DIGITAL INFRASTRUCTURE / INVESTMENT INTELLIGENCERESEARCH PLATFORM · DATA CENTER FULL CYCLE INDEX · DATA AS OF 23 NOV 2026 · PUBLICATION LOG
MINING · VALUATION · EDITION 0.9.6 · COMPANY REPORT

CleanSpark, Inc. (CLSK): what a share is worth

How the value per share of CleanSpark, Inc. is built in three scenarios: every signed lease with its source, every megawatt the company reports, the chance of new leases, its mining sites and its balance sheet. Data as of 18 Nov 2026.

Edition 0.9.6 · published 21 Nov 2026Data as of 18 Nov 2026Checks passed: 0 errorsInput fingerprint b40059cbfd59…

Edition 0.9.6. Values are model results from company filings, company statements and dated market data, before tax (exception VX-2026-02 to the equity valuation standard), not price targets; nothing here is investment advice.

$6.12value per share, central scenario
$0.00 – $19.06cautious to optimistic; weighted average $7.49, +21% against the share price
$6.21share price on 18 Nov 2026 (data cut), within the range. Latest close $5.53 on 23 Nov 2026 (−11.0%): weighted average +35% against it
6.5%cap rate on the signed leases that matches the share price
Checked. Calculated three ways — engine, spreadsheet of formulas and a separate script from the text of the standard — with no difference larger than 0e+00 dollars a share. Compared with 2 other pages of the site that show CLSK: 12 figures agree, 1 differ for a stated reason. See the list →

Summary

In the central scenario the model values CleanSpark, Inc. at $6.12 a share; the share price was $6.21 on 18 November 2026. Per share the value adds up as follows: signed leases $5.45, the chance of new leases on capacity that has none yet $2.46, mining sites at the cost to rebuild them $1.17, mining machines $1.37; less company overhead $1.17, and debt and other claims net of cash and bitcoin $3.15.

Across the three scenarios the value runs from $0.00 (cautious) to $19.06 (optimistic). Weighting them 20%, 60% and 20% gives $7.49, 21% above the share price; the price is within the range. The optimistic scenario supplies 51% of the weighted average.

The share price is consistent with valuing the signed leases at a 6.5% cap rate (a year's operating income divided by the property value), against 6.5% for investment-grade tenants and 8.5% for other tenants in the central scenario. A higher cap rate means a lower value.

The share price is consistent with leasing 42% of the capacity that has no lease yet; the central scenario assumes 40% when weighted by value.

Leasing all convertible capacity would need about $12.91bn of building work, 8.1 times the company's stock-market value, and would give $9.78 a share in the central scenario. In the cautious scenario new building does not pay for itself, so the value with all capacity leased is $0.00.

665 MW of mining sites are counted at $0.45m per MW, the cost to rebuild them without the machines: $299m in total. At $0.5m per MW, the level at which operating sites sold in 2026, the central value would be $6.21 a share.

How the value adds up

Central scenario, US dollars per share

Green adds, orange subtracts; the blue bar is the value per share before the floor at zero; the dashed line is the share price on 18 Nov 2026.

CleanSpark, Inc.: how the central value per share adds upBars in US dollars per share for the central scenario: each part adds or subtracts, the last bar is the value per share; the dashed line is the share price.$0$2$4$6$8$10Signed leases: $5.45 per share ($1.40bn)$5.45LeasesChance of new leases on capacity without a lease: $2.46 per share ($632m)$2.46NewleasesMining sites at the cost to rebuild them: $1.17 per share ($299m)$1.17MiningsitesMining machines at market value: $1.37 per share ($351m)$1.37MachinesCompany overhead: −$1.17 per share (−$300m)−$1.17OverheadCash and bitcoin, less debt and other claims: −$3.15 per share (−$810m)−$3.15Debt lesscashValue per share before the floor at zero: $6.12$6.12Valueshare price$6.21
Part of the valueCautious, totalCentral, totalOptimistic, totalCautious, $ a shareCentral, $ a shareOptimistic, $ a share
Signed leases$520m$1.40bn$1.83bn$2.03$5.45$7.11
GPU cloud contracts$0m$0m$0m$0.00$0.00$0.00
Chance of new leases on capacity without a lease$0m$632m$2.92bn$0.00$2.46$11.36
Mining sites at the cost to rebuild them$200m$299m$598m$0.78$1.17$2.33
Mining machines at market value$263m$351m$611m$1.02$1.37$2.38
Company overhead−$450m−$300m−$250m−$1.75−$1.17−$0.97
Construction money already raised and set aside$0m$0m$0m$0.00$0.00$0.00
Money owed by related parties$0m$0m$0m$0.00$0.00$0.00
Cash and bitcoin, less debt and other claims−$810m−$810m−$810m−$3.15−$3.15−$3.15
Value of the shares−$277m$1.57bn$4.89bn$0.00$6.12$19.06

256.8 million shares, including warrants that cost almost nothing to exercise. Value per share never goes below zero; the chart shows the value before that floor. Stock-market value of the company: $1.59bn.

How each block is valued for CLSK

The ten blocks of the standard, in order, with what is counted for CleanSpark, Inc., its central value per share and the findings of this edition's review. OK rules met with company documents · Limit a known limit of the method · Open a document, figure or decision is needed · Fix a rule is broken.

Block and ruleWhat is countedCentral, $ a shareStatusFindings
Signed leasesA year of operating income ÷ cap rate by tenant credit, discounted to the year the lease is fully running, less construction still to pay.1 lease, 175 MW of server load$5.45Limit
  • Sandersville, Georgia — Anviran, LLC (a Meta subsidiary; Meta guarantees rent and operating expenses), 175 MW, 20 years: construction cost not disclosed; the standard $11.9m per megawatt of server load is used.
GPU cloud contractsCash margin over the contract, plus what the GPUs are worth at the end, less the GPUs not yet delivered.none$0.00OK—
Capacity breakdownEvery megawatt the company reports in one status; the statuses add up to the company's total within 0.5%.1,800 MW of grid power in 7 statuses—Open
  • Other mining sites (Georgia, Tennessee, Wyoming, Mississippi): 665.0 MW is our estimate (company total less the sites it lists).
Capacity without a leaseChance of a lease × (data-centre value after its full build cost − the mining site it replaces), never below zero.1,550 MW that could be leased$2.46Limit
  • Chances of a lease for powered sites (30% central, calibrated on observed leasing, rule B4.5) and the pipeline (5% central, our assumption) are one chance per status, reviewed for version 1.0.
Mining sitesOperating mining megawatts × the cost to rebuild one megawatt, without machines; leased megawatts carry no mining value.665 MW$1.17Limit
  • 665 MW at $0.45m per MW, the cost to rebuild from filed build costs (rule B5.4); operating sites sold for about $0.4–0.7m per MW including machines in 2026.
Mining machinesFleet value from the site's miner net asset value standard, or installed hashrate × $7.05 per terahash per second.$351m$1.37OK—
Company overheadA landlord's yearly overhead × 10, the same for every company.$300m−$1.17Limit
  • $30m a year × 10 in the central scenario for every company; the company's own overhead and share-based pay are used from version 1.0.
Construction money and other assetsConstruction money already raised and set aside is deducted; money owed by related parties counts only in the optimistic scenario.—$0.00OK
  • Nothing to count.
Debt, cash and bitcoinDebt at face value, outside shareholders and customer prepayments are subtracted; cash and bitcoin at market are added.balance sheet of 30 June 2026−$3.15Open
  • Balance sheet of 30 June 2026, more than 120 days old; the next report replaces it.
  • Bitcoin count of 30 September 2026, more than 45 days old.
  • Values are before tax, as for a real-estate investment trust; a tax deduction comes with version 1.0.
SharesShares outstanding plus warrants that cost almost nothing to exercise.256.8 million—OK
  • 256.8 million shares.

The values add up to the central value per share before the floor at zero ($6.12). Findings marked «Open» are also listed under Open points when they concern a figure of this report.

Signed leases and GPU cloud contracts

LeaseMW of server loadContract valueTermOperating income, year 1 (central)Tenant creditCap rate (central)Fully running fromConstruction still to pay (central)Value, cautiousValue, centralValue, optimisticSource of the terms
Sandersville, Georgia — Anviran, LLC (a Meta subsidiary; Meta guarantees rent and operating expenses), 175 MW, 20 yearsOperating income of $254m in 2029, the first full year, from the company's rent schedule: rent starts on 30 November 2027, rises 3% a year and totals $6.56bn over the base term; the operating margin is about 100% because the tenant pays the property costs (a triple-net lease). Build cost $11.9m per megawatt of server load, as the company discloses. Rent of 2027–2028, before the lease is fully running, is not counted.175$6.56bn20 years, rent +3% a year$254minvestment grade6.5%1 Jan 2029$2.08bn$520m$1.40bn$1.83bnCompany filing

Operating income, year 1: the figure the company discloses, or the first-year rent times the operating margin; where only the total contract value is known, the first-year rent is worked back from it with the yearly rent increase. Cap rate: a year's operating income divided by the property value; it is lower for tenants with an investment-grade credit rating. Source of the terms: a company filing or statement confirms a lease; terms from a secondary source or our own estimate are marked and listed as open points until a filing confirms them. The documents behind each lease are listed under Sources.

Capacity breakdown

Total: 1,800 MW of grid power. 1.8 GW of contracted power (quarterly report and operating update), the figure used on the site's capacity pages. The statuses below add up to 1,800.0 MW (difference +0.0).

StatusMWof which mining sitesMining sites (central)Value with the chance of a lease (central)Value if all leased (central)Build cost if all leased (central)
Signed leaseA signed lease or colocation contract for an AI or high-performance computing data centre.250.0——$1.40bn$1.40bn—
Letter of intent or exclusivityA tenant has signed a letter of intent, an exclusivity, a reservation right or a right of first offer, but no lease yet.885.0——$481m$1.07bn$7.37bn
Powered, no tenantPower is connected or contracted, but there is no tenant.665.0665.0$299m$450m$803m$5.54bn

For signed leases and GPU cloud contracts the value columns show the contracts themselves. For the other statuses they show the mining sites plus what a new lease would add over them.

Capacity without a lease

Site or groupStatusMWCompany's shareMining sites, MWChance of a lease: cautious / central / optimisticData-centre value (central)Mining sites (central)Added value with the chance (central)Added value if leased (central)Build cost if leased (central)
Texas sites (Austin and Brazoria counties) — exclusivity given to the Sandersville tenantLetter of intent and exclusivity signed by the Sandersville tenant on 10 July 2026 over 718 acres with up to 885 MW (current report on form 8-K of 14 July 2026).Letter of intent or exclusivity885.0100%—5% / 45% / 60%$1.07bn—$481m$1.07bn$7.37bn
Other mining sites (Georgia, Tennessee, Wyoming, Mississippi) our estimateOur estimate: 1,800 MW in total less Sandersville and Texas. Operating mining sites; CleanSpark used 808 MW in September 2026, including Sandersville before its conversion.Powered, no tenant665.0100%665.010% / 30% / 50%$803m$299m$151m$503m$5.54bn

Data-centre value: the company's share × megawatts of server load × what one megawatt of AI data centre is worth after paying its full build cost. In the central scenario that is $1.72m per megawatt of server load for powered sites and sites with a letter of intent, and $1.54m for the pipeline; in the cautious scenario it is zero, because new building does not earn its cost. Server load is taken as 70% of grid power in the central scenario. Added value = chance of a lease × (data-centre value − mining sites it replaces), and never below zero.

If all capacity were leased

MeasureCautiousCentralOptimistic
Added value with the chance of a lease, $ a share$0.00$2.46$11.36
Added value if all capacity were leased, $ a share$0.00$6.12$20.16
Value per share with the chance of a lease$0.00$6.12$19.06
Value per share if all capacity were leased$0.00$9.78$27.86

Weighted average if all capacity were leased: $11.44. Building it would cost $12.91bn in the central scenario, 8.1 times the company's stock-market value. Share of the unleased capacity that the share price treats as leased: 42%.

Central value per share against the share of unleased capacity that gets leased

The same chance applied to every site without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.

CleanSpark, Inc.: central value per share against the share of unleased capacity that gets leasedCentral value per share if the same chance, from 0% to 100%, applied to all capacity without a lease (letters of intent, powered sites without a tenant, pipeline); the dashed line is the share price.$0$2$4$6$9$110%20%40%60%80%100%0% of the capacity without a lease leased: $3.66 a share10% of the capacity without a lease leased: $4.27 a share20% of the capacity without a lease leased: $4.89 a share30% of the capacity without a lease leased: $5.50 a share40% of the capacity without a lease leased: $6.11 a share50% of the capacity without a lease leased: $6.72 a share60% of the capacity without a lease leased: $7.33 a share70% of the capacity without a lease leased: $7.95 a share80% of the capacity without a lease leased: $8.56 a share90% of the capacity without a lease leased: $9.17 a share100% of the capacity without a lease leased: $9.78 a shareshare price $6.21matches the share price: 42%all leased: $9.78

Mining

ItemCautiousCentralOptimistic
Operating mining sites, 665.0 MW, at the cost to rebuild them$200m at $0.30m per MW$299m at $0.45m per MW$598m at $0.90m per MW
Mining machines at market value$263m$351m$611m

Fleet value from the site's miner net asset value standard (version 1.2). The cost to rebuild a site excludes the machines. Operating sites sold in 2026 for about $0.4–0.7m per megawatt including the machines; the central value with sites at $0.5m per megawatt is under What moves the result.

Balance sheet and market data

Share price (18 Nov 2026)$6.21Balance sheet date30 Jun 2026
Debt at face value$4.09bnCash, including cash set aside$2.43bn
Outside shareholders in subsidiaries$0mBitcoin held13,530 BTC = $852m
Customer prepayments, counted as debt$0mConstruction money already raised (central)$0m
Shares, million256.8MW on the site's capacity pages: energised / committed / pipeline808 / 1,800 / 1,800

Balance sheet at 30 June 2026 (the annual report for fiscal 2026 is still to come); debt and cash include the $2,276m Sandersville notes of 25 September 2026; bitcoin count 13,530 at 30 September 2026 (operational update of 9 October 2026), of which 3,475 posted as collateral for derivatives.

What moves the result

Change, central scenarioValue per shareDifference
Central scenario as it is$6.12
No new leases on capacity without a lease$3.66−$2.46
Cap rates 0.5 percentage points lower$8.59$2.47
Cap rates 0.5 percentage points higher$4.00−$2.13
Chances of new leases doubled$8.58$2.46
Build cost 10% higher$3.85−$2.27
Mining sites at $0.5m per MW (level of 2026 site sales)$6.21$0.09
Mining sites not counted$5.31−$0.82

Updates

Data cut of this edition18 Nov 2026 (balance sheet of 30 Jun 2026; 10-Q, 10-K, 8-K)
Latest close and market value$5.53 on 23 Nov 2026; market value $1.42bn (at the data cut $6.21 and $1.59bn) — loaded every US trading day at 04:00 Moscow time
Next report expected24 Nov 2026 — Earnings release (estimated from the same report a year earlier)
Next edition due30 Nov 2026 — quarterly re-cut
Since the data cutbitcoin −2.8%; share count −0.0% (new edition when bitcoin moves more than 20% or the share count more than 5%)

SEC filings since the data cut

No filing since 18 Nov 2026 (EDGAR checked 24 Nov 2026).

Each new filing is assessed automatically for this valuation: a quarterly or annual report means a new edition within 10 business days; a new lease, letter of intent, GPU contract, financing or closed purchase within 5. All filings of CLSK are in the SEC filings feed; the order of updates is section 9 of the standard.

Does this report agree with the rest of the site?

Every figure that another page of the site also shows for CLSK, side by side. Same: equal within rounding. Explained: different by rule — a later share price on a daily page, face value of debt here against carrying value on the company card, issues or repayments after the balance sheet, another source for the share count. To check: a difference without a stated reason.

PageWhat is comparedThis reportOther pageResult
Valuation summary tableValues per share in the table of all companies$6.12 central$6.12 centralSame
This reportParts of the value add up to the value of the sharesthree scenariossum of the partsSame
Formula workbookSame numbers in the spreadsheet of formulas840 values, all companies0 differencesSame
Independent recomputationSame numbers from a separate script written from the standard4 valueslargest difference 0e+00Same
Value per MWBalance-sheet date2026-06-302026-06-30Same
Value per MWDebt, $m4,087.64,087.6Same
Value per MWCash incl. restricted, $m2,425.42,425.4Same
Value per MWBitcoin held13,53013,530Same
Value per MWMW operating (D1)808.0808.0Same
Value per MWMW of grid power (D3)1,8001,800Same
Value per MWShares, million256.8256.8Same
Value per MWShare price$6.21 on 2026-11-18$5.53 on 2026-11-23Explained the daily page shows the latest close; this edition uses the close of its data cut (shown as Latest close on this page)
Miner NAVMining machines at market value, $m350.6350.6 (NAV v1.2, 2026-11-16)Same

Open points

  • The balance sheet is dated 30 June 2026, more than 120 days before the valuation date; a newer report is expected.
  • The bitcoin count is from 30 September 2026, more than 45 days before the valuation date (the limit of the site's equity valuation standard); a newer count is expected with the next report.
  • Rent before the Sandersville lease is fully running is not counted: the company's schedule has $5m in 2027 and $220m in 2028 (about $0.78 a share in the central scenario, discounted at the contract rate); the rule is reviewed for version 1.0.
  • Part of the Sandersville build was paid before 30 June 2026 (construction in progress at all sites was $81.8m at that date, of which the Sandersville share is not disclosed); the full build cost is deducted while that cash is already gone from the balance sheet, so the value may be up to about $0.30 a share too low until the annual report shows what is left to spend.
  • Cash includes the net proceeds of the $2,276m Sandersville notes issued at 98.5% on 25 September 2026 ($2,219m after fees, our estimate); part of them reimburses earlier spending and part funds a debt-service reserve.
  • Other mining sites (Georgia, Tennessee, Wyoming, Mississippi): 665.0 MW is our estimate (the company's total less the sites it lists), not a figure the company gives.

Sources

  1. Investor presentation furnished with the current report on form 8-K of 17 September 2026, pages 3-4: rent schedule, 3.0% yearly increases, about 100% operating margin, about $11.9m per megawatt of server load, Meta guarantee — sec.gov
  2. Press release furnished with the current report on form 8-K of 14 July 2026: 175 MW of server load, 20 years, triple net, $6.6bn — sec.gov
  3. Current report on form 8-K of 14 July 2026, item 8.01: letter of intent and exclusivity over 718 acres with up to 885 MW — sec.gov
  4. Our estimate from the capacity breakdown
  5. Share price, balance sheet and capacity: the site's market data file of 18 Nov 2026 (src/data/mining/capacity_daily.json, frozen copy).
  6. Latest close: the same market data file as it rolls daily (src/data/mining/capacity_daily.json); it moves the price comparison only, not the value per share.
  7. Assumptions and their sources: assumptions of the three scenarios; rules: the standard.

Data behind this report

This report as data: clsk.json · input fingerprint b40059cbfd5980d94d9590bd49d20b176a680e9f969aca8e51c409f4e8acd084 · data passport · reproduction kit.

← CIFR · All companies · CORZ →