTITUENTS · SERIES PART 1 OF 5

Data center power leaders: Talen, GE Vernova, Bloom — why only three names pass the index's exposure test, and what each guided for 2026–27

Why the index exists, how the Power layer picks leaders (E ≥20%, cap ≥$2bn, w ∝ E²·√cap) and what Talen, GE Vernova and Bloom reported and guided in Q3 2026.

PUBLISHED 15 NOV 2026 · UPDATED 15 NOV 2026 · 13 MIN READ · 2944 WORDS

Key takeaways

  • The Data Center Full Cycle Index exists to measure the AI build-out as a chain of five businesses — power, thermal and electrical systems, connectivity, compute, capacity — weighting each company by the share of its revenue earned from the data-center ecosystem rather than by its brand or its market value alone. The Power layer is the first link: the companies that sell the megawatt before anyone can sell a rack.
  • Only three names pass the Power layer's two tests: an estimated data-center revenue share E of at least 20% and a capitalization proxy of at least $2bn. Talen Energy (E 15–35%, mid 25%), GE Vernova (15–30%, 22.5%) and Bloom Energy (35–55%, 45%) qualify; twenty utilities and power producers in the universe do not, because data centers are still a single-digit share of their load. With three names at the 5% company cap the layer uses 15 of its 20 points; the unused five are redistributed to the other four layers.
  • The three leaders reported a strong third quarter. Talen guided 2027 adjusted EBITDA to $2.50–2.85bn (+26% at the midpoint) and sold $1.5bn of future PJM capacity revenue to fund a buyback; GE Vernova booked $29.3bn of orders, lifted gas-turbine backlog and slot reservations to 122 GW and raised 2026 free-cash-flow guidance to $16–17bn; Bloom grew revenue 138% to $1.24bn and raised its 2026 revenue guidance to $4.4–4.6bn.
  • The layer's weighted exposure is the lowest of the five (29.7% at the 16 October composition cut), which is the honest reading of the power business today: the data center is the fastest-growing customer of these companies, not yet the majority of their revenue. Observed weights have drifted above target (17.4% of the index at 13 November against a 15% target) because Talen outperformed the compute names in the October–November sell-off.

Not investment advice. This note describes the composition of a research index and the businesses of its constituents as the companies themselves report them. It is informational research only: not investment advice, not a recommendation to buy, sell or hold any security, and not an offer or solicitation. Companies are named because they are index constituents, not because they are endorsed; figures and guidance are the companies' own statements, quoted with their dates. See the disclaimer.

Why the index exists

A single company can tell you how one part of the AI build-out is going. The build-out itself is a chain: a data center needs a grid connection or on-site generation before it needs transformers and chillers, transformers and chillers before it needs switches and optics, switches and optics before it needs accelerators and memory, and all of it before an operator can lease a kilowatt to a tenant. The Data Center Full Cycle Index was built to measure that chain in one number. It groups 35 listed companies into five layers and weights each one by the share of its revenue estimated to come from the data-center ecosystem, so that a pure-play operator counts fully and a diversified industrial counts in proportion to its exposure. The base is 1,000 at 30 June 2025; the official level closed at 2,044.04 on 13 November 2026, 32% below the 22 June peak after the October–November repricing described in Two prices for a megawatt. The rules are pre-registered and hashed before each run; the methodology and the constituent files are public.

The layer notes in this series answer three questions for each link of the chain: why the index needs that layer, how its leaders are selected and weighted, and what each constituent does and says about its own outlook. This note covers Layer 1, Power.

How the leaders of the Power layer are chosen

The Power layer covers energy supply and power-generation equipment dedicated to data centers: independent power producers with data-center contracts, turbine and grid-equipment makers, and on-site generation such as fuel cells. The universe for the 2026 selection held 22 candidates in this layer. A candidate enters the index when it clears three gates and a ranking:

