Key takeaways
- Layer 5 of the Data Center Full Cycle Index is the last link: the companies that own the building, hold the power contract and lease the kilowatt to a tenant. It holds four operators — Equinix, Digital Realty, NEXTDC, GDS Holdings — and a four-name HPC-hosting sleeve of former bitcoin miners — TeraWulf, Applied Digital, Hut 8, Cipher Digital — selected from 22 candidates.
- It is the purest layer in the index (weighted exposure 89.5%): operators and data-center REITs earn all of their revenue from the data center, so the E² term in the weight formula does no work and the layer is ranked by size alone — Equinix and Digital Realty at the 5% cap, NEXTDC and GDS sharing the rest of the core budget by √cap. The sleeve admits miners on dated evidence of HPC leases, 2% per name if the capacity is operating (TeraWulf, Applied Digital) and 1% if only contracted (Hut 8, Cipher).
- The operators reported record leasing: Digital Realty signed $855m of annualized rent in a quarter with a $2.5bn backlog and 11.8% cash renewal uplifts; Equinix booked a record $533m and raised guidance for the third time in 2026; NEXTDC's contracted capacity tripled to 740 MW and it guided FY27 capex to A$5.25–5.75bn. The landlords hold leases they value at about $60bn across four companies — TeraWulf's 20-year, ~$19bn lease with Anthropic backstopped by Google, Hut 8's ~$26.6bn portfolio, Cipher's $9.1bn Barber Lake lease, Applied Digital's $5.2bn Delta Forge 2 lease — while reporting quarterly revenue of $27m (Cipher) to $76m (TeraWulf) for three of them; Applied Digital's fiscal first quarter was $341.9m, so the four together reported about $0.5bn.
- The layer was the index's defensive end in the autumn: the catalog's capacity names lost 9.3% between 9 October and 13 November against −26% for compute, and the two large REITs are now the index's biggest overweights after Talen (6.6% and 6.5% against 5% targets). The sleeve moved the other way — Cipher's observed weight is 45% below target — which is the market's judgement that a contracted lease is worth less than a billing one.
Not investment advice. This note describes the composition of a research index and the businesses of its constituents as the companies themselves report them. It is informational research only: not investment advice, not a recommendation to buy, sell or hold any security, and not an offer or solicitation. Companies are named because they are index constituents, not because they are endorsed; figures and guidance are the companies' own statements, quoted with their dates. See the disclaimer.
Why the index exists
The AI build-out is a chain of five businesses, and a single company measures only its own link. The Data Center Full Cycle Index groups 35 listed companies into five layers — power, thermal and electrical systems, connectivity, compute, capacity — and weights each by the estimated share of its revenue earned from the data-center ecosystem. The base is 1,000 at 30 June 2025; the official level closed at 2,044.04 on 13 November 2026, 32% below the June peak. The methodology is pre-registered and the constituent files are public. This series takes each layer in turn — Power, Thermal & Electrical, Connectivity, Compute — and this note covers Layer 5, Capacity.
The layer exists because capacity is where the chain is priced in the unit the rest of this site uses: the megawatt. Everything upstream — turbines, chillers, optics, accelerators — is sold once; the operator sells the same megawatt every month for the life of a lease, and the price it gets (rent per kilowatt-month, lease term, escalators, who pays for power) is the clearest market signal of what a megawatt of AI capacity is worth. The HPC-hosting sleeve exists for a narrower reason: since 2024 bitcoin miners with grid connections have converted sites into AI data centers under long leases, and their filings disclose rent, term and cost per megawatt in a detail the large REITs do not; the Value per MW and mining-to-hosting notes are built on those disclosures. Including them lets the index observe the marginal megawatt as well as the installed base.
How the leaders of the Capacity layer are chosen
The general rules apply: estimated data-center revenue share E of at least 20% to enter and 15% to stay; capitalization proxy of at least $2.0bn, 60-day median turnover of at least $10m, free float of at least 10%, listing age of at least 180 days; annual selection on the last business day of May, up to eight names per layer ranked by capitalization proxy; weight within the layer proportional to E² × √(capitalization proxy), capped at 5% per company; quarterly rebalance. As in Compute, a GPU-cloud/HPC sleeve admits companies on dated primary evidence of HPC hosting, usable 30 days after publication, with at most four names and 5% of the index per layer, each capped at 2% if the capacity is operating and 1% if only contracted; the sleeve's four names take four of the eight seats and the core keeps four.
The 2026 universe held 22 candidates in this layer. The exposure test removes Iron Mountain (E 9–12%) and Brookfield Infrastructure (10–20%); Galaxy Digital, WhiteFiber and Riot Platforms are on watch pending usable HPC evidence. Among the remaining pure plays — DCI Indonesia, SUNeVision, Keppel DC REIT, VNET, Digital Core REIT, Mapletree Industrial Trust, Macquarie Technology, Sify — the gates on turnover and free float and the ranking by size leave the four core seats to Equinix, Digital Realty, NEXTDC and GDS. Core Scientific (HPC evidence, E 83%) is the fifth-largest sleeve candidate by capitalization and the first in line should one of the four sleeve names leave.
| Company | Ticker | Group | What it sells | E (mid) | Cap proxy, 9 Oct | Target weight, 30 Sep | Observed, 13 Nov |
|---|---|---|---|---|---|---|---|
| Equinix | EQIX | core | retail colocation, interconnection, xScale hyperscale campuses, 270+ data centers | 100% | $101.2bn | 5.00% | 6.60% |
| Digital Realty | DLR | core | hyperscale and colocation capacity, 311 data centers, ~3.2 GW IT capacity | 100% | $62.8bn | 5.00% | 6.50% |
| GDS Holdings | GDS | core | hyperscale data centers in China; minority stake in DayOne (international) | 100% | $6.0bn | 3.17% | 2.55% |
| NEXTDC | NXT | core | colocation and hyperscale campuses in Australia, New Zealand, Malaysia, Japan | 100% | $5.5bn | 3.08% | 3.52% |
| TeraWulf | WULF | sleeve (operating) | HPC hosting at Lake Mariner (NY) and Kentucky campuses; bitcoin mining | 71% disclosed | $6.9bn | 1.50% | 1.62% |
| Applied Digital | APLD | sleeve (operating) | HPC campuses in North Dakota (Polaris Forge); accelerated-compute platform | 78% | $7.2bn | 1.50% | 1.25% |
| Hut 8 | HUT | sleeve (contracted) | power-first developer: River Bend (LA), Beacon Point; bitcoin mining | n.d. | $10.4bn | 1.00% | 0.85% |
| Cipher Digital | CIFR | sleeve (contracted) | HPC campuses in Texas (Barber Lake, Black Pearl, Stingray); bitcoin mining | n.d. | $5.6bn | 1.00% | 0.55% |
| Layer 5 total | 21.25% | 23.44% |
Source: constituents and composition files; observed weights are after price drift since the 30 September rebalance. Hut 8 and Cipher carry no exposure estimate because their HPC revenue had not begun at the selection date; they are admitted as "contracted" at the 1% cap.
The arithmetic is simple here. With E = 100% for all four core names the formula reduces to √cap: Equinix and Digital Realty exceed the 5% cap, and the remaining 6.25 points of core budget split between GDS (√6.0) and NEXTDC (√5.5) at 3.17% and 3.08%. The sleeve's 5% is fully used: two operating names at 1.5% (below the 2% cap, because four names share 5%) and two contracted names at 1%. The layer's weighted exposure was 89.5% at the 16 October cut, the highest of the five.
The leaders
Equinix (EQIX) — interconnection and retail colocation, with hyperscale through xScale
Equinix operates more than 270 data centers in more than 70 metros; its core product is retail colocation sold by the cabinet with interconnection between the customers inside — the cloud on-ramps, exchanges and the Fabric virtual-interconnection service — and it builds hyperscale campuses through the xScale joint ventures. Exposure is 100%.
Third-quarter 2026 revenue was $2.571bn, up 11% (12% at constant currency); adjusted EBITDA $1.321bn (+15%); AFFO $1.156bn (+20%), or $11.64 per share (+18%). Annualized gross bookings were a record $533m, up 35%; monthly recurring revenue grew at a double-digit rate for the fourth consecutive quarter; interconnection revenue grew 10% and Fabric revenue 24%. The company said it plans to deliver nearly 40% more cabinets in 2026 than initially anticipated and raised full-year guidance for the third consecutive quarter: revenue of $10.325–10.365bn (about +12%), adjusted EBITDA of $5.29–5.33bn (about a 51% margin, +200 bp) and AFFO per share of $43.71–44.11 (+11–12%), with non-recurring capex of $4.71–5.69bn (Q3 2026 results, 8-K of 28 Oct 2026).
What the company says about its prospects: "double-digit growth across the key metrics that drive long-term value creation", with new products (Fabric One, Inference Exchange) aimed at enterprise inference workloads, and a "diverse customer base, expanding ecosystem, and balance sheet strength". Filings: Equinix filings page.
Digital Realty (DLR) — the largest hyperscale landlord, booking $855m of rent in a quarter
Digital Realty owns 311 data centers (88 in unconsolidated joint ventures) with about 3.2 GW of IT capacity and 9.8 GW of buildable capacity, leasing to hyperscalers in the >1 MW category and to enterprises and networks in the 0–1 MW and interconnection categories. Exposure is 100%.
Third-quarter 2026 revenue was $1.9bn, up 21% year on year; Core FFO per share was $2.10 (Q3 2025: $1.89). Bookings were a record $855m of annualized GAAP base rent at 100% share ($627m at Digital Realty's share, including a record $152m in the 0–1 MW and interconnection categories), on 267 MW at an average $259 per kW per month; renewal rents rose 11.8% on a cash basis; the backlog of signed-but-not-commenced leases reached a record $2.5bn at 100% share ($1.8bn at share), with a 17-month average lag to commencement. The company bought $742m of land in the quarter — near Indianapolis for more than 1 GW, Charlotte for up to 600 MW, Chicago for 360 MW — raised its stake in Teraco to about 77%, closed $1.4bn of cornerstone equity for a perpetual-capital vehicle for stabilized hyperscale assets, and raised 2026 Core FFO per share guidance to $8.30–8.35 (Q3 2026 results and supplement, 8-K of 29 Oct 2026).
What the company says about its prospects: "record leasing, an expanding backlog, and another quarter of double-digit earnings growth" that "underscore the global strength of customer demand for connectivity-rich environments". The backlog figure is the layer's best forward indicator: $2.5bn of rent signed but not yet billing (at 100% share; $1.8bn at Digital Realty's share) is a quarter to a third of current annual revenue. Filings: Digital Realty filings page.
NEXTDC (NXT) — Australia's hyperscale developer, contracted capacity tripled
NEXTDC develops and operates colocation and hyperscale campuses in Sydney, Melbourne, Brisbane, Perth, Adelaide, Auckland, Kuala Lumpur and Tokyo. Exposure is 100%; it is the only constituent whose fiscal year ends in June.
For the year to 30 June 2026 total revenue was A$496.5m (+16%), net revenue A$405.0m (+16%), underlying EBITDA A$248.8m (+15%) and statutory net profit A$82.1m against a loss the year before. Contracted utilisation rose 202% to 740.1 MW — the largest contracting year in the company's history — and the forward order book stood at 565.1 MW, more than 3.2 times billing utilisation; capex was a record A$3,397m and pro-forma liquidity A$8.7bn. Guidance for FY27 is net revenue of A$615–640m, underlying EBITDA of A$385–410m and capex of A$5.25–5.75bn, with 197 MW of contracted capacity expected to convert to billing in FY27 and a further 221 MW in FY28 (FY26 results via The Motley Fool Australia, 27 Aug 2026).
What the company says about its prospects: a contracted pipeline more than three times the billing base, converting over two years. The caveat is the one the capex number states: A$5.25–5.75bn of spending against A$0.4bn of EBITDA is a development company's balance sheet, financed by the A$8.7bn of liquidity it raised.
GDS Holdings (GDS) — China's hyperscale operator, record sales commitments in 2026
GDS develops and operates hyperscale data centers in China's main hubs for cloud providers, internet companies and financial institutions, and holds a minority stake in DayOne, the Singapore-headquartered international platform it spun out. Exposure is 100%.
Second-quarter 2026 net revenue was RMB 3,088.0m (+6.5%), net income RMB 837.6m (a loss a year earlier) and adjusted EBITDA RMB 1,406.0m (+2.5%) at a 45.5% margin; total area committed and pre-committed grew 18.2% to 784,802 sqm and the utilization rate was 79.2%. The chairman said the company was "on track to achieving a record sales commitment for this year, which is much higher than our original target … driven mainly by AI demand" (Q2 2026 results, 6-K of 13 Aug 2026). Third-quarter results are scheduled for 25 November 2026 (6-K of 12 Nov 2026).
What the company says about its prospects: "massive opportunities" in China driven by AI demand, with "strengthened financial standing and funding capabilities". The caveat is that revenue growth of 6.5% is the slowest in the layer while commitments grow at 18%: the gap is backlog that bills when delivered, as for the other operators, but in a market whose power and chip supply are shaped by policy. Filings: GDS filings page.
TeraWulf (WULF) — Lake Mariner billing, Justified contracted to Anthropic
TeraWulf owns the Lake Mariner site in New York (hydro and nuclear-fed grid power) and is developing two campuses in Kentucky; it leases critical IT capacity to tenants who bring their own accelerators, and still mines bitcoin on the remaining power. Its exposure of 71% is the disclosed HPC share of revenue, and it is in the sleeve as "operating" because rent commenced in 2025.
Third-quarter 2026 revenue was $76.2m, of which HPC lease revenue was $63.0m (about 83%); net income of $709.9m reflected a non-cash gain on warrants, and adjusted EBITDA was about −$12.8m. At Lake Mariner 102 MW of critical IT capacity was billing at quarter-end with 336 MW under construction (CB-4 to commence rent in the fourth quarter, CB-5 from early 2027) within the stated cost of $8–10m per critical IT megawatt. At the Justified campus the company has a 20-year lease with Anthropic for about 401 MW of critical IT capacity, about $19bn of contracted revenue over the initial term, with a Google credit backstop announced on 4 November for the project financing and an EPC agreement with Fluor; phased completions are expected from late 2027 to the second quarter of 2028. Contracted power at the Muskie campus doubled to 1 GW. The company held about $2.4bn of cash and reaffirmed a target of contracting 250–500 MW of incremental critical IT capacity a year (Q3 2026 results, 8-K of 6 Nov 2026).
What the company says about its prospects: "Lake Mariner is delivering contracted capacity and generating revenue, Justified has the customer, credit support and construction framework to move forward at scale, and Muskie gives us a contracted path to a gigawatt of power." Filings: TeraWulf filings page.
Applied Digital (APLD) — Polaris Forge, 250 MW live and a second campus leased
Applied Digital designs, builds and operates purpose-built AI data centers; its Polaris Forge 1 campus in North Dakota is leased to a single investment-grade hyperscaler, and a second campus (Delta Forge 2) was leased to the same tenant in June 2026. Its majority-owned ChronoScale subsidiary holds the former cloud business. Exposure is 78%.
In its fiscal first quarter of 2027 (to 31 August 2026) revenue was $341.9m, up 322%, or $300.4m excluding ChronoScale; the net loss attributable to common stockholders was $221.0m, adjusted EBITDA $64.4m and net operating income $58.8m. The 210 MW, 15-year Delta Forge 2 lease represents about $5.2bn of base-term contracted revenue; the second 75 MW phase of Building 2 at Polaris Forge 1 was delivered on 1 October, taking live capacity at the campus to 250 MW; the third building (150 MW) is financed with $1.59bn of 7.000% senior secured notes due 2031. After quarter-end the company secured up to about 1 GW of potential power capacity in Finland and signed a power purchase agreement with Base Electron for an approximately 1,200 MW gas-fired plant to be developed in North Dakota (Q1 FY2027 results, 8-K of 7 Oct 2026).
What the company says about its prospects: the goal is "to establish Applied Digital as the category leader in the design, construction, deployment, and operation of purpose-built AI factories", with "durable, high-quality, long-term contracts with proven, tier-one, investment grade hyperscalers". The caveat is single-tenant concentration: one customer leases both campuses. Filings: Applied Digital filings page.
Hut 8 (HUT) — power first, $26.6bn of leases, first data hall due in 2027
Hut 8 describes itself as an energy infrastructure platform: it originates power capacity, develops the data center and leases it, while operating bitcoin mining and managed services on existing sites. It entered the sleeve as "contracted" at the 1% cap because its AI leases (River Bend in Louisiana and Beacon Point) had not begun billing at the selection date; no exposure estimate is assigned until they do.
Third-quarter 2026 revenue was $71.1m (Q3 2025: $83.5m), of which compute (mining) was $68.4m; net income of $189.5m included $413.8m of mostly unrealized gains on digital assets, and adjusted EBITDA was $33.0m. During the quarter the company signed a second 352 MW IT lease at Beacon Point with the Phase 1 tenant, taking the expected base-term contract value across its AI data-center portfolio to about $26.6bn; utility capacity under construction rose to 1,330 MW (330 MW at River Bend, 1,000 MW at Beacon Point), with first data-hall deliveries targeted for the second quarter of 2027 at River Bend, the third quarter of 2027 at Beacon Point Phase 1 and the second quarter of 2028 at Phase 2; energy capacity under exclusivity rose by 1,300 MW to 3,180 MW. It closed a $1.07bn revolving credit facility, repurchased $250m of shares funded by bitcoin sales and raised the authorization to $1.0bn (Q3 2026 results, 8-K of 4 Nov 2026).
What the company says about its prospects: the projects are expected to be "funded entirely at the project level, without requiring equity issuance or recourse debt at the parent", and "the first of those obligations comes due with the delivery of the first data hall at River Bend in the second quarter of 2027". For the index, that delivery is the event that would move Hut 8 from the 1% contracted cap to the 2% operating cap. Filings: Hut 8 filings page.
Cipher Digital (CIFR) — first HPC rent, Barber Lake extended to 20 years
Cipher develops industrial-scale data centers in Texas on its own power contracts; its HPC campuses are Barber Lake (leased for a first 10-year term and, for a second term, directly to a leading AI lab), Black Pearl and Stingray, with bitcoin mining on the remaining capacity. It entered the sleeve as "contracted" at the 1% cap.
Third-quarter 2026 revenue was $27m and adjusted EBITDA about −$10m; the company recognized its first HPC lease revenue after rent commenced at Black Pearl. An amendment to the Barber Lake lease added a second 10-year term directly with the AI lab, extending the lease to 20 years and raising contracted revenue at the site to about $9.1bn (about $5.2bn incremental), with a phased delivery schedule; it was funded in part by an $850m offering of 0% convertible notes due 2032. Through ERCOT's Batch Zero process the company received a conditional base-load classification for 1 GW at Colchis and conditional studied-load classifications for a further 1.6 GW; it began developing lateral gas pipelines to support up to 2.5 GW of on-site generation and acquired Horizon, a 70 MW site due to energize in 2029. The development pipeline totals about 5.9 GW (Q3 2026 business update, 8-K of 2 Nov 2026).
What the company says about its prospects: "Demand for compute is growing, and our relationships with leading hyperscalers and AI labs are deepening"; it is "investing earlier in every project and advancing design work before committing to new leases". With rent now recognized, Cipher's first HPC revenue share will be measured at the next review, which could move it to the operating cap. Filings: Cipher filings page.
Reading the layer
| Metric | EQIX | DLR | NXT | GDS | WULF | APLD | HUT | CIFR |
|---|---|---|---|---|---|---|---|---|
| Market cap, 13 Nov 2026 | $104.0bn | $68.0bn | $5.2bn | $4.0bn | $6.3bn | $4.7bn | $7.1bn | $2.8bn |
| Revenue, TTM | $9.9bn | $6.8bn | $0.35bn | $1.8bn | $0.17bn | $0.61bn | $0.32bn | $0.19bn |
| Revenue growth | n/a | +17% | +16% | +12% | +15% | +167% | +130% | +20% |
| EBITDA margin | 45.9% | 47.5% | 38.1% | 44.8% | negative | negative | negative | 50.3% |
| EV / EBITDA | 28× | 27× | 53× | 11× | n.m. | n.m. | n.m. | 79× |
| Contracted but not yet billing (company-stated) | — | $2.5bn annualized rent (100% share) | 565 MW forward order book | commitments +18% y/y | ~$19bn (Justified, 401 MW) | ~$5.2bn (Delta Forge 2, 210 MW) | ~$26.6bn portfolio contract value | ~$9.1bn (Barber Lake) |
| Latest quarter reported | 28 Oct | 29 Oct | 27 Aug (FY) | 13 Aug | 6 Nov | 7 Oct | 4 Nov | 2 Nov |
Catalog metrics from the company pages at the 13 November 2026 quote date; trailing twelve months to the last catalog period (mostly 30 June 2026). The sleeve names' EBITDA is negative or negligible while campuses are under construction; the contract figures are the companies' own statements of base-term or annualized value and are not comparable across companies (term, share, gross versus net of power).
Three readings. First, the layer records the same fact twice in different units. The REITs say it as backlog and bookings — Digital Realty's $2.5bn of rent signed and not yet billing, Equinix's 40% more cabinets than planned, NEXTDC's 565 MW order book — and the sleeve says it as contract value, where four companies with combined quarterly revenue of about $0.5bn hold leases they value at about $60bn over 15–20 years. Both are claims on megawatts that do not yet exist, and the gap between them and today's revenue is the construction the other four layers are paid to do. Second, the market priced the two groups in opposite directions in the autumn: the REITs rose above their caps (Equinix 6.6%, Digital Realty 6.5%) while Cipher fell 45% below target and Applied Digital 17% below; capacity as a whole lost 9.3% between 9 October and 13 November against −26% for compute (Two prices for a megawatt). The index does not decide whether that discount on contracted-but-unbuilt capacity is right; it is the subject of the Value per MW series. Third, the sleeve is the part of the index most likely to change by event rather than by selection: River Bend's first data hall (Q2 2027) would move Hut 8 to the operating cap, Cipher's first rent already qualifies it for re-measurement, and Core Scientific is next in line for a seat.
Limits of this reading
- The REITs report revenue and FFO under US GAAP; NEXTDC reports in Australian dollars for a June fiscal year; GDS in RMB with a US dollar convenience translation. Growth rates are catalog figures and may differ from the quarterly figures above.
- Contract values are the companies' own statements of base-term value over 15–20-year leases and are not discounted, not adjusted for share of ownership and not comparable with annualized rent.
- Exposure for the sleeve names is a disclosed HPC revenue share (TeraWulf) or an estimate (Applied Digital); Hut 8 and Cipher carry none until their HPC revenue is reported for a full period.
- Weights are observed at 13 November and will be reset at the December rebalance.
- This note describes a research index and the businesses of its constituents; it is not investment advice, a recommendation or an offer. See the disclaimer.
Frequently asked questions
Why do Equinix and Digital Realty have the same weight when Equinix is larger?
Both have an exposure of 100% and both exceed the 5% company cap under the E² × √cap formula, so both are held at 5% at target. Their observed weights differ only by price drift since the last rebalance.
Why are bitcoin miners in a data-center index?
Four former miners — TeraWulf, Applied Digital, Hut 8 and Cipher — are admitted through the HPC-hosting sleeve on dated primary evidence of AI-hosting leases, with a 30-day lag. Each is capped at 2% of the index if its HPC capacity is billing and 1% if it is only contracted; the four together may not exceed 5%. Their filings disclose rent, term and cost per megawatt, which the index uses to observe the price of new capacity.
What is the difference between "operating" and "contracted" in the sleeve?
Operating means HPC lease revenue has commenced (TeraWulf at Lake Mariner, Applied Digital at Polaris Forge 1), which allows a 2% cap. Contracted means leases are signed but rent has not started (Hut 8, Cipher at the selection date), which limits the name to 1%. Cipher recognized its first HPC rent in the third quarter of 2026 and Hut 8 targets its first data hall in the second quarter of 2027; both are re-measured at the next review.
Why is Core Scientific not in the layer?
Core Scientific has usable HPC evidence and an exposure of 83%, but the sleeve holds at most four names and the four current members ranked above it by capitalization proxy at the selection. It would be first in line if a sleeve member left the index.
The analytical framework and worked examples are HASHFLOPS.IO editorial analysis. Numerical examples use stated assumptions and are not current market quotations. Nothing on this page is investment advice or an offer; see the disclaimer.