Key takeaways
- Layer 2 of the Data Center Full Cycle Index holds the companies that turn a grid connection into usable, cooled, protected power inside the building: UPS and power distribution, cooling, racks and busways, and the mechanical and electrical contractors who install them. Eight names fill the layer — Vertiv, Asia Vital Components, Schneider Electric, Comfort Systems USA, Delta Electronics, nVent, Lite-On Technology and Legrand — out of 28 candidates.
- The exposure test (data-center revenue share ≥ 20%) and the ranking (eight largest by capitalization proxy) decide the list. Eaton misses the exposure threshold by half a point (17–22%, midpoint 19.5%); Modine, Munters, Auras and AAON pass it but are not among the eight largest. Weights follow E² × √cap under a 5% cap, which is why Vertiv (E 80%) carries roughly the target weight of Schneider and Delta combined.
- Every one of the eight raised guidance or reported record demand in the third quarter of 2026: Vertiv grew sales 61% with organic orders up more than 100% and guided 2026 revenue to $14.45–14.85bn; Comfort Systems' backlog reached $17.8bn (+90%); nVent's organic sales grew 44%; Schneider and Legrand lifted their 2026 targets for the second time this year on triple-digit and ~40% data-center growth respectively; AVC's quarterly revenue rose 52% and Lite-On's AI-related revenue passed 30% of sales.
- The layer's weighted exposure is 44.4% — the companies are industrials for which the data center became the largest growth market in 2024–2026 rather than pure plays — and it took the middle path in the autumn sell-off: the catalog's thermal and electrical names lost 16.8% between 9 October and 13 November against −26% for compute.
Not investment advice. This note describes the composition of a research index and the businesses of its constituents as the companies themselves report them. It is informational research only: not investment advice, not a recommendation to buy, sell or hold any security, and not an offer or solicitation. Companies are named because they are index constituents, not because they are endorsed; figures and guidance are the companies' own statements, quoted with their dates. See the disclaimer.
Why the index exists
The AI build-out is a chain of five businesses, and a single company — however large — measures only its own link. The Data Center Full Cycle Index groups 35 listed companies into five layers (power, thermal and electrical systems, connectivity, compute, capacity) and weights each by the estimated share of its revenue earned from the data-center ecosystem. The base is 1,000 at 30 June 2025; the official level closed at 2,044.04 on 13 November 2026, 32% below the June peak. The methodology is pre-registered and the constituent files are public. This series of notes takes each layer in turn: why it is in the index, how its leaders are chosen and weighted, and what each constituent does and says about its outlook. Part 1 covered Power; this note covers Layer 2, Thermal & Electrical Systems.
The layer exists because the megawatt that arrives at the fence is not the megawatt a server can use. Between the two sit medium-voltage switchgear, transformers, UPS systems and batteries, busways and power distribution units, chillers, coolant distribution units and cold plates, racks and containment — and the contractors who design and install them. In 2024–2026 this equipment became the pacing item of the build-out alongside power itself: lead times for switchgear and transformers stretched to a year or more, and the shift of accelerator racks from 40 kW to 130 kW and beyond moved cooling from air to liquid, which replaced one product set with another. Companies that sell these systems earn a share of every megawatt built regardless of whose chips go in the racks, which is why the index treats them as a layer in their own right rather than as suppliers to the compute layer.
How the leaders of the Thermal & Electrical layer are chosen
The rules are the same for every layer. A candidate enters when its estimated data-center revenue share E (midpoint of a low–high range, rounded to half a point) is at least 20% (retention 15%), its capitalization proxy is at least $2.0bn (retention $1.5bn), its 60-day median turnover at least $10m, its free float at least 10% and its listing at least 180 days old. Selection is annual on the last business day of May, effective end of June; each layer takes up to eight names ranked by capitalization proxy, with incumbents kept while they rank in the top ten. Within the layer, weight is proportional to E² × √(capitalization proxy), capped at 5% per company; the layer's nominal budget is 20%, raised to 21.25% in the current composition by redistribution of the Power layer's unused budget. Weights are reset quarterly.