  • Exposure. E is the estimated share of revenue earned from the data-center ecosystem, taken as the midpoint of a low–high range and rounded to half a point. Entry requires E ≥ 20%; a constituent is retained while E ≥ 15%. Estimates are analyst estimates on segment reporting, not company disclosures, and are dated from the month the share is judged to have reached 15% (exposure_since), so a company's history before that month is not counted.
  • Size and liquidity. Capitalization proxy ≥ $2.0bn (retention $1.5bn), 60-day median turnover ≥ $10m (retention $7.5m), free float ≥ 10%, listing age ≥ 180 days; all gates use the median of the last three month-end observations.
  • Ranking. Selection is annual on the last business day of May, effective end of June. Each layer takes up to eight names ranked by capitalization proxy; incumbents are retained while they rank in the top ten.
  • Weights. Within a layer, weight is proportional to E² × √(capitalization proxy), capped at 5% per company. Each layer has a nominal budget of 20%; a budget the layer cannot fill is redistributed pro rata to the other layers, under the same company caps and a 35% ceiling per layer. Weights are reset at the quarterly rebalance (March, June, September, December) and drift with prices in between.

The exposure test is what makes the Power layer small. Of the 22 candidates, 19 are utilities and generators whose estimated data-center share is below 20%: NextEra, Constellation, Southern, Duke, Vistra, NRG and their peers carry E of 1–10%, Dominion 12–20% (mid 16%), Siemens Energy 10–20% (mid 15%). They supply data centers, and several have signed large contracts, but data centers remain a minority of their revenue, and the index weights revenue share, not headlines. Three companies clear the bar:

Company Ticker E range (mid) Basis of estimate Cap proxy, 9 Oct 2026 Target weight, 30 Sep Observed weight, 13 Nov
Talen Energy TLN 15–35% (25%) segment reporting estimate, since Mar 2024 $18.1bn 5.00% 7.62%
GE Vernova GEV 15–30% (22.5%) analyst estimate, since Apr 2024 $267.6bn 5.00% 5.36%
Bloom Energy BE 35–55% (45%) analyst estimate, since Jan 2024 $79.8bn 5.00% 4.39%
Layer 1 total 15.00% 17.37%

Source: constituents and composition files of the index; weights at 13 November are observed weights after price drift since the 30 September rebalance.

Two mechanics follow from the table. First, with E² × √cap the formula would give GE Vernova (cap $268bn) and Bloom (E 45%) far more than Talen, but all three hit the 5% company cap, so the layer is equal-weighted at target and the formula never bites. Second, three names at 5% use only 15 of the layer's 20 points; the remaining five are redistributed pro rata to the other four layers, which is why their budgets in the current composition are 21.25% each rather than 20%. If a fourth candidate crossed 20% exposure — Dominion is the nearest at a 16% midpoint — the Power layer would absorb that budget back.

The weighted exposure of the layer (the share of its weight that is data-center revenue) was 29.7% at the 16 October composition cut, the lowest of the five layers; Capacity is 89.5% and Connectivity 76.5%. That is the layer's nature, not a flaw: a megawatt sold to a data center is the same product as a megawatt sold to a factory, and the companies that sell it are not pure plays.

The leaders

Talen Energy (TLN) — nuclear and gas in PJM, with a hyperscaler as anchor customer

Talen is an independent power producer whose fleet sits in PJM, the grid region covering the mid-Atlantic and the largest data-center cluster in the world (Northern Virginia, Pennsylvania, Ohio). Its anchor asset is the Susquehanna nuclear station in Pennsylvania (90% owned); in June 2025 it expanded its agreement with Amazon to a power purchase agreement for up to 1,920 MW of Susquehanna output running to 2042, and it has since added two large combined-cycle gas plants in PJM (Freedom in Pennsylvania and Guernsey in Ohio), whose contribution shows in the 2026 numbers. Data centers are a single, large customer for Talen rather than a product line, which is why the estimated exposure is a range (15–35%) that depends on how much of the fleet's output and capacity revenue is attributed to data-center load.

In the quarter to 30 September 2026 Talen reported adjusted EBITDA of $669m (Q3 2025: $363m) and adjusted free cash flow of $433m ($223m), on generation of 23.9 TWh against 11.1 TWh a year earlier, with the acquired plants, higher settled power prices and higher capacity revenues as the drivers; GAAP net income was $138m. The company reaffirmed 2026 guidance of $2,050–2,200m adjusted EBITDA and $1,225–1,325m adjusted free cash flow, and introduced 2027 guidance of $2,500–2,850m and $1,500–1,750m, which it describes as roughly 26% and 27% growth at the midpoints, citing "strong PJM fundamentals and a full year of contributions from our recently acquired assets". On 1 October it closed a capacity monetization that sells rights to approximately $1.5bn of PJM capacity cash flows for the 2027/28 and 2028/29 delivery years for $1.3bn of net proceeds, and used them to fund a $1.5bn accelerated share repurchase; the repurchase programme was upsized to $3.0bn through 2028 (Q3 2026 results, 8-K of 3 Nov 2026). Management states a net-leverage target of 3.5× net debt to adjusted EBITDA.

What the company says about its prospects: growing demand across PJM "strengthens the outlook for our fleet"; the capital-allocation benchmark is share repurchases, and the stated objective is adjusted free cash flow per share. What the filings do not say: how much of 2027 EBITDA is contracted to data-center counterparties rather than earned on merchant power and capacity prices. The index's exposure range reflects that gap.

GE Vernova (GEV) — gas turbines and grid equipment, measured in gigawatts of backlog

GE Vernova is the power-equipment business spun out of General Electric in April 2024. It reports three segments: Power (gas, nuclear, hydro and steam equipment and services), Electrification (grid systems, transformers, switchgear, power conversion) and Wind. Data centers reach it through two channels — gas turbines bought by utilities and developers to serve new load, and grid equipment for substations and interconnection — which is why its exposure is estimated at 15–30% and rises with each quarter of turbine orders.

The third quarter of 2026 was the strongest in the company's short history. Orders were $29.3bn, up 96% organically; revenue $12.6bn, up 27% (18% organic); adjusted EBITDA $1.9bn at a 15.4% margin; free cash flow $5.4bn. Backlog grew $20bn in the quarter to $197bn, and management expects it to exceed $200bn in the fourth quarter. In Gas Power, 11 GW of new equipment contracts were signed (8 GW of slot reservations, 3 GW of orders), 13 GW of reservations converted to orders and 5 GW shipped, taking equipment backlog from 53 to 64 GW while reservations fell from 63 to 58 GW; the combined 122 GW is expected to reach at least 130 GW by year-end. Electrification equipment backlog rose 60% year on year to $42.2bn. On that basis the company raised 2026 guidance to revenue of $46.5–47.5bn (from $45.5–46.5bn), an adjusted EBITDA margin of 13.5–14.5% and free cash flow of $16–17bn (from $11.5–12.5bn), and increased its buyback authorization to $20bn. In October it agreed to acquire Trench Group, a maker of high-voltage grid equipment, for $9.0bn (Q3 2026 results, 8-K of 28 Oct 2026).

What the company says about its prospects: it is "innovating and developing new solutions for utility and data center customers to meet growing demand", is investing $6bn of capex over 2025–2028 to raise Power and Electrification output, and expects to exit 2026 with at least 130 GW of gas equipment under contract. The relevant caveat for the index is that a turbine slot reserved in 2026 ships in 2028–2029: backlog measures commitments, and revenue recognition lags it by years.

Bloom Energy (BE) — on-site fuel cells, the shortest path from order to megawatt

Bloom makes solid-oxide fuel cell systems that generate electricity on site from natural gas (or hydrogen), without waiting for a grid connection. That is the proposition data-center developers have bought since 2024: when the interconnection queue is measured in years, a fuel-cell array can be installed in months. The company's estimated exposure of 35–55% is the highest in the layer and the reason its weight is equal to GE Vernova's despite a capitalization proxy a third the size — E enters the formula squared.

Revenue in the third quarter of 2026 was $1,235.8m, up 138.1% year on year; product revenue $1,073.6m, up 179.4%; GAAP gross margin 33.8% (+453 bp); operating income $225.4m against $7.8m a year earlier, an 18.2% operating margin; adjusted EBITDA $299.5m. The company raised its full-year 2026 guidance for the third time this year, to revenue of $4.4–4.6bn (122% growth at the midpoint), a non-GAAP gross margin of about 34% and non-GAAP operating income of $960–1,030m, and was added to the S&P 500 during the quarter (Q3 2026 results, 8-K of 22 Oct 2026). The largest disclosed customer relationship is with Oracle: under a master services agreement announced on 13 April 2026, Oracle intends to procure up to 2.8 GW of Bloom systems for its US projects, of which an initial 1.2 GW is contracted and deploying into 2027 (Bloom Energy, 13 Apr 2026).

What the company says about its prospects: "what began with hyperscalers is rapidly moving across market segments", and it is investing "to build the capabilities and capacity needed to scale the business". The caveat is the one that applies to any fast-growing equipment supplier: 2026 revenue is being recognized on orders placed when grid connections were the binding constraint, and the durability of that constraint — not demand for compute — is what the 2027 order book will test.

Reading the layer

Metric Talen Energy GE Vernova Bloom Energy
Market cap, 13 Nov 2026 $18.0bn $213.9bn $56.5bn
Revenue, trailing 12 months (to 30 Jun 2026) $3.74bn $41.37bn $3.11bn
Revenue growth, year on year +76% +13% +91%
EBITDA margin 15.6% 9.5% 13.5%
EV / EBITDA 47× 52× 135×
Latest quarter (date) Q3, 3 Nov 2026 Q3, 28 Oct 2026 Q3, 22 Oct 2026
Stated 2026 outlook adj. EBITDA $2.05–2.2bn revenue $46.5–47.5bn, FCF $16–17bn revenue $4.4–4.6bn

Catalog metrics from the company pages (quote date 13 November 2026; trailing-twelve-month figures to the last reported period in the catalog, mostly 30 June 2026; EV/EBITDA on trailing EBITDA). Growth rates are catalog figures and may differ from the quarterly figures above.

Three observations. First, the layer behaves differently from the rest of the index. In the five weeks of the sell-off from 9 October to 13 November the catalog's power-generation names were flat (−0.2%) while compute fell 26% and connectivity 29% (Two prices for a megawatt); within the index that pushed Talen to 7.6% of the total against a 5% target, the largest overweight of any constituent. The December rebalance will reset it. Second, the three companies monetize the same shortage in three different ways — Talen sells existing megawatts at prices set by PJM's capacity auctions, GE Vernova sells the equipment to build new ones with a two-to-three-year lag, Bloom sells the bypass around the grid — so the layer is less of a single bet than its three names suggest. Third, the exposure estimates are the softest input in the index, and here they matter most: a move of Talen's midpoint from 25% to 35% would not change its weight (the cap binds), but a move of Dominion's from 16% to 20% would add a fourth name and reclaim five points of budget from the other layers.

Limits of this reading

  • Exposure ranges are analyst estimates on segment reporting, not company disclosures; the companies do not report data-center revenue as a line item.
  • Weights are observed weights at 13 November, after price drift; target weights are those set at the 30 September rebalance and will be reset in December.
  • Company figures are taken from the companies' own releases and filings on the dates given; guidance is the companies' statement of its own expectations and is quoted, not endorsed.
  • This note describes the composition of a research index and the businesses of its constituents. It is not investment advice, a recommendation or an offer; see the disclaimer.

Frequently asked questions

Why are Constellation, Vistra and NextEra not in the Power layer?

Their estimated share of revenue from the data-center ecosystem is below the 20% entry threshold (Constellation 3–10%, Vistra 2–8%, NextEra 1–5%). They sell power to data centers and have announced large contracts, but the index weights revenue share, and for a utility or a diversified generator data centers remain a small part of total load. Dominion (12–20%, midpoint 16%) is the nearest candidate.

Why do the three Power names have equal weight?

The formula w ∝ E² × √cap would give very different weights, but each of the three exceeds the 5% company cap, so all are held at 5% at target. The cap, not the formula, sets the layer's weights.

Where does the Power layer's unused budget go?

The layer's nominal budget is 20%; three names at 5% use 15%. The remaining 5% is redistributed pro rata to the other four layers, which is why their current budgets are 21.25% each.

How often does the composition change?

Constituents are selected once a year on the last business day of May, effective end of June; weights are reset every quarter (March, June, September, December). Between those dates only a corporate event at a constituent triggers an off-cycle review.

The analytical framework and worked examples are HASHFLOPS.IO editorial analysis. Numerical examples use stated assumptions and are not current market quotations. Nothing on this page is investment advice or an offer; see the disclaimer.