The 2026 universe held 28 candidates in this layer. The exposure test removes the diversified industrials for which data centers are a growing but minor market — Eaton (E 17–22%, midpoint 19.5%, half a point below the threshold), ABB, Trane, Johnson Controls, Carrier, Hubbell, Mitsubishi Electric, Hitachi, Nidec, Prysmian and Generac, all with midpoints between 3% and 12%. Fifteen candidates pass it (EMCOR, at a 16% midpoint, does not); the ranking by size keeps the eight largest and leaves Modine (E 22–30%), Auras Technology (35–55%), Munters (35–45%), AAON (25–40%), Advanced Energy, Sterling Infrastructure and Powell outside the eight. The result:
| Company | Ticker | What it sells to the data center | E range (mid) | Cap proxy, 9 Oct | Target weight, 30 Sep | Observed, 13 Nov |
|---|---|---|---|---|---|---|
| Vertiv | VRT | UPS, power distribution, thermal management, racks, services | 75–85% (80%) | $93.5bn | 5.00% | 5.31% |
| Asia Vital Components | 3017 | cold plates, liquid-cooling modules, CDUs, fans and heat sinks | 35–55% (45%) | $42.4bn | 3.98% | 4.32% |
| Delta Electronics | 2308 | server power supplies, power shelves and racks, liquid cooling, UPS | 20–35% (27.5%) | $160.3bn | 2.83% | 2.28% |
| Comfort Systems USA | FIX | mechanical and electrical contracting, modular construction | 30–40% (35%) | $60.4bn | 2.82% | 2.41% |
| Schneider Electric | SU | switchgear, UPS, prefabricated modules, cooling, software | 22–28% (25%) | $164.8bn | 2.58% | 2.60% |
| nVent Electric | NVT | enclosures, liquid cooling, power distribution, busway | 30–45% (37.5%) | $27.1bn | 2.16% | 1.96% |
| Lite-On Technology | 2301 | server power supplies, power shelves, battery backup units | 20–35% (27.5%) | $21.2bn | 1.02% | 1.03% |
| Legrand | LR | busways, PDUs, racks, cabling and white-space products | 18–24% (21%) | $40.5bn | 0.86% | 1.02% |
| Layer 2 total | 21.25% | 20.92% |
Source: constituents and composition files; observed weights are after price drift since the 30 September rebalance.
The formula explains the order. Vertiv is not the largest company in the layer — Schneider and Delta are each about 1.7 times its size — but E enters squared, so Vertiv's 80% exposure gives it 10 times the exposure factor of Schneider's 25%, and it hits the 5% cap. AVC, with a 45% midpoint, takes the second slot despite a $42bn capitalization. Legrand, at 21% exposure, sits just above the entry threshold and carries the smallest weight; a half-point revision of its exposure estimate (21% to 21.5%) changes its raw weight by about 4.8%, while a 20% move in its share price changes it by about 9.5% (weight scales with the square root of capitalization), so the estimate matters, but a large price move matters more. The layer's weighted exposure was 44.4% at the 16 October cut, between Power (29.7%) and Connectivity (76.5%).
The leaders
Vertiv (VRT) — the pure play of the layer
Vertiv sells the critical infrastructure inside the white space and the plant room: UPS and power distribution, thermal management from chillers to liquid-cooling CDUs and rear-door heat exchangers, racks and integrated modular solutions, and the service contracts that follow the installed base. Its exposure estimate of 75–85% is the highest in the layer; the balance is telecom and commercial-industrial.
In the third quarter of 2026 net sales were $4,313m, 61% above a year earlier (55% organic plus about 6% from acquisitions), with the Americas up 75%; adjusted operating profit was $1,087m at a 25.2% margin (+290 bp); adjusted free cash flow $652m. Organic orders grew more than 100% year on year. The company raised full-year 2026 guidance to net sales of $14,450–14,850m (37–39% organic growth), adjusted operating profit of $3,475–3,555m, adjusted diluted EPS of $7.10–7.20 and adjusted free cash flow of $2,600–2,800m, and guided the fourth quarter to $4,313–4,513m of sales and 49–51% organic growth; capex for 2026 is planned at about 4% of revenue, and the company reports a net cash position with $6.2bn of liquidity (Q3 2026 results, 8-K of 28 Oct 2026). Vertiv does not disclose backlog quarterly; the last year-end figure was $15.0bn.
What the company says about its prospects: "We are in the middle of the largest infrastructure buildout and it's accelerating"; it is "compressing new product development cycles from years to months" and "industrializing converged infrastructure at a scale that didn't exist before".
Asia Vital Components (3017) — the cold plate in the accelerator rack
AVC is a Taiwanese thermal-management manufacturer whose liquid-cooling cold plates, manifolds and coolant distribution units sit on NVIDIA's and AMD's accelerator boards and in the racks of hyperscalers' custom ASIC systems; fans, heat sinks and air-cooling modules for servers and PCs make up the rest. Its exposure estimate (35–55%) reflects a business that moved from PC and notebook cooling to data centers within three years.
Third-quarter 2026 revenue was NT$59.09bn, up 20.3% quarter on quarter and 51.8% year on year; gross margin rose to 33.86% (+7.74 points year on year), operating margin to 28.5% and net profit attributable to shareholders to NT$11.56bn (+116.6%), with EPS of NT$29.32 for the quarter. October revenue was NT$22.10bn, up 34% year on year. At its 10 November investor conference the company said double-sided cold plates had started shipping, that it expects ASIC-related revenue to exceed GPU-related revenue in 2027 as cloud customers scale their own accelerators, that it plans to raise liquid-cooling capacity by more than 50% in 2027 with Vietnam as the main site, and that it estimates 2027 capex at NT$15–20bn after about NT$15bn in 2026 (Pocket, 10 Nov 2026; Economic Daily News, 9 Nov 2026).
What the company says about its prospects: demand is positive for the fourth quarter and 2027, and liquid-cooling supply remains short of demand with no price pressure yet. The relevant caveat: AVC's revenue is tied to accelerator unit volumes at a handful of customers, so it carries the compute layer's cycle inside the thermal layer.
Delta Electronics (2308) — power supplies and racks for the AI server
Delta is Taiwan's largest power-electronics group: server power supplies and power shelves, the ±400 V and 800 V direct-current power racks for the next generation of accelerator systems, UPS, liquid cooling, and a broad industrial, automotive and infrastructure business. Its data-center exposure is estimated at 20–35%, and management said at its 29 October investor conference that AI-related business is now about half of total revenue across power, thermal, components and ICT infrastructure.
Third-quarter 2026 consolidated revenue was NT$197.06bn, a record, up 7.5% quarter on quarter and 31.1% year on year; January–September revenue was NT$539.67bn, up 37.2% (TechNews, 12 Oct 2026). At the investor conference the chairman said fourth-quarter revenue would be higher than the third quarter's with a gross margin no lower, that ±400 V HVDC products began shipping in the third quarter with 800 V to follow in 2027, that liquid cooling was about NT$25bn of revenue in the first nine months (about 13% of sales), and that the board had approved a large new production site in Penang, Malaysia. He also listed the constraints that make supply-chain revenue uneven: material shortages, power-supply constraints, technical labour and local permitting (Anue/uanalyze, 29 Oct 2026).
What the company says about its prospects: AI and data-center businesses remain the main growth drivers for 2027, with hyperscaler capex it puts above $700bn this year and global data-center capex of $1.2–1.5tn next year, and demand it expects to last through 2030.
Comfort Systems USA (FIX) — the contractor who installs it all
Comfort Systems is the largest US mechanical and electrical contractor focused on data centers: it designs, fabricates (increasingly in modular form, off site) and installs the HVAC, piping, plumbing and electrical systems of the building. Its exposure estimate (30–40%) understates the current mix: the technology sector was 61% of revenue in the third quarter against 46% a year earlier (10-Q summary, Panabee, 22 Oct 2026).
Revenue in the quarter was $3.77bn against $2.45bn a year earlier (+54%); net income $489.0m, or $13.91 per diluted share (+69% per share); operating cash flow $1.01bn in a single quarter. Backlog at 30 September was $17.81bn, up from $14.06bn at 30 June and $9.38bn a year earlier — a sequential gain of $3.8bn and a year-on-year gain of more than $8bn (Q3 2026 results, 8-K of 22 Oct 2026). The company does not publish numerical guidance.
What the company says about its prospects: "through year end and for 2027 we are well-positioned to grow organically, and to maintain high levels of profitability and solid ongoing cash flow"; it describes demand as "relentless". The caveat the index cares about is that a contractor's revenue is the build itself: it is the layer's most direct read on construction activity and the first to feel a pause in groundbreakings.
Schneider Electric (SU) — the electrical backbone, from switchgear to software
Schneider is the largest electrical-equipment company in the index by revenue. Its Energy Management segment supplies medium- and low-voltage switchgear, transformers, UPS, prefabricated data-center modules, cooling (through Motivair) and the EcoStruxure software that manages them; Industrial Automation is the rest. Data centers and networks are one of its four end markets, and the exposure estimate (22–28%) reflects that segment's share of group revenue.
Third-quarter 2026 revenue was €11.46bn, up 16.9% organically — the strongest quarter in the company's history, with Energy Management up 19% — and data-center orders grew at triple-digit rates for the third time in four quarters. The company raised its 2026 targets for the second time this year, to organic revenue growth of 12–14% (from 10–13%) and organic adjusted EBITA growth of 18–21% (from 14–19%) (Reuters via WHBL, 16 Oct 2026; Facilities Dive, 20 Oct 2026).
What the company says about its prospects: the data-center business "continues to be exceptionally strong" and improves visibility into 2027 and 2028, with North American demand led by prefabricated solutions and cooling and Chinese growth led by AI infrastructure. Schneider does not break out hyperscale, colocation and neocloud customers.
nVent Electric (NVT) — enclosures, liquid cooling and, from October, power distribution
nVent makes electrical enclosures, liquid-cooling systems (CDUs and manifolds), cable management, busway and power distribution for data centers, industry and infrastructure. The acquisition of Maverick Power, closed on 1 October 2026, adds low- and medium-voltage switchgear and modular power solutions with about $700m of 2026 revenue; management says the combined offering raises nVent's addressable content to about $2m per megawatt. Exposure is estimated at 30–45%.
Third-quarter 2026 sales were $1,515m, up 44% both reported and organic, with the Systems Protection segment up 53% (infrastructure sales up about 90%, led by data centers) and new products contributing about 30 points of growth; adjusted operating margin was 22.1% (+190 bp); adjusted EPS $1.52 (+67%); organic orders grew at a low-double-digit rate against a strong comparison and backlog rose sequentially to $2.6bn. The company raised 2026 guidance to reported sales growth of 48–49% (organic 38–39%) and adjusted EPS of $5.36–5.39 (Q3 2026 results, 8-K of 30 Oct 2026; segment detail from Zacks, 2 Nov 2026). A liquid-cooling plant in Blaine, Minnesota and a 400,000 sq ft engineered-building facility in Arizona are due to start production in 2027.
What the company says about its prospects: "record sales and orders", double-digit growth in all verticals led by infrastructure, and "another outstanding year" on track.
Lite-On Technology (2301) — power supplies for the AI rack
Lite-On is a Taiwanese maker of power supplies for servers and networking, LED and optoelectronic components, and consumer power products. Its data-center line now includes 8.5 kW power supply units for ASIC systems, battery backup units, power shelves and, from the fourth quarter of 2026, prototype 800 V DC power racks; exposure is estimated at 20–35%.
Third-quarter 2026 consolidated sales were NT$57.4bn, up 9% quarter on quarter and 28% year on year, with cloud and IoT revenue up nearly 60%; gross margin was 25.9%, operating margin 15.1% (+4.7 points) and EPS NT$3.27, a record (+60%). For the first nine months, revenue rose 26% to NT$153.5bn and cloud-computing revenue 80%; management said AI-related revenue is now more than 30% of total revenue this year. The board approved an investment to expand high-power transformer and inductor capabilities and a spin-off of the rack business (Q3 2026 results, PR Newswire via Webull, 2 Nov 2026).
What the company says about its prospects: core businesses are expected to grow both year on year and quarter on quarter in the fourth quarter, driven by AI power-management upgrades and volume production of integrated power and energy-storage racks.
Legrand (LR) — white-space products with a ~40% growth rate
Legrand is a French maker of electrical and digital building infrastructure; its data-center business — busways, PDUs, racks and cabinets, cable management and connectivity — has been built partly through acquisitions (seven in 2026 so far, about €450m of combined annual revenue). Exposure is estimated at 18–24%, the lowest in the layer and just above the entry threshold.
Nine-month 2026 revenue was €8,329m, up 19.5% reported and 12.7% organically, with third-quarter organic growth of 18.8%; the adjusted operating margin was 20.8%. The chief executive put organic growth in data-center activities at nearly 40% over the period. The company raised its 2026 organic growth target to 11–13% (from 8–10%), with a scope effect of about 8% and an adjusted operating margin of 20.5–21.0% (results for the first nine months, Idéal Investisseur, 5 Nov 2026).
What the company says about its prospects: the raised target is attributed to data-center demand; the margin target is unchanged, which is the company's own statement that growth is being bought at stable, not rising, profitability.
Reading the layer
| Metric | VRT | AVC | SU | FIX | Delta | NVT | Lite-On | LR |
|---|---|---|---|---|---|---|---|---|
| Market cap, 13 Nov 2026 | $77.8bn | $36.3bn | $151.6bn | n/a | $97.7bn | $18.6bn | n/a | $39.5bn |
| Revenue, TTM | $11.5bn | $5.8bn | $47.0bn | n/a | $20.6bn | $4.8bn | n/a | $11.3bn |
| Revenue growth | +26% | +99% | +7% | n/a | +39% | +46% | n/a | +10% |
| EBITDA margin | 23.3% | 25.4% | 20.3% | n/a | 21.5% | 21.7% | n/a | 22.0% |
| EV / EBITDA | 29× | 24× | 18× | n/a | 22× | 19× | n/a | 19× |
| Latest quarter reported | 28 Oct | 10 Nov | 16 Oct | 22 Oct | 29 Oct | 30 Oct | 2 Nov | 5 Nov |
Catalog metrics from the company pages at the 13 November 2026 quote date; trailing twelve months to the last catalog period (mostly 30 June 2026). FIX and Lite-On metrics are not yet in the catalog ("n/a"); their quarterly figures are in the sections above.
Three readings. First, this is the layer where the build-out's physical bottlenecks show up as order books: Comfort Systems' backlog has nearly doubled in a year, GE Vernova's grid equipment backlog (in the Power layer) is up 60%, nVent's content per megawatt is rising as power distribution is added to cooling, and Vertiv's orders doubled. Second, the layer's companies state their exposure in different units — Delta says AI is about half of revenue, Lite-On more than 30%, Comfort Systems reports technology at 61% of revenue — while the index uses estimates that are generally lower and dated to when the share crossed 15%; these estimates are the first candidates for revision at the next annual review, and because weight depends on E², a revision would move the layer's weights more than any price change. Third, the layer took the middle path in the autumn repricing — the catalog's thermal and electrical names fell 16.8% from 9 October to 13 November against −26% for compute and −0.2% for power generation (Two prices for a megawatt) — consistent with businesses that are paid for construction already contracted but whose orders depend on construction still to be decided.
Limits of this reading
- Exposure estimates are analyst estimates on segment reporting, dated from the month the share is judged to have reached 15%; the companies' own statements (Delta "about half", Lite-On "more than 30%") are not used directly because they are not comparable across issuers.
- Taiwanese and French figures are in local currency as reported; growth rates for AVC, Delta and Lite-On are from company releases and press coverage of investor conferences, cited by date.
- Weights are observed at 13 November and will be reset at the December rebalance.
- This note describes a research index and the businesses of its constituents; it is not investment advice, a recommendation or an offer. See the disclaimer.
Frequently asked questions
Why is Eaton not in the Thermal & Electrical layer?
Eaton's estimated share of revenue from the data-center ecosystem is 17–22%, a midpoint of 19.5% — half a point below the 20% entry threshold after rounding. A revision of the estimate at the next annual review would make it eligible; it would then rank among the largest candidates by capitalization.
Why does Vertiv carry the layer's largest weight when Schneider and Delta are bigger companies?
Weight is proportional to E² × √cap. Vertiv's exposure midpoint of 80% enters squared (0.64) against 0.0625 for Schneider's 25%, which outweighs Schneider's larger capitalization; Vertiv reaches the 5% company cap.
Why are Modine, Auras and Munters not included although they pass the exposure test?
Each layer takes at most eight names, ranked by capitalization proxy at the May selection. Modine, Auras, Munters and AAON pass the exposure test but are not among the eight largest eligible candidates; they are reconsidered at the next annual selection.
Does the index use the data-center shares the companies state themselves?
No. The companies report in different units (AI-related revenue, cloud revenue, technology-sector revenue) and the index needs one comparable measure, so it uses analyst estimates of the data-center ecosystem share, as a low–high range with the midpoint applied. Company statements are cited in the notes for context.
The analytical framework and worked examples are HASHFLOPS.IO editorial analysis. Numerical examples use stated assumptions and are not current market quotations. Nothing on this page is investment advice or an offer; see the disclaimer